Title | Failure to Implement Appropriate Design and Configuration Control for the Unit 2 Polar Crane |
Description | A finding of very low significance was self-revealed for the failure to implement appropriate design and configuration control for the Unit 2 polar crane upgrade project, which resulted in issues associated with reliable operation of the polar crane during the first reactor vessel head lift. Specifically, a lack of configuration control on the crane radio system resulted in a loss of radio communications during the initial reactor vessel head lift over the reactor vessel head stand, which resulted in unreliable crane operation. The licensee implemented remedial corrective actions to address the design issues with the polar crane bridge drive motors which resulted in unavailability at the beginning of the outage and ensured the radio receivers were appropriately configured and installed. The licensee performed a root cause analysis to determine the cause of the design and configuration control issues associated with the polar crane and developed additional corrective actions to address this performance deficiency. The finding was determined to be more than minor because it is associated with the Initiating Events Cornerstone attribute of design control and affected the cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The finding is of very low safety significance (Green) because the finding did not meet the criteria for a Phase 2 or Phase 3 Analysis, as specified in IMC 0609 Appendix G, Attachment 1, Checklist 3. The inspectors did not identify a cross-cutting aspect associated with this finding. (Section 1R19.2 |
Site: | Point Beach |
---|---|
Report | IR 05000266/2008003 Section 1R19 |
Date counted | Jun 30, 2008 (2008Q2) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | M Kunowski R Krsek S Ghasemian M Jones R Langstaff R Ruiz R Winter J Jandovitz T Bilik W Slawinski C Brown |
INPO aspect | |
' | |
Finding - Point Beach - IR 05000266/2008003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Point Beach) @ 2008Q2