ML16131A795 | 13 May 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 |
NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 | 13 May 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 |
IR 05000133/2007004 | 16 September 2008 | IR 05000133-07-004, IR 0720270-07-002, Pacific Gas and Electric Company Dated 09/16/2008 |
ML042050310 | 22 July 2004 | Request for Additional Information on License Application and Safety Analyses Report |
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
ML031110449 | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses | 3 June 1999 | Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses |
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems | 22 March 1999 | Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions | 22 September 1997 | Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions |
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers | 1 August 1997 | Fire Endurance Test Results of Versawrap Fire Barriers |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections |
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room | 8 January 1997 | Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials | 14 November 1995 | Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials |
Information Notice 1995-49, Seismic Adequacy of Thermo-Lag Panels | 27 October 1995 | Seismic Adequacy of Thermo-Lag Panels |
Information Notice 1995-36, Potential Problems with Post-Fire Emergency Lighting | 29 August 1995 | Potential Problems with Post-Fire Emergency Lighting |
Information Notice 1993-83, Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power | 24 August 1995 | Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power |
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites | 5 June 1995 | Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites |
Information Notice 1995-27, NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide. | 31 May 1995 | NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide. |
Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking | 10 March 1995 | Reactor Vessel Top Guide and Core Plate Cracking |
NRC Generic Letter 1995-01 | 26 January 1995 | NRC Generic Letter 1995-001: NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities |
Information Notice 1994-86, Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag | 22 December 1994 | Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag |
ML031200443 | 2 September 1994 | Withdrawn - NRC Generic Letter 1994-004: Voluntary Reporting of Additional Occupational Radiation Exposure Data |
Information Notice 1991-79, Deficiencies Found in Thermo-Lag Fire Barrier Installation | 4 August 1994 | Deficiencies Found in Thermo-Lag Fire Barrier Installation |
NRC Generic Letter 1994-03 | 25 July 1994 | NRC Generic Letter 1994-003: Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors |
NRC Generic Letter 1994-02 | 11 July 1994 | NRC Generic Letter 1994-002: Long-Item Solutions and Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors |
NRC Generic Letter 1994-01 | 31 May 1994 | NRC Generic Letter 1994-001: Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators |
Information Notice 1994-24, Inadequate Maintenance of Uninterruptible Power Supplies & Inverters | 24 March 1994 | Inadequate Maintenance of Uninterruptible Power Supplies & Inverters |
Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems | 28 May 1993 | One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems |
Information Notice 1993-40, Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material | 26 May 1993 | Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material |
NRC Generic Letter 1992-08 | 17 December 1992 | NRC Generic Letter 1992-008: Thermo-Lag 330-1 Fire Barriers |
Information Notice 1992-82, Results of Thermo-Lag 330-1 Combustibility Testing | 15 December 1992 | Results of Thermo-Lag 330-1 Combustibility Testing |
NRC Generic Letter 1992-05 | 4 September 1992 | NRC Generic Letter 1992-005: NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program |
Information Notice 1992-28, Inadequate Fire Suppression System Testing | 8 April 1992 | Inadequate Fire Suppression System Testing |
Information Notice 1992-18, Potential for Loss of Remote Shutdown Capability During a Control Room Fire | 28 February 1992 | Potential for Loss of Remote Shutdown Capability During a Control Room Fire |
Information Notice 1991-79, Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials | 6 December 1991 | Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials |
Information Notice 1991-77, Shift Staffing at Nuclear Power Plants | 26 November 1991 | Shift Staffing at Nuclear Power Plants |
Information Notice 1991-74, Changes in Pressurizer Safety Valve Setpoints Before Installation | 25 November 1991 | Changes in Pressurizer Safety Valve Setpoints Before Installation |
Information Notice 1991-73, Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve | 21 November 1991 | Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve |
ML031140549 | 7 November 1991 | Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability |
Information Notice 1991-53, Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components | 4 September 1991 | Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components |
Information Notice 1991-47, Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test | 6 August 1991 | Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test |
NRC Generic Letter 1991-06 | 29 April 1991 | NRC Generic Letter 1991-006: Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies, Pursuant to 10 CFR 50.54(f) |
NRC Generic Letter 1991-04 | 2 April 1991 | NRC Generic Letter 1991-004: Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle |
Information Notice 1990-69, Adequacy of Emergency and Essential Lighting | 31 October 1990 | Adequacy of Emergency and Essential Lighting |
NRC Generic Letter 1989-21 | 19 October 1989 | NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements |
NRC Generic Letter 1989-19 | 20 September 1989 | NRC Generic Letter 1989-019: Request for Action Related to Resolution of Unresolved Safety Issue A-47 Safety Implication of Control Systems in LWR Nuclear Power Plants Pursuant to 10 CFR 50.54(f) |
NRC Generic Letter 1989-11 | 30 June 1989 | NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy |