Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML19007A04129 September 2015RS-TD-313196-003, Rev. 0, LACBWR Historical Site Assessment.
ML11019059228 December 2010Boiling Water Reactor - Decommissioning Plan Revision, November 2010
ML08078049010 March 2008Dairyland Power Cooperative Plans for Development of Independent Spent Fuel Storage Facility (ISFSI) at the Site of the La Crosse Boiling Water Reactor (LACBWR) in Genoa, Wisconsin
ML05252026623 August 2005Boiling Water Reactor - Reactor Pressure Vessel (RPV) Removal - NUREG 0612 Compliance
ML05063042517 February 2005Boiling Water Reactor - Transmittal of the Annual Report for 2004, Report of Changes, Tests, and Experiments
ML05026033829 December 2004Dairyland Power Cooperative, La Crosse Boiling Water Reactor (Lacbwr), Annual Decommissioning Plan Revision
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes13 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
ML03111044913 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses3 June 1999Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems22 March 1999Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML20203K00431 December 1997Annual Operating Rept for 1997 - Rept of Changes,Tests & Experiments
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions22 September 1997Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers1 August 1997Fire Endurance Test Results of Versawrap Fire Barriers
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections6 March 1997Problems Identified During Generic Letter 89-10 Closeout Inspections
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room8 January 1997Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials14 November 1995Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials
Information Notice 1995-49, Seismic Adequacy of Thermo-Lag Panels27 October 1995Seismic Adequacy of Thermo-Lag Panels
Information Notice 1995-36, Potential Problems with Post-Fire Emergency Lighting29 August 1995Potential Problems with Post-Fire Emergency Lighting
Information Notice 1993-83, Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power24 August 1995Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites5 June 1995Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites
Information Notice 1995-27, NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide.31 May 1995NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide.
Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking10 March 1995Reactor Vessel Top Guide and Core Plate Cracking
NRC Generic Letter 1995-0126 January 1995NRC Generic Letter 1995-001: NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities
Information Notice 1994-86, Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag22 December 1994Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag
ML0312004432 September 1994Withdrawn - NRC Generic Letter 1994-004: Voluntary Reporting of Additional Occupational Radiation Exposure Data
Information Notice 1991-79, Deficiencies Found in Thermo-Lag Fire Barrier Installation4 August 1994Deficiencies Found in Thermo-Lag Fire Barrier Installation
NRC Generic Letter 1994-0325 July 1994NRC Generic Letter 1994-003: Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors
NRC Generic Letter 1994-0211 July 1994NRC Generic Letter 1994-002: Long-Item Solutions and Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors
NRC Generic Letter 1994-0131 May 1994NRC Generic Letter 1994-001: Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators
Information Notice 1994-24, Inadequate Maintenance of Uninterruptible Power Supplies & Inverters24 March 1994Inadequate Maintenance of Uninterruptible Power Supplies & Inverters
Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems28 May 1993One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems
Information Notice 1993-40, Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material26 May 1993Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material
NRC Generic Letter 1992-0817 December 1992NRC Generic Letter 1992-008: Thermo-Lag 330-1 Fire Barriers
Information Notice 1992-82, Results of Thermo-Lag 330-1 Combustibility Testing15 December 1992Results of Thermo-Lag 330-1 Combustibility Testing
NRC Generic Letter 1992-054 September 1992NRC Generic Letter 1992-005: NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program
Information Notice 1992-28, Inadequate Fire Suppression System Testing8 April 1992Inadequate Fire Suppression System Testing
Information Notice 1992-18, Potential for Loss of Remote Shutdown Capability During a Control Room Fire28 February 1992Potential for Loss of Remote Shutdown Capability During a Control Room Fire
Information Notice 1991-79, Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials6 December 1991Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials
Information Notice 1991-77, Shift Staffing at Nuclear Power Plants26 November 1991Shift Staffing at Nuclear Power Plants
Information Notice 1991-74, Changes in Pressurizer Safety Valve Setpoints Before Installation25 November 1991Changes in Pressurizer Safety Valve Setpoints Before Installation
Information Notice 1991-73, Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve21 November 1991Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
Information Notice 1991-53, Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components4 September 1991Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components
Information Notice 1991-47, Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test6 August 1991Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test
NRC Generic Letter 1991-0629 April 1991NRC Generic Letter 1991-006: Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies, Pursuant to 10 CFR 50.54(f)
NRC Generic Letter 1991-042 April 1991NRC Generic Letter 1991-004: Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle
Information Notice 1990-69, Adequacy of Emergency and Essential Lighting31 October 1990Adequacy of Emergency and Essential Lighting