| Q | CCA | Title |
---|
05000282/FIN-2012007-02 | 2012Q3 | | Failure to Perform Maintenance Rule Evaluations After Discovering Degraded Radiation Monitors |
05000282/FIN-2012011-02 | 2012Q3 | H.7 | Inadequate Procedure for Draining of Reactor Coolant System |
05000282/FIN-2012011-01 | 2012Q3 | P.3 | Failure to Take Corrective Action for Reactor Coolant System Level Indication Issues |
05000282/FIN-2012004-01 | 2012Q3 | H.2 | Failure to Perform Adequate Past Operability Evaluations After Discovering Degraded Component Cooling Heat Exchangers |
05000282/FIN-2012011-03 | 2012Q3 | H.7 | Failure to Update the Calculations for Steam Generator Draining |
05000282/FIN-2012007-03 | 2012Q3 | | Lack of Design Basis Information for Steam Exclusion Damper Leakage |
05000282/FIN-2012004-02 | 2012Q3 | | Unit 1 Required Shutdown Due to D1 and D2 Emergency Diesel Generator Exhaust Fires |
05000282/FIN-2012007-01 | 2012Q3 | | Number of Air Receivers Required to Be Greater than 480 PSIG to Support EDG Operability |
05000282/FIN-2012504-01 | 2012Q4 | H.13 | Degraded Emergency Action Level Scheme |
05000282/FIN-2012005-06 | 2012Q4 | | Concerns with Analytical Methods Used for Predicting Void Transport Behavior |
05000282/FIN-2012005-01 | 2012Q4 | H.4(n) P.2 | Failure to Disposition a Relevant Snubber Indication in Accordance with the ASME Code |
05000282/FIN-2012005-02 | 2012Q4 | H.14 | Inadequate Evaluation of Operating Crew During Annual Requalification Examination |
05000282/FIN-2012005-03 | 2012Q4 | | Failure to Replace Rubber Hoses on D5 and D6 EDG in Accordance with Vendor Recommendations |
05000282/FIN-2012005-04 | 2012Q4 | H.5 | Failure of Seasonal Readiness Procedure to Identify Operability Issues |
05000282/FIN-2012005-05 | 2012Q4 | P.2 | Failure to Demonstrate Performance or Condition of Radiation Monitors Were Effectively Controlled Through the Performance of Maintenance |
05000282/FIN-2013002-08 | 2013Q1 | P.5 | Failure to Correct Condition Adverse to Quality on the D1 EDG |
05000282/FIN-2013002-07 | 2013Q1 | H.8 | Failure to Provide Accurate Performance Indicator Data |
05000282/FIN-2013002-06 | 2013Q1 | H.8 | Failure to Provide Accurate Performance Indicator Data |
05000282/FIN-2013002-05 | 2013Q1 | P.3 | Improperly Sized Motor Overload Heaters Render D6 EDG Inoperable |
05000282/FIN-2013002-04 | 2013Q1 | P.5 | Inadequate Work Instructions for Foreign Material Removal from D2 EDG Air Start Piping |
05000282/FIN-2013002-03 | 2013Q1 | H.12 | Failure to Follow Procedure During Fuse Removal Activities |
05000282/FIN-2013002-02 | 2013Q1 | P.2 | Failure to Correct Condition Adverse to Quality for Valve SI-6-4 |
05000282/FIN-2013002-01 | 2013Q1 | H.5 | Failure to Properly Secure Materials Near Critical Drainage Path |
05000282/FIN-2013407-01 | 2013Q2 | | Security |
05000282/FIN-2013403-02 | 2013Q2 | | Security |
05000282/FIN-2013403-01 | 2013Q2 | H.8 | Security |
05000282/FIN-2013007-03 | 2013Q2 | | Failure to Demonstrate the Ability to Transfer Diesel Fuel Oil Between Unit 1 Fuel Oil Tanks |
05000282/FIN-2013007-02 | 2013Q2 | | Failure to Review the Suitability of the Cl Strainers Under POST-SEISMIC Flow Conditions |
05000282/FIN-2013007-01 | 2013Q2 | | Failure to Verify the Adequacy of Cooling Water System Design |
05000282/FIN-2013003-02 | 2013Q2 | P.3 | Failure to Monitor SSCs as Required by 10 CFR 50.65 |
05000282/FIN-2013003-01 | 2013Q2 | P.5 P.2(b) | Improper Work Instructions Rendered D1 EDG Inoperable |