Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217N32721 October 1999Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised
BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with30 September 1999Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with
ML20212D04331 August 1999Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2
ML20210P94410 August 1999Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump RisersSafe Shutdown Earthquake
ML20210P91810 August 1999Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in PartCoatings
Nondestructive Examination
VT-2
Moisture barrier
ML20210N2345 August 1999SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46Safe Shutdown
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
ML20210R11931 July 1999Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2
ML20210R13130 June 1999Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2
BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with30 June 1999Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with
BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With31 May 1999Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20210M85814 May 1999B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0Packing leak
Hydrostatic
Coatings
Anchor Darling
VT-2
ML20211L37110 May 1999Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger EvaluationLiquid penetrant
ML20206G1874 May 1999Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17Incorporated by reference
BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With
ML20206N17923 April 1999Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr
BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20205F90330 March 1999Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively
ML20206N18328 February 1999Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14Shutdown Margin
Anticipated operational occurrence
BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With28 February 1999Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20203D7069 February 1999SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 DeniedReactor Vessel Water Level
Stroke time
Incorporated by reference
Excess Flow Check Valve
Breakaway torque
Cold shutdown justification
BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With31 December 1998Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with31 October 1998Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with
BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired30 October 1998Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections RepairedPost Accident Monitoring
ML20154P81516 October 1998SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1
ML20154P85916 October 1998SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2Incorporated by reference
BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With30 September 1998Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20151Y62114 September 1998BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2Safe Shutdown
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Stroke time
Coatings
Temporary Modification
Incorporated by reference
Code Reconciliation
Earthquake
Fire Protection Program
Power Uprate
ML20151Y63714 September 1998Changes to QA Program, for Bsep,Units 1 & 2
BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With31 August 1998Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20151T5025 August 1998Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2
BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 231 July 1998Monthly Operating Repts for July 1998 for BSEP Units 1 & 2
ML20236T1961 July 1998Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr
ML20236T1921 July 1998Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr
BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 230 June 1998Monthly Operating Repts for June 1998 for BSEP Units 1 & 2
ML20236T19730 June 1998Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13Shutdown Margin
Anticipated operational occurrence
ML20249B96911 June 1998Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final ReptReactor Vessel Water Level
Coatings
BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 231 May 1998Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2
ML20151S90431 May 1998Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1
BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 230 April 1998Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2
ML20151S89930 April 1998Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1
ML20247N75030 April 1998Rev 0 to BSEP Unit 1,Cycle 12 Colr
ML20247N77230 April 1998Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12Shutdown Margin
Anticipated operational occurrence
ML20217K84624 April 1998Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147Incorporated by reference
ML20217K39424 April 1998SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2Incorporated by reference
ML20217E68423 April 1998Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD HousingsIncorporated by reference
ML20217E74721 April 1998Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential WeldsIncorporated by reference
ML20217B52420 April 1998SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii)VT-2
Incorporated by reference
BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 231 March 1998Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2
ML20216B1044 March 1998SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1Incorporated by reference