Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
ML031110449
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River  Entergy icon.png
Issue date: 10/13/1999
From: Matthews D
Office of Nuclear Reactor Regulation
To:
References
NUDOCS 9910060042, OMB-3150-0011, RIS-99-002
Download: ML031110449 (10)


Text

OMB Control No.: 3150-0011 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001 October 13, 1999 NRC REGULATORY ISSUE

SUMMARY

99-02 RELAXATION OF TECHNICAL SPECIFICATION REQUIREMENTS FOR PORC REVIEW OF FIRE PROTECTION PROGRAM CHANGES Addressees All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

Intent The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS) to advise addressees that, based on the guidance provided herein concerning the James A.

FitzPatrick Nuclear Power Plant, they may choose to request a license amendment to their plant technical specifications to change the requirement that the Plant Operating Review Committee (PORC) review the fire protection program and its implementing procedures, for the purpose of alleviating unnecessary burden on the PORC. No action or written response is requested.

Background Information The Commission issued Amendment No. 252 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant on April 12, 1999. The amendment revised the plant technical specifications to alleviate the unnecessary burden on PORC of having to review all changes to the fire protection program and its implementing procedures. The staff found that existing regulatory controls on the fire protection program provide reasonable assurance of the continued effectiveness of the program and that adequate procedural controls are in place to ensure that the screening process for assessing changes to the fire protection program and its implementing procedures will assign technical reviews to appropriately qualified individuals, as necessary, allowing PORC to focus its attention on more significant procedure and program changes.

The following regulatory controls in effect contribute to ensuring the continued effectiveness of the FitzPatrick fire protection program:

AD(

fOoI 6o56b0063)f qqjoj3

- 52 on Iold8se 4bACD fa k4-I991f y ens cS S

I RIS 99-02 October 13, 1999 Page 2 of 4 (1) The FitzPatrick license includes a license condition that the licensee may make changes to the approved fire protection program without prior Commission approval only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(2) Since the fire protection program is included in the FitzPatrick final safety analysis report (FSAR), the provisions of 10 CFR 50.59 apply; this regulation prohibits changes to the facility without prior Commission approval if it is determined that the change constitutes an unreviewed safety question.

(3) The FitzPatrick technical specifications require the Safety Review Committee to inspect and audit the fire protection program.

(4) The FitzPatrick technical specifications require written procedures and administrative policies to implement the fire protection program.

PORC responsibility for reviewing fire protection program requirements was established when these requirements were removed from the FitzPatrick technical specifications in accordance with the guidance in Generic Letter (GL) 88-12, "Removal of Fire Protection Requirements from the Technical Specifications." Subsequently, the licensee established procedural controls for screening written procedures and administrative policies required by the plant technical specifications (including those implementing the fire protection program) for safety and environmental impact. In particular, changes are screened to determine if an activity is described in the FSAR, affects structures, systems, or components described in the FSAR, or involves a test. If so, the activity is assessed to see if it is consistent with FSAR requirements.

If the activity is not consistent with the FSAR, a safety evaluation is completed in accordance with 10 CFR 50.59. Changes are also screened for environmental impact and an environmental impact evaluation may be done. If safety and/or environmental evaluations are required, PORC is required to review them. If the proposed change affects the technical specifications, a license amendment is initiated to revise the technical specifications. Safety and environmental impact screening and required evaluations are completed and approved by qualified individuals.

Summary of Issue The NRC has found that requiring the FitzPatrick PORC to review all changes to the fire protection program and its implementing procedures is unnecessary. Removing this burden on PORC from 'he FitzPatrick technical specifications is acceptable since safety continues to be assured by -ne rigor of the procedural controls in place for fire protection issues and other regulatory controls on the fire protection program. The Background section describes the FitzPatrick review and approval process for fire protection issues and the regulatory controls in place to assure the continued effectiveness of the FitzPatrick fire protection program.

RIS 99-02 October 13, 1999 Page 3 of 4 Permitted Voluntary Action Addressees may submit license amendment requests for their reactor facilities to reduce unnecessary burden on PORC. In doing so, however, addressees must demonstrate that adequate procedural controls and regulatory controls are in place to ensure the effectiveness of the fire protection program will be maintained.

Backfit Discussion This regulatory issue summary requests no action or written response. Any action on the part of addressees to request removing unnecessary burden on PORC, in accordance with the guidance provided in this regulatory issue summary, is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109. Consequently, the staff did not perform a backfit analysis.

