Response to NRC Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations
ML092300114
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/10/2009
From: Matthew Sunseri
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-09-011, WO 09-0021
Download: ML092300114 (2)


Text

WF CREEK NUCLEAR OPERATING CORPORATION Matthew W. Sunseri Vice President Operations and Plant Manager August 10, 2009 WO 09-0021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: Response to NRC Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations Gentlemen:

Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations, requests Licensees to voluntarily submit information to aid in the preparation and scheduling of operator licensing examinations.

In response to RIS 2009-11, Wolf Creek Generating Station is providing an estimate of the number of generic fundamentals exams for the years 2010 and 2011, as well as the number of license exams for the years 2010 through 2013. Enclosed with this letter is the completed NRC Form 536 containing Wolf Creek Generating Station's operator licensing examination data.This letter contains no commitments.

If you have any questions concerning this matter, please contact me at (620) 364-4008, or Mr. Richard D. Flannigan at (620) 364-4117.Sincerely, Matthew W. Sunseri MWS/rlt Enclosure cc: E. E. Collins (NRC), w/e V. G. Gaddy (NRC), w/e R. E. Lantz (NRC), w/e B. K. Singal (NRC), w/e Senior Resident Inspector (NRC), w/e t ..P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCIVET , -il)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1O-2008)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments rardin burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U.S.OPERATOR LICENSING Nuclear Regulatoy Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-neaito infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulato Affairs, NEOB-10202, (3150-0131).

Office of Management and Budget. Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Wolf Creek Generating Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 NUMBER OF REACTOR 0 4 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 3 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 08/29/2011 08/19/2013 ALTERNATE DATE 09/05/2011 08n26/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 10 CY il PRO POSED _ _ 10 ___11 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES F NRC FORM 536 (10-21M91 PRINTED ON RECYCLED PAPER