MONTHYEARRS-07-126, Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-30E)2007-09-0707 September 2007 Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-30E) Project stage: Request RS-07-146, Response to Request for Additional Information Related to Relief Request RV-30E2007-10-30030 October 2007 Response to Request for Additional Information Related to Relief Request RV-30E Project stage: Response to RAI ML0727100112007-11-0707 November 2007 Request for Additional Information Related to Relief Request (RV-30E) Project stage: RAI ML0731300522007-11-20020 November 2007 Relief from 5-Year Test Interval for Main Steam Safety Valves Project stage: Other RS-08-013, Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-02C, Revision 0)2008-02-0808 February 2008 Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-02C, Revision 0) Project stage: Request RS-08-033, Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-30F, Revision 0) and Partial Withdrawal of Relief Request RV-30E, Revision 02008-03-0606 March 2008 Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-30F, Revision 0) and Partial Withdrawal of Relief Request RV-30E, Revision 0 Project stage: Withdrawal RS-08-057, Supplemental Information Concerning Requests for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves2008-04-18018 April 2008 Supplemental Information Concerning Requests for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves Project stage: Request ML0813305572008-06-27027 June 2008 Dresden/Quad Cities Relief Requests from 5-Year Test Interval for Main Steam Safety Valves Project stage: Other 2007-09-07
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-041, Response to Request for Additional Information for Alternative Request RV-23H2023-03-14014 March 2023 Response to Request for Additional Information for Alternative Request RV-23H RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-004, Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request2023-01-23023 January 2023 Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-11-0303 November 2022 Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-116, Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval2022-11-0101 November 2022 Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval RS-22-115, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-10-19019 October 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2022-08-25025 August 2022 License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel2022-08-18018 August 2022 License Amendment Request Regarding Transition to GNF3 Fuel RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-102022-07-19019 July 2022 Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 RS-22-082, Defueled Safety Analysis Report Update, Revision 112022-06-22022 June 2022 Defueled Safety Analysis Report Update, Revision 11 RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals2022-06-0909 June 2022 Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.12022-06-0808 June 2022 License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-046, Relief Requests Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Relief Requests Associated with the Sixth Inservice Inspection Interval RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-042, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-23023 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-21-009, Proposed Relief Request Associated with Code Case N-9212022-01-18018 January 2022 Proposed Relief Request Associated with Code Case N-921 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-114, Request for Exemption from 10 CFR 2.109(b)2021-10-28028 October 2021 Request for Exemption from 10 CFR 2.109(b) RS-21-110, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-19019 October 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-103, Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station2021-09-28028 September 2021 Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station RS-21-097, Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning2021-09-15015 September 2021 Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-086, Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E2021-08-23023 August 2021 Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel 2023-08-30
[Table view] |
Text
Exel6n Nuclear
,rdww_exeiancarp .cQm 10 CFR 50.55a RS-08-013 February 8, 2008 U . S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket No. 50-237 and 50-249
Subject:
Request for Relief from ASME OM Code 5-year Test Interval for Main Steam Safety Valves (Relief Request RV-02C, Revision 0)
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (a)(3)(ii), Exelon Generation Company, LLC (EGC) requests NRC approval of proposed Relief Request RV-02C to extend the 5-year Inservice Test (I ST) interval to a 6.5-year IST interval for the Dresser Model 3777Q Main Steam Safety Valves (MSSVs) at Dresden Nuclear Power Station (DNPS), Units 2 and 3.
Specifically, EGC requests relief from the American Society of Mechanical Engineers/American National Standards Institute (ASME), Operation and Maintenance of Nuclear Power Plants, OM-1998, (OM Code), Appendix I, "Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants," Section I-1330, "Test Frequencies, Class 1 Pressure Relief Valves ." This relief is requested for the remainder of the fourth 10-year Inservice Testing (IST) interval, which began November 1, 2003 and is scheduled to end on October 31, 2012.
EGC requests approval of this request by October 31, 2008, to enable plant start-up following the twentieth DNPS Unit 3 refueling outage. There are no regulatory commitments contained within this letter.
If you have any questions concerning this letter, please contact Mr. John L. Schrage at (630) 657-2821 .
Attachment:
Relief Request RV-02C, Revision 0
Attachment Relief Request RV-02C, Revision 0 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)
Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety 1 . ASME Code Componentls) Affected Dresden Nuclear Power Station (DNPS) Units 2 and 3, Main Steam Safety Valves (MSSVs) :
Model : 37770; Manufacturer : Dresser
- 2. Applicable Code_ Edition and Addenda American Society of Mechanical Engineers (ASME)/American National Standards Institute, "Code for Operation and Maintenance of Nuclear Power Plants" (ASME OM Code), 1998 Edition through 2000 Addenda.
