05000293/FIN-2015004-01
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Inadequate Implementation of Corrective Action following Winter Storm Juno |
| Description | The inspectors identified a Green NCV of 10 CFR 50, Appendix B, Criterion XVI, Corrective Actions, because Entergy did not adequately implement corrective actions for an identified condition adverse to quality. Specifically, Entergy did not implement all of the procedure changes needed to ensure shutdown cooling was placed in service in a timely manner after plant shutdown in preparation for or during a severe winter storm. Entergy entered this issue into the CAP as CR 2016-0120 and updated procedure 2.1.42 to meet the requirements of the corrective actions in CR 2015-0558. Inspectors verified that the new procedure revision included the required actions. The inspectors determined this performance deficiency is more than minor because it is associated with the procedure quality attribute of the Barrier Integrity cornerstone, and adversely affected its objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. The inspectors determined that this finding is of very low safety significance (Green) in accordance with IMC 0609, Attachment 4 and Exhibit 3 of Appendix A, because it did not represent an actual open pathway in the physical integrity of reactor containment, containment isolation system, and heat removal components. The inspectors determined that this finding has a cross-cutting aspect in the area of Human Performance, Procedure Adherence, because Entergy staff did not ensure procedure revisions were made in accordance with the requirements of EN-LI-102, Corrective Action Program. |
| Site: | Pilgrim |
|---|---|
| Report | IR 05000293/2015004 Section 4OA2 |
| Date counted | Dec 31, 2015 (2015Q4) |
| Type: | NCV: Green |
| cornerstone | Barrier Integrity |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | A Allen A Burritt B Dionne B Scrabeck E Carfang J Deboer J Pfingstein P Presby T Dunn T Fish T Hedigan S Elkhiamy |
| Violation of: | 10 CFR 50 Appendix B Criterion XVI |
| CCA | H.8, Procedure Adherence |
| INPO aspect | WP.4 |
| ' | |
Finding - Pilgrim - IR 05000293/2015004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Pilgrim) @ 2015Q4
Self-Identified List (Pilgrim)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||