MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Schedule and Calendars
MONTHYEARET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-26026 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events WO 10-0049, Response to NRC Regulatory Issue Summary (RIS) 2010-08, Preparation and Scheduling of Operator Licensing Examinations.2010-07-22022 July 2010 Response to NRC Regulatory Issue Summary (RIS) 2010-08, Preparation and Scheduling of Operator Licensing Examinations. WO 09-0021, Response to NRC Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations2009-08-10010 August 2009 Response to NRC Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations WO 08-0016, Response to NRC Regulatory Issue Summary (RIS) 2008-16, Preparation and Scheduling of Operator Licensing Examinations2008-07-25025 July 2008 Response to NRC Regulatory Issue Summary (RIS) 2008-16, Preparation and Scheduling of Operator Licensing Examinations ML0709301752007-04-0909 April 2007 Revision of Schedule for the Conduct of Review of the Wolf Creek Generating Station, Unit 1, License Renewal Application 2014-02-26
[Table view] |
Text
April 9, 2007Mr. Terry J. GarrettVice President Engineering Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
REVISION OF SCHEDULE FOR THE CONDUCT OF REVIEW OF THE WOLFCREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATION
Dear Mr. Garrett:
Enclosed is a revised schedule for review of the Wolf Creek Generating Station, Unit 1,license renewal application. The original schedule was affected because the NRC operated for several months under a Continuing Resolution. Therefore, the schedule has been revised to add four months that will allow us to recover from this delay. If you have any questions on the revised schedule, please contact me by telephone at 301-415-3703 or via e-mail at VMR1@nrc.gov
.Sincerely,/RA/Verónica M. Rodríguez, Project ManagerLicense Renewal Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-482
Enclosure:
Revised Schedulecc w/encl: See next page
ML070930175 OFFICELA:DLRPM:RLRB:DLRPM:REBB:DLRBC:REBB:DLRBC:RLRB:DLRNAMEIKingVRodríguezCJacobsRFranovichRAuluck DATE04/04/0704/09/0704/05/0704/05/0704/09/07 EnclosureWOLF CREEK GENERATING STATION, UNIT 1LICENSE RENEWAL APPLICATIONREVISION OF SCHEDULEMilestoneScheduleActualReceive License Renewal Application (LRA)09/27/0610/04/06Publish Federal Register Notice (FRN) - LRA receipt and availability10/14/0610/12/06Publish FRN - LRA acceptability, environmental scoping period, andopportunity for hearing 11/30/0611/30/06Public Meeting - license renewal process and environmental scoping12/19/0612/19/06Audit - scoping and screening methodology01/08-12/0701/08-12/07 Environmental scoping periods ends01/29/071/29/07 Audit - environmental03/12-16/0703/12-16/07 Audit - aging management programs (AMPs)03/26-30/0703/26-30/07 Issue environmental requests for additional information (RAIs)04/20/07 Audit - aging management reviews (AMRs)05/07-11/07 Receive responses for environmental RAIs 05/20/07 Audit - Time Limited Aging Analysis (TLAAs) (Optional)06/18-22/07 Issue safety RAIs06/22/07 Receive responses for safety RAIs07/23/07Inspection - scoping, screening, and AMPs 09/10-14/07 Issue draft supplemental environmental impact statement (SEIS)09/25/07Publish FRN - availability and comments on draft SEIS10/09/07 Inspection - scoping, screening, and AMPs 10/22-26/07Public Exit Meeting - scoping, screening, and AMPs inspectionsTBD Public Meeting - draft SEIS11/08/07End of comment period for the draft SEIS12/26/07 Issue safety evaluation report (SER) with open item(s)02/01/08Advisory Committee on Reactor Safeguards (ACRS) subcommitteemeeting on SER with open item(s) 03/ /08Receive responses related to the SER with open item(s) 04/01/08Issue Regional Administrator's letter TBD Issue final SEIS 05/08/08 Publish FRN - availability of final SEIS05/26/08 Issue SER 06/30/08 ACRS full committee meeting on SER09/ /08 Issue ACRS letter 09/17/08 Issue staff recommendation to NRR's Director11/14/08 NRR decision (license issued, if approved and no hearing is granted)11/21/08Commission decision (if hearing is granted)N/A Letter to T. Garrett from V. Rodriguez dated April 9, 2007
SUBJECT:
REVISION OF SCHEDULE FOR THE CONDUCT OF REVIEW OF THE WOLFCREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATIONDISTRIBUTION:HARD COPY DLR RFE-MAIL:PUBLICRWeisman GGalletti SSmith (srs3)
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb
RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDeEqvb
RidsNrrDss RidsOgcMailCenter RidsNrrAdes
VRodriguez
CJacobs JDonohew CLong, RIV GPick, RIV SCochrum, RIV TCombs, OCA VGaddy, RIV LSmith, RIV CLong, RIV DMcIntyre, OPA SBurnell, OPA Wolf Creek Generating Station cc:Jay Silberg, Esq.Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, NW Washington, DC 20037Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-7005Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839Chief Engineer, Utilities DivisionKansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027Office of the GovernorState of Kansas Topeka, KS 66612Attorney General120 S.W. 10 th Avenue, 2 nd FloorTopeka, KS 66612-1597County ClerkCoffey County Courthouse 110 South 6 th StreetBurlington, KS 66839Thomas A. Conley, Section ChiefRadiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366Vice President Operations/Plant ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Supervisor LicensingWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839U.S. Nuclear Regulatory CommissionResident Inspectors Office/Callaway Plant
8201 NRC Road Steedman, MO 65077-1032Kevin J. Moles, ManagerRegulatory Affairs Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Lorrie I. Bell, Project ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708