3. Applicable Code Requirement
ASME OM Code, Appendix I, "Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants," Section I-1330, "Test Frequencies, Class 1 Pressure Relief Valves," paragraph (a), "5-Year Test Interval ."
4. Reason for Request
10 CFR 50 .55a(f)(4) directs a licensee to meet inservice testing requirements for ASME Code Class 1 valves set forth in the ASME OM Code and addenda. DNPS is committed to the 1998 Edition through 2000 Addenda of the ASME OM Code .
Section ISTC-3200, "Inservice Testing," states that inservice testing shall commence when the valves are required to be operable to fulfill their required function(s) . Section ISTC-5240, "Safety and Relief Valves," directs that safety and relief valves meet the inservice testing requirements set forth in Appendix I 'of the ASME OM Code. Appendix I, Section I-1330(a) of the ASME OM Code states that Class 1 pressure relief valves shall be tested at least once every five years, starting with initial electric power generation . This section also states a minimum of 20 percent of the pressure relief valves are tested within any 24 month interval and that the test interval for any individual valve shall not exceed five years . The required test ensures that the MSSVs, which are located on each of the main steam lines between the reactor vessel and the first isolation valve within the drywell, will open at the pressures assumed in the safety analysis .
The Dresser Model 37770 MSSVs have shown exemplary test history at both DNPS and Quad Cities Nuclear Power Station (QCNPS), as described in Section 5 below. However, given the current 24-month operating cycle for each DNPS unit, Exelon Generation Company, LLC is required to remove and test fifty percent (four of eight) MSSVs every refueling outage, so that all valves are removed and tested every two refueling outages.
This ensures compliance with the ASME OM Code requirements for testing Class 1 pressure relief valves within a five year interval . Approval of extending the test interval to 6.5 years would reduce the minimum number of MSSVs tested at DNPS over three refueling outages by four MSSVs per unit.
Without Code relief, the incremental outage work due to the inclusion of the four additional MSSVs would be contrary to the principles of as low as reasonably achievable (ALARA), in Page 1 of 4
Attachment Relief Request RV-02C, Revision 0 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)
Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety that the removal and replacement of the four MSSVs over three refueling outages per unit will result in approximately eight additional person-rem of cumulative radiation exposure .
This additional cumulative radiation exposure represents a hardship for DNPS without a compensating increase in the level of quality or safety .
In accordance with 10 CFR 50 .55a, "Codes and standards," paragraph (a)(3)(ii), EGC requests relief from the five year test interval requirements of ASME OM Code, Appendix I, Section I-1330(a) for the Dresser Model 37770 MSSVs at DNPS Units 2 and 3. EGC requests that the test interval be increased from five years to 6.5 years. All other requirements of the ASME OM Code would be met. Compliance with the applicable requirements of the ASME OM Code for these MSSVs results in hardship due to unnecessary personnel radiation exposure without a compensating increase in the level of quality or safety .
- 5. Proposed Alternative and Basis for Use DNPS proposes that ASME Class 1 pressure relief valves (i .e., Dresser Model 37770 MSSVs) shall be tested at least once every 6.5 years. A minimum of 20% of the pressure relief valves will be tested within any 24-month interval and that this 20% shall consist of valves that have not been tested during the current 6.5 year interval, if they exist. The test interval for any individual valve shall not exceed 6.5 years.
Basis for Use All MSSVs (as well as the Electromatic relief valves (ERVs) and the Target Rock safety relief valve (SRV)) are on the second elevation of the Drywell . The major contributor to radiation exposure on the first and second elevations of the Drywell is the Reactor Recirculation System, for which permanent shielding has been installed . However, other systems on the second elevation of the Drywell also contribute to radiation exposure . These systems include Reactor Water Cleanup, Shutdown Cooling, and the Isolation Condenser.
Removal of an installed MSSV and installation of a replacement MSSV require removal of insulation and appurtenances on the MSSV and unbolting the MSSV . Once unbolted, the MSSV is maneuvered from its location and lowered to the first elevation. Due to the highly congested configuration of the General Electric Mark I containment at DNPS, this evolution requires construction and demobilization of additional rigging. Based upon the size of the valves, a crew of five to seven personnel is necessary to safely move each valve.
Historical cumulative radiation exposure at DNPS for removal and replacement of safety and relief valves from seven recent DNPS refueling outages (i.e ., four MSSVs, two ERVs, and one SRV each refueling outage) is described in Table 1 .
