| Q | CCA | Title |
---|
05000263/FIN-2009008-01 | 2009Q1 | H.8 | Failure to Notify the NRC of a Permanent Illness or Disability of a Licensed Operator |
05000263/FIN-2009008-02 | 2009Q1 | H.8 | Failure to Provide Complete Information to the NRC which Impacted a Licensing Decision. (Section 1R11) |
05000263/FIN-2009002-02 | 2009Q1 | H.2 | Failure to Adequately Evaluate Temporary Changes to RCIC Surveillance Procedures Prior to Implementation |
05000263/FIN-2009002-01 | 2009Q1 | H.14 | Use of Non-Quality Documents in the Absence of Approved Procedures to Modify the Normal Operation of IRM 11 and IRM 18 |
05000263/FIN-2010008-01 | 2009Q2 | | Potential concern with the one-time inspection program related to butt welds |
05000263/FIN-2009006-02 | 2009Q2 | | Potential Failure to Follow Procedures |
05000263/FIN-2009006-01 | 2009Q2 | | One-Time Inspection Program Implementation |
05000263/FIN-2009006-03 | 2009Q2 | | Adequacy of the One-Time Inspection Program |
05000263/FIN-2009003-01 | 2009Q2 | H.8 | Failure to Comply with Technical Specification and RWP Requirements during Work in a Locked High Radiation Area |
05000263/FIN-2009004-02 | 2009Q3 | H.14 | Failure to Appropriately Implement TS 3.6.4.3 |
05000263/FIN-2009004-01 | 2009Q3 | | Preconditioning of Safety Related Pressure Switches During Surveillance Testing |
05000263/FIN-2009201-01 | 2009Q4 | P.2 | Security |
05000263/FIN-2009005-02 | 2009Q4 | P.2 | Failure to Make Required Eight Hour Event Report per 10CFR50.72(b)(3)(v) |
05000263/FIN-2009005-01 | 2009Q4 | P.1 P.1(a) | Inadequate Maintenance Procedure for A SBGT System |
05000263/FIN-2009007-07 | 2009Q4 | | Pipe Support Design Deficiencies |
05000263/FIN-2009007-04 | 2009Q4 | | Inadequate Testing for MCC Contactors |
05000263/FIN-2009007-03 | 2009Q4 | | Failure to Adquately Evaluate Minimum Voltage Available at Safety-Related Electrical Components |
05000263/FIN-2009007-02 | 2009Q4 | P.2 | ESW Piping Supports Did Not Meet Seismic Category 1 Design Basis Requirements |
05000263/FIN-2009007-01 | 2009Q4 | | Calculation Errors Associated With the Pneumatic Pressure Requirements for the Inboard MSIVs |
05000263/FIN-2009007-06 | 2009Q4 | | Inadequate Tornado Missile Protection for the EDG System Components |
05000263/FIN-2009005-03 | 2009Q4 | | MSPI Basis Document does not Reflect Current Plant Configuration for RHRSW |
05000263/FIN-2009007-05 | 2009Q4 | | EDG Fuel Oil Supply System Design does not meet the single failure criteria |