4 GPU Nuclear Corporation
- Nuclear m:ntr'"
Middletown, Pennsylvania 17057-0480 (717)944-7621 Writer's Direct Dial Number:
(717) 948-8005 April 6 1995 i
C311-9fi-2165 I
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
Dear Sir:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 LER 95-001-00 1
The purpose of this letter is to transmit Licensee Event Report (LER) No.
95-001-00 regarding a reactor coolant leak caused by the failure of a Parker Hannifin instrument tube compression fitting that was found to have been inadequately tightened when the instrument was installed as part of a modification between 1984 and 1985. The leak was isolated and the plant continued to operate at full power throughout the event. The abstract provides a brief description of the event.
The event did not adversely affect the health and safety of the public.
Sincerely, b
MM i
T. G. Broughton Vice President and Director, TMI WGH Attachments cc:
Administrator, Region I THI Senior Resident Inspector TMI Senior NRC Project Manager T T O O /f n
$$41gDCK05000289 159 950406 i
S GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation g
- -