Attachment Relief Request RV-02C, Revision 0 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)
Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety TABLE 1 : Cumulative Radiation Exposure Outage D3R17 D3R18 D3R19 D2R17 D2R18 D2R19 D2R20' Number of Valves Replaced 7 7 7 7 7 7 7 umulative Radiation Exposure 5.0 I 10 .4 I 23.2 10 .6 16 .0 I 12 .6 I 6 .7 This data indicates that the cumulative radiation exposure to replace an MSSV could range from approximately one rem to three rem . The outage-specific variability of cumulative radiation exposure is attributed to the location of a particular valve relative to radiation hot spots, the physical configuration of surrounding equipment for a particular valve, and the impact of outage-specific plant configurations . In that the combinations of these factors for a particular refueling outage are highly variable, EGC has concluded that the expected cumulative radiation exposure to remove and replace a single MSSV would be approximately two person-rem . Therefore, absent the requested relief, replacement of four incremental MSSVs would result in approximately eight additional person-rem over three refueling outages per unit, without a compensating increase in the level of quality or safety .
IST history for the Dresser Model 37770 MSSVs at DNPS from May 1997 to the present indicates that all tested MSSVs (i.e., 48 MSSV tests) that have been installed in either DNPS Unit 2 or Unit 3 for two operating cycles have successfully passed the ASME OM Code and Technical Specification (TS) as-found lift setpoint acceptance criteria within plus or minus 3%. Historical test data indicates that 32 of the 48 tests remained within an as-left tolerance of plus or minus 1 %, and of the16 tests that were greater than plus or minus 1 %,
only five tests were greater than plus 1 % (i .e., the majority of MSSV test results that exceeded plus or minus 1 % were in the negative, or conservative, direction).
This historical DNPS test data is consistent with the reliable and consistent performance of the Dresser Model 37770 MSSVs at Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. Since 1997, EGC has collected and documented 108 as-found Model 37770 test results from both DNPS and QCNPSI . This test data indicates that all MSSV test results (i .e., Dresser Model 37770 valves) are within the ASME acceptance criteria of plus or minus 3%.
In addition to the historical test results, the current DNPS reload ASME overpressure analyses for both units assume that only eight of nine MSSVs are operable, and all of the operable MSSVs open to relieve pressure at the upper ASME limit of plus 3% of the MSSV setpoint . These conservative assumptions provide additional assurance that the requested relief from the ASME OM Code requirement would not result in a decrease in the level of quality or safety .
1 Dresser Model 37770 MSSVs from QCNPS are tested and refurbished at the same facility that tests and refurbishes the DNPS MSSVs, utilizing the same work processes.
Page 3of4
Attachment Relief Request RV-02C, Revision 0 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)
Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety DNPS utilizes an ASME OM Code-certified off-site vendor to perform as-found and as-left testing, inspection, and refurbishment of the MSSVs . An EGC-approved and qualified procedure is used for disassembly and inspection of the MSSVs. This procedure requires that each MSSV be disassembled and inspected upon removal from service, independent of the as-found test results. The procedure identifies the critical components that are required to be inspected for wear and defects, and the critical dimensions that are required to be measured during the inspection . If components are found worn or outside of the specified tolerance(s), the components are either reworked to within the specified tolerances, or replaced. All parts that are defective, outside-of-tolerance, and all reworked/replaced components are identified, and EGC is notified of these components by the off-site vendor.
The MSSV is then re-assembled, the as-left test is performed, and the MSSV is returned to DNPS .
Based upon the estimated cumulative radiation exposure to comply with the ASME OM Code, coupled with historical MSSV test results for Dresser Model 3777Q MSSVs at DNPS and QCNPS, EGC has concluded that compliance with the ASME OM Code would result in a hardship, without a compensating increase in the level of quality or safety .
- 6. Duration of Proposed Alternative This relief is requested for the remainder of the fourth 10-year IST interval, which began November 1, 2003 and is scheduled to end on October 31, 2012.
- 7. Precedents In Reference 1, the NRC reviewed and approved a relief request for Susquehanna Steam Electric Station, Units 1 and 2 to extend the MSSV test interval duration for individual valves to six years for the entire third 10-year Inservice Testing interval . In Reference 2, the NRC reviewed and approved a relief request for Nine Mile Point, Unit 2 to extend the MSSV test interval duration for individual valves to three refueling outages or approximately six years for the entire third 10-year Inservice Testing interval . In both approvals, the NRC allowed for a total installed interval of at least six years.
- 8. References
- 1) Letter from R. J . Laufer (USNRC) to B. L. Shriver (SSES), "Susquehanna Steam Electric Station Units 1 and 2 - Third 10-Year Interval Inservice Testing (IST) Program Plans,"
dated March 10, 2005.
- 2) Letter from M. Banerjee (USNRC) to J .H. Mueller (NMPC), " Nine Mile Point Nuclear Power Station, Unit No. 2 - Alternative to American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Regarding Inservice Testing of Main Steam Safety/Relief Valves (TAC No. MB0290)," dated April 17, 2001 .