Federal Register Notification A notice of opportunity for public comment was not published in the Federal Register because this regulatory issue summary is informational and pertains to a licensing matter that was open to public comment during its promulgation.

Paperwork Reduction Act Statement This regulatory issue summary contains a voluntary information collection that is subject to the Paperwork Reduction Act of 1995 (22 U.S.C. 3501 et seq.). This voluntary information collection was approved by the Office of Management and Budget, approval number 3150-001 1, through September 30, 2000.

The public reporting burden for this voluntary collection of information is estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per response, including the time to read the instructions, search existing data sources, gather and maintain the data needed, and organize the data. The U.S. Nuclear Regulatory Commission is seeking public comment on the potential impact of the collection of information described in the regulatory issue summary and on the following questions:

(1) Is the proposed collection of information necessary for the proper performance of the functions of the NRC, and will the information be useful?

(2) Is the estimate of burden accurate?

(3) Is there a way to enhance the quality, utility, and clarity of the information to be collected?

(4) How can the burden of the collection of information be minimized? Can automated collection techniques be used?

RIS 99-02 October 13, 1999 Page 4 of 4 Send comments on any aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, T-6F33, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202 (3150-0011), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

If there are any questions about this matter, please contact one of the persons listed below, or the appropriate Office of Nuclear Reactor Regulation project manager for a specific nuclear power plant.

David B.MthwD Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical

Contact:

Phillip M. Qualls, NRR 301-415-1849 E-mail: pmq@nrc.gov Lead Project Manager: Andrew J. Kugler, NRR 301-415-2828 E-mail: ajkl@nrc.gov

Attachment 1 RIS 99-02 October 13, 1999 Page 1 of 1 LIST OF RECENTLY ISSUED NRC REGULATORY ISSUE

SUMMARY

Regulatory Issue Date of Summary No. Subject Issuance Issued to 99-01 Revision To The Generic 10/4/99 All NRC licensees Communications Program OL = Operating License CP = Construction Permit

RIS 99-03 Month xx, 1999 Page 4 of 4 Send comments on any aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, T-6F33, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202 (3150-0011), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

If there are any questions about this matter, please contact one of the persons listed below, or the appropriate Office of Nuclear Reactor Regulation project manager for a specific nuclear power plant.

David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical

Contact:

Phillip M. Qualls, NRR 301-415-1849 E-mail: PMQ@NRC.GOV Lead Project Manager: Andrew J. Kugler, NRR 301-415-2828 E-mail: AJK1 @NRC.GOV DISTRIBUTION: Central File REXB R/F JWShapaker KSWest JNHannon AJKugler PMQualls DOCUMENT NAME: C:\wp\wpdocs\tacs\MA5476\jws2west.dgl.wpd

  • SEE PREVIOUS CONCURRENCE Regarding this document, indicate in the box: C=copy w/o attachment/enclosure, E=copy with attachmentlenclosure, or N=no copy OFFICE PECB/DRIP lE SPLB/DSSA E C:SPLB/DS A D:DSSA Yil; NAME JWShapake KSWest
  • JNHannon 1 GMHolahan f DATE 9/'a /99 9/ /I /99 921 /99 9/2 t /99 OFFICE OCIO GC . l E C:PECB/DRIP ' D:DRIP NAME PKleene (TchEd) LBMarsh DBMatthews DATE 9/19 /99 9Lg/, /99 9/ /99 9/ /99 OFFICIAL RECORD COPY

DISTRIBUTION: Central File REXB R/F JWShapaker KSWest JNH onAJKugler DOCUMENT NAME: C:\wp\wpdocs\tacs\MA5476\TE ED.VER.wpd

  • SEE PREVIOUS CONCURRENCE Regarding this document, indicate in the box: C=copy wlo attach ntenclosure, E=copy with attachment/enclosure, or N=no copy OFFICE PECB/DRIP l E SPLB/DSSA / E C:SPLB/DSSA D:DSSA NAME JWShapaker KSWest JNHannon GMHolahan DATE 19/ /99 9/ 99/ /99 9/ /99 OFFICE OCIO E C:PECB/DRIP D:DRIP NAME Tech Edt e /i / LBMarsh DBMatthews lDATE 9/I1999 V9/ /99 9/ /99 9/ /99 OFFICIAL RECORD COPY (9

GL 99-03 Month xx, 1999 Page 4 of 4 (4) How can the burden of the collection of information be minimized, includin consideration for the use of automated collection techniques?

