U-602477, Monthly Operating Rept for Jul 1995 for Clinton Power Station,Unit 1

From kanterella
(Redirected from ML20087C736)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1995 for Clinton Power Station,Unit 1
ML20087C736
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/31/1995
From: Hollon M, Phares R
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602477, NUDOCS 9508090366
Download: ML20087C736 (5)


Text

ii o

'i -"

lilinois Power Company Clinton Power Station P.O. Box 678

. Clinton,IL61727 -

Tel 217 935-8881 ILLIN915 ,oap U-602477 r/* 9 L30-95(08-03)-LP-8E.100c August 3, 1995 10CFR50.36 Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 Facility Operating License NPF-62 July 1995 Monthly Operatine Report

Dear Sir:

Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending July 31, 1995.

Sincerely yours, Richard F. Phares Director - Licensing MCH/krm Attachment cc: NRC Region III Regional Administrator NRC Resident Office, V-690 Illinois Department of Nuclear Safety

.. r- nn

.:-.b u d vD gn t

9508090366 950731 PDR ADOCK 05000461 R PDR - /") } '/,

,, l

b-p-

. Attcchment 1

  • to U-602477 Page 1 of 4 CilALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month July 1995 None l

l

{

-i

.4

. Attzchment 1 ,

'/

to U-602477 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL

'f DOCKET NO. 50-461 UNIT Clinton 1 DATE 07/31/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 MONTH July 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net) (MWe-Net) 1 915 17 906 2 914 18 910 3 91! 19 911 1'

4 915 20 909 5 914 21 909 6 914 22 911 7 915 23 909 8 916 24 908 9 913 25' 908 )

10 914 26 908 11 912 27 908 12 909 28 907 13 906 29 905 14 905 30 902 15 906 31 900 16 765 f

. Attaclunent 1

. .e to U-602477 ~

.- Page 3 of 4 '

OPERATING DATA REPORT i

l DOCKET NO. 50-461 UNIT Clinton 1  ;

DATE 07/31/95 COMPLETED BY M; C. Hollon TELEPHONE (217) 935-8081 X3537 j OPERATING STATUS

1. REPORTING PERIOD: July 1995 CROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 23.94 9  :

1 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 2.lQ DESIGN ELECTRICAL RATING (MWe-Net): 231 I

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): E9.ne I I

L 4 REASONS FOR RESTRICTION (IF ANY): N/A  ;

THIS MONTH YR TO DATE CUMULATIVE l

5. NUMBER OF HOURS REACTOR WAS CRITICAL... 744.0 3.806.9 49.558.8
6. REACTOR RESERVE SHUTDOWN HOURS......... 0.0 0.0 0.0  !
7. HOURS GENERATOR ON LINE. . . . . . . . . . . . . . . . 744.0 3.707.6 48.132.0 .j
8. UNIT RESERVE SHUTDOWN HOURS..........., 0.0 0.0 4.0  ;

i

9. GROSS THERMAL ENERGY GENERATED (MWH)... 2.151.464 9.733.052 128.199.250  ;

1

~

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 704.571 3.191.868 42.348.819
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 673.318 3.037.480 40.313.658
12. REACTOR SERVICE FACTOR................. 100.0% 74.8% 73.6%
13. REACTOR AVAIIABILITY FACTOR. . . . . . . . . . . . 100.0% 74.8% 73.6%
14. UNIT SERVICE FACTOR.................... 100.0% 72.9% 71.5%
15. UNIT AVAILABILITY FACTOR............... 100.0% 72.9% 71.5%
16. UNIT CAPACITY FACTOR (Using MDC)....... 97.3% 64.2% 64.4%
17. UNIT CAPACITY FACTOR (Using Design MWe) 97.0% 64.0% 64.2%
18. UNIT FORCED OUTAGE RATE................ 0.0% 4.1% 8.9%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

None

.20. _ IF SIRTT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA

em

-.;  :;C 4!

f, Attechnent 1. "

to U-602477L~.

/Page 4 ofi4- Y,'; ,

UNIT SHUTDOWNS ~AND POWER REDUCTIONS ,

DOCKET NO. 50-461 .*

UNIT- Clinton 1

  • DATE' 07/31/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MONTH. July 1995 METHOD OF TYPE SHUTTING DOWN- -l F: FORCED DURATION THE REACTOR OR CORRECTIVE- 'i NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2), ACTIONS / COMMENTS .; j NONE (1) Reason .

A-Equipment Failure (explain),.B-Maintenance or Test,'C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

.(2) Method.

.1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain);