| Q | CCA | Title |
---|
05000263/FIN-2009005-02 | 2009Q4 | P.2 | Failure to Make Required Eight Hour Event Report per 10CFR50.72(b)(3)(v) |
05000263/FIN-2009201-01 | 2009Q4 | P.2 | Security |
05000263/FIN-2009007-05 | 2009Q4 | | EDG Fuel Oil Supply System Design does not meet the single failure criteria |
05000263/FIN-2009005-01 | 2009Q4 | P.1 P.1(a) | Inadequate Maintenance Procedure for A SBGT System |
05000263/FIN-2009005-03 | 2009Q4 | | MSPI Basis Document does not Reflect Current Plant Configuration for RHRSW |
05000263/FIN-2009007-06 | 2009Q4 | | Inadequate Tornado Missile Protection for the EDG System Components |
05000263/FIN-2009007-07 | 2009Q4 | | Pipe Support Design Deficiencies |
05000263/FIN-2009007-04 | 2009Q4 | | Inadequate Testing for MCC Contactors |
05000263/FIN-2009007-03 | 2009Q4 | | Failure to Adquately Evaluate Minimum Voltage Available at Safety-Related Electrical Components |
05000263/FIN-2009007-02 | 2009Q4 | P.2 | ESW Piping Supports Did Not Meet Seismic Category 1 Design Basis Requirements |
05000263/FIN-2009007-01 | 2009Q4 | | Calculation Errors Associated With the Pneumatic Pressure Requirements for the Inboard MSIVs |
05000263/FIN-2010006-01 | 2010Q1 | H.9 | Failure to Perform 10 CFR 50.59 Evaluation For Isolation of Room Cooler Which Addressed Temperature Limitations |
05000263/FIN-2010002-03 | 2010Q1 | P.2 | Inadequate Corrective Actions for Unexpected SRV Low Low Set Trips Encountered During Surveillance Testing |
05000263/FIN-2010002-02 | 2010Q1 | H.13 | SRV Low Low Set Surveillance Procedure Implementation |
05000263/FIN-2010002-01 | 2010Q1 | | Reactor Building Crane Design and Licensing Basis Issues |
05000263/FIN-2010009-01 | 2010Q1 | | Failure of an NDE Technician to Follow an Ultrasonic Thickness Examination Procedure |
05000263/FIN-2010003-02 | 2010Q2 | H.4 H.5 | Unacceptable Preconditioning of 250 Vdc Battery Chargers |
05000263/FIN-2010003-01 | 2010Q2 | H.5 | Failure to Comply with Turbine Floor Heavy Lift Procedure |
05000263/FIN-2010004-01 | 2010Q3 | H.5 | Inadequate Electrical Isolation during Demolition Activity |