Send comments on any aspect of this collection of information, including ggestions for reducing this burden, to the Information and Records Management Br ch, T-6F33, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, a to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202 (315 191), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is required to respond to, a collection of information unless it displays a currently valid 0MB ontrot number.

If there are any questions about this matter, plse contact one of the persons listed below, or the appropriate Office of Nuclear Reactor Re lation project manager for a specific nuclear power plant.

David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical

Contact:

Phillip M. Qual , NRR 301-415-184 E-mail: P @NRC.GOV Lead Project Manager: An ew J. Kugler, NRR 3 1-415-2828

-mail: AJK1 @NRC.GOV DISTRIBUTION: C tral File REXB R/F JWShapaker KSWest JNHannon AJKugler PMQualls DOCUMENT AME: C:\wp\wpdocs\tacs\MA5476\jws2west.dgl.wpd

  • SEE P VIOUS CONCURRENCE Regardinq this documen indicate Inthe box: C=copy w/o attachment/enclosure, E=copy with attachment/enclosure, or N=no copy OFFICE PECg4DRIPI E SPLB/DSSA E C:SPLB/DSSA D:DSSA NAME ake KSWest JNHannon GMHolahan DATE 9/1 199 91/ a /99 9/ /99 9/ /99 OFFICE OCIO OGC lE C:PECB/DRIP D:DRIPl NAME Tech Ed ' LBMarsh DBMatthews DATE 9/ /99 9/ /M /99 9/ /99 9/ /99 OFFICIAL RECORD COPY

. I c

RIS 99,X3 Vl3-ant13 1999 Page 4 of 4 Send comments on any aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, T-6F33, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202 (3150-0011), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

If there are any questions about this matter, please contact one of the persons listed below, or the appropriate Office of Nuclear Reactor Regulation project manager for a specific nuclear power plant.

David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical

Contact:

Phillip M. Qualls, NRR 301-415-1849 E-mail: pmq@nrc.gov Lead Project Manager: Andrew J. Kugler, NRR 301-415-2828 E-mail: ajkl @nrc.gov DISTRIBUTION: Central File REXB R/F JWShapaker KSWest JNHannon AJKugler PMQualls DOCUMENT NAME: C:\wp\wpdocs\tacs\MA5476\jws2west.dgl.wpd

  • SEE PREVIOUS CONCURRENCE Reqardinq this document, indicate in the box: C=copy w/o aftachment/enclosure, E=copy with attachment/enclosure, or N=no copy OFFICE REXB/DRIP lE SPLB/DSSA E C:SPLB/DSSA E D:DSSA N NAME JWShapaker
  • KSWest
  • JNHannon
  • GMHolahan
  • DATE 9/21/99 9/17/99 9/27/99 9/28/99 OFFICE OCIO* l OGC* E C:REXB/DRI l D:DRIP NAME PKleene (TchEd) SRHom LBMarsh DBMatthews DATE 9/19/99 9/21/99 /99 9/ /99 OFFICIAL RECORD COPY

RIS 99-02 October 13, 1999 Page 4 of 4 Send comments on any aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, T-6F33, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0011), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

If there are any questions about this matter, please contact one of the persons listed below, or the appropriate Office of Nuclear Reactor Regulation project manager for a specific nuclear power plant. Original signed by S.F. Newberry for David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical

Contact:

Phillip M. Qualls, NRR 301-415-1849 E-mail: pmq~nrc.gov Lead Project Manager: Andrew J. Kugler, NRR 301-415-2828 E-mail: ajkl@nrc.gov DISTRIBUTION: Central File REXB R/F JWShapaker KSWest JNHannon AJKugler PMQualls DOCUMENT NAME: G:\REXByws\jws2west.dgl .wpd

  • SEE PREVIOUS CONCURRENCE Regarding this document, indicate inthe box: C=copy wlo attachmentlenclosure, E=copy with attachment/enclosure, or N=no copy OFFICE REXB/DRIP E SPLB/DSSA E C:SPLB/DSSA E D:DSSA lN NAME JWShapaker
  • KSWest
  • JNHannon
  • GMHolahan
  • DATE 1 9/21/99 9117/99 9/27/99 9/28/99 OFFICE OCIO OGC* E C:REXB/DRIP l D:DRIP, l NAME PKIeene (TchEd) SRHom LBMarsh* DBM atthe e DATE 9/19/99 9/21/99 10/05/99 10/ /99 OFFICIAL RECORD COPY