Semantic search

Jump to navigation Jump to search
 Issue dateTitle
CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change18 April 2007Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change
CPSES-200401136, Transmittal of the Annual Radiological Environmental Operating Report for 200321 April 2004Transmittal of the Annual Radiological Environmental Operating Report for 2003
Information Notice 1998-12, Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers3 April 1998Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers
Information Notice 1998-01, Thefts of Portable Gauges15 January 1998Thefts of Portable Gauges
ML20057B15520 April 1993Final Response to FOIA Request for Documents Re Allegations Made by RM Dow.Forwards Documents Listed in Apps B & C. Documents Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemptions 6 & 7C)
Information Notice 1993-18, Portable Moisture-Density Gauge User Responsibilities During Field Operations10 March 1993Portable Moisture-Density Gauge User Responsibilities During Field Operations
ML20126A41615 December 1992Memorandum & Order Ruling on Intervention Petitions & Terminating Proceeding.* Petitions Denied & Proceeding Terminated.W/Certificate of Svc.Served on 921216
ML20128B87227 November 1992NRC Staff Response to Motion for Rehearing by RM Dow, Petitioner.* Motion for Rehearing Should Be Denied for Reasons Explained in Encl.W/Certificate of Svc
ML20116M31810 November 1992Motion for Prehearing by RM Dow,Petitioner.* Requests Period of Ten Days to File Supplemental Pleading to Original Petition.Certificate of Svc & Statement Encl
ML20099J87514 August 1992TU Electric Answer to Petition for Intervention & Request for Hearings by Dows.* Petition to Intervene Should Not Be Accepted for Filing Because Petition Contains Untrue & Scandalous Allegations.Certificate of Svc & Other Info Encl
ML20245E07619 June 1989Insp Repts 50-445/89-32 & 50-446/89-32 on 890503-0606. Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Followup on Violations/Deviations,Action on 10CFR50.55(e) Deficiencies & Preoperational Testing Audits
ML08269057228 March 1988NRC Information Notice No. 87-44, Supplement 1: Thimble Tube Thinning in Westinghouse Reactors
Information Notice 1988-08, Chemical Reactions with Radioactive Waste Solification Agents14 March 1988Chemical Reactions with Radioactive Waste Solification Agents
Information Notice 1988-07, Inadvertent Transfer of Licensed Material to Uncontrolled Locations7 March 1988Inadvertent Transfer of Licensed Material to Uncontrolled Locations
Information Notice 1988-06, Foreign Objects in Steam Generators29 February 1988Foreign Objects in Steam Generators
Information Notice 1988-05, Fire in Annunciator Control Cabinets12 February 1988Fire in Annunciator Control Cabinets
Information Notice 1988-04, Inadequate Qualification and Documentation of Fire Barrier Penetration Seals5 February 1988Inadequate Qualification and Documentation of Fire Barrier Penetration Seals
Information Notice 1988-03, Cracks in Shroud Support Access Hole Cover Welds2 February 1988Cracks in Shroud Support Access Hole Cover Welds
Information Notice 1987-62, Mechanical Failure of Indicating-Type Fuses8 December 1987Mechanical Failure of Indicating-Type Fuses
Information Notice 1987-61, Failure of Westinghouse W-2-Type Circuit Breaker Cell Switches7 December 1987Failure of Westinghouse W-2-Type Circuit Breaker Cell Switches
Information Notice 1987-60, Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors4 December 1987Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors
Information Notice 1987-57, Loss of Emergency Boration Capability Due to Nitrogen Gas Intrusion6 November 1987Loss of Emergency Boration Capability Due to Nitrogen Gas Intrusion
Information Notice 1987-56, Improper Hydraulic Control Unit Installation at BWR Plants4 November 1987Improper Hydraulic Control Unit Installation at BWR Plants
Information Notice 1987-55, Portable Moisture/Density Gauges: Recent Incidents of Portable Gauges Being Stolen or Lost29 October 1987Portable Moisture/Density Gauges: Recent Incidents of Portable Gauges Being Stolen or Lost
Information Notice 1986-67, Portable Moisture/Density Gauges; Recent Incidents and Common Violations of Requirements for Use, Transportation, and Storage15 August 1986Portable Moisture/Density Gauges; Recent Incidents and Common Violations of Requirements for Use, Transportation, and Storage
ML20140H2594 October 1985First Partial Response to FOIA Request for Documentation Re NRC Overview,Regulation & Investigation of Facility.Forwards Records Re Protective Coating Issues.Documents Also Available in PDR
ML20111B6293 January 1985Transcript of E Mouser 850103 Deposition in Bethesda,Md. Pp 22,527-22,822
ML20140D93917 December 1984Forwards Document Possibly Responsive to Intervenor Request for Security Investigation Rept Re Document Allegedly Stolen from E Mouser.Search of Counsel & Util Files for Document Unproductive.Related Correspondence
ML20154R22419 November 1984Testimony of Jj Lipinsky Re Paint Coatings Program at Facility.Pp 19,691-19,721
ML20107H9895 November 1984Testimony of Jj Lipinsky,Rb Roth,Ra Trallo & Jj Norris Re Consulting Agreement Between Ob Cannon & Son,Inc & Util & Lipinsky Memo.Related Correspondence
ML20098F42228 September 1984Affidavit of Jj Lipinsky Re Trip Rept of 830726-28 Visit to Evaluate Applicant Coatings Program
ML20138L1878 August 1984Transcript of 840808 Hearing in Bethesda,Md Re Questions on Summary Dispositions Filed by Util.Pp 1-209
ML20138L6192 August 1984Transcript of 840802 Technical Interview.Pp 1-37.Portions Deleted
ML20127K57318 May 1984Transcript of D Hatley 840518 Deposition in Glen Rose,Tx Re Operations at Facility
ML20154S3226 April 1984Sanitized Transcript of 840406 Interview W/Hb Griffin, T Ippolito,Te Carpenter & Unnamed Witness in Cleburne,Tx. Pp 1-89
ML20099D33813 February 1984Affidavit of Jj Lipinsky Concerning Trip Rept Job H8301 Re Coatings Program.Related Correspondence
ML20198K5183 August 1983Rev 8 to Prerequisite Test Instruction XCP-ME-4, Sys Cleanliness Verification. Related Info Encl
ML20024D10425 July 1983Affidavit of H Stiner & D Stiner Re Weave & Downhill Welding
ML20198K4799 December 1981Rev 7 to Procedure CPM-13.1, General Calibr Procedure. Related Info Encl