Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23157A035 | 6 June 2023 | Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides | |
ML23033A666 | 9 February 2023 | Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna | |
ML23033A667 | 30 January 2023 | Public Call with Constellation January 30, 2023 (Slides) | |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML21165A194 | 16 June 2021 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation | Coronavirus |
ML21165A288 | 16 June 2021 | Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) | Coronavirus |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20175A872 | 23 June 2020 | Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach | |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML19318F951 | 20 November 2019 | Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency | Grace period |
ML19317C995 | 12 November 2019 | In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 | Anchor Darling |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19151A660 | 31 May 2019 | BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19022A200 | 23 January 2019 | Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants | Loop seal |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML17142A238 | 25 May 2017 | OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns | Probabilistic Risk Assessment Operator Manual Action FLEX Significance Determination Process |
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
ML13053A296 | 20 February 2013 | NRC Pre-Meeting Presentation 2-20-13 | Ultimate heat sink Probabilistic Risk Assessment NFPA 805 Hemyc Maintenance Rule Program Fire Protection Program |
ML111360546 | 16 May 2011 | NRC Meeting Slides, Ginna 2011 Annual Assessment Meeting | Earthquake |
ML102250042 | 13 August 2010 | Exit and RPM Slides - 2010 | |
ML102250081 | 13 August 2010 | Public Meeting 2010 - Ceng Slides | |
ML100680735 | 18 March 2010 | Annual Meeting Slides | |
ML092650677 | 15 September 2009 | Slides from the Public Meeting with Constellation Energy - Ginna ISFSI Presentation | |
ML080880406 | 28 March 2008 | Licensee Slides (Constellation) from Ginna Annual Assessment Meeting | |
ML080950491 | 25 March 2008 | Attendance List for Ginna Annual Assessment Meeting | |
ML080701191 | 10 March 2008 | Slides for Annual Assessment Public Meeting for Ginna Station | |
ML071240312 | 25 April 2007 | Slides from Ginna Annual Assessment Meeting, 04/25/2007 | |
ML071010226 | 11 April 2007 | Annual Performance Assessment Meeting Slides | |
ML060940440 | 4 April 2006 | NRC Slides for Annual Assessment Public Meeting with R. E. Ginna Nuclear Power Plant, LLC to Discuss CY2005 Performance | |
ML053180287 | 28 September 2005 | Meeting to Obtain Public Comments on Proposed Release of Part of R.E. Ginna Nuclear Power Plant Site for Unrestricted Use Under 10 CFR 50.83 | |
ML052920822 | 15 September 2005 | Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary | Boric Acid Loop seal |
ML052560447 | 17 August 2005 | B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program | |
ML051450183 | 24 May 2005 | Meeting Presentation, Ginna Extended Power Uprate Power Ascension Testing Program | |
ML051370177 | 12 May 2005 | Attachment 3 - Licensee Presentation (Ginna, Perry, Peach Bottom, LaSalle, and Quad Cities) - Public Meeting Summary on FAQ Appeal Meeting May 12, 2005 | |
ML050980075 | 6 April 2005 | Handouts - Ginna Power Uprate, NRC Meeting, April 6, 2005 | |
ML023240313 | 22 November 2002 | Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. | Fire Barrier Hemyc |