Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24029A17430 January 2024Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion
ML23317A07114 November 2023NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides)
ML23255A10411 August 2023Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout
ML23157A0356 June 2023Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides
ML23033A6669 February 2023Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna
ML23033A66730 January 2023Public Call with Constellation January 30, 2023 (Slides)
ML21314A44710 November 2021Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection IntervalMoisture barrier
ML21165A19416 June 2021Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar PresentationCoronavirus
ML21165A28816 June 2021Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated)Coronavirus
ML20261G73216 September 2020Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55aIncorporated by reference
Exemption Request
ML20178A42030 June 2020NEI Slides for June 30, 2020, Public Meeting on COVID-19 ResponseExemption Request
Pandemic
Coronavirus
ML20170B02123 June 2020NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) InspectionsBoric Acid
Weld Overlay
Nondestructive Examination
Pandemic
Coronavirus
COVID-19
Pressure Boundary Leakage
ML20175A87223 June 2020Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach
ML20163A65516 June 20206-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator InspectionsPandemic
Coronavirus
ML20169A55916 June 2020Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1)Pandemic
Coronavirus
ML19318F95120 November 2019Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit FrequencyGrace period
ML19317C99512 November 2019In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019Anchor Darling
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19151A66031 May 2019BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19022A20023 January 2019Request for Use of ASME Code Case N-879 for Exelon Nuclear Power PlantsLoop seal
ML18347B31419 December 2018Bwrvip/Asme Relief Request Discussion December 19, 2018
ML18334A21630 November 2018Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018GOTHIC
ML18319A12719 November 2018Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation AreasHigh Radiation Area
Deep Dose Equivalent
ML18054B35927 February 2018Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli
ML17142A23825 May 2017OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner BurnsProbabilistic Risk Assessment
Operator Manual Action
FLEX
Significance Determination Process
ML16077A15622 March 2016Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards
ML16075A32916 March 2016OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for OperationsAnticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Open Phase Condition
Risk-Informed Steering Committee
Fuel cladding
Generic Issues Program
Backfit
ML13053A29620 February 2013NRC Pre-Meeting Presentation 2-20-13Ultimate heat sink
Probabilistic Risk Assessment
NFPA 805
Hemyc
Maintenance Rule Program
Fire Protection Program
ML11136054616 May 2011NRC Meeting Slides, Ginna 2011 Annual Assessment MeetingEarthquake
ML10225004213 August 2010Exit and RPM Slides - 2010
ML10225008113 August 2010Public Meeting 2010 - Ceng Slides
ML10068073518 March 2010Annual Meeting Slides
ML09265067715 September 2009Slides from the Public Meeting with Constellation Energy - Ginna ISFSI Presentation
ML08088040628 March 2008Licensee Slides (Constellation) from Ginna Annual Assessment Meeting
ML08095049125 March 2008Attendance List for Ginna Annual Assessment Meeting
ML08070119110 March 2008Slides for Annual Assessment Public Meeting for Ginna Station
ML07124031225 April 2007Slides from Ginna Annual Assessment Meeting, 04/25/2007
ML07101022611 April 2007Annual Performance Assessment Meeting Slides
ML0609404404 April 2006NRC Slides for Annual Assessment Public Meeting with R. E. Ginna Nuclear Power Plant, LLC to Discuss CY2005 Performance
ML05318028728 September 2005Meeting to Obtain Public Comments on Proposed Release of Part of R.E. Ginna Nuclear Power Plant Site for Unrestricted Use Under 10 CFR 50.83
ML05292082215 September 2005Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results SummaryBoric Acid
Loop seal
ML05256044717 August 2005B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program
ML05145018324 May 2005Meeting Presentation, Ginna Extended Power Uprate Power Ascension Testing Program
ML05137017712 May 2005Attachment 3 - Licensee Presentation (Ginna, Perry, Peach Bottom, LaSalle, and Quad Cities) - Public Meeting Summary on FAQ Appeal Meeting May 12, 2005
ML0509800756 April 2005Handouts - Ginna Power Uprate, NRC Meeting, April 6, 2005
ML02324031322 November 2002Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan.Fire Barrier
Hemyc