NOC-AE-18003562, Operator Licensing Examination Schedule - NRC Form 536

From kanterella
(Redirected from ML18113A048)
Jump to navigation Jump to search
Operator Licensing Examination Schedule - NRC Form 536
ML18113A048
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/10/2018
From: Curry H
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-18003562, RIS-18-002
Download: ML18113A048 (3)


Text

South lexas Project Electric Generating Station P.O. Box 289 /MJdsworth. lexas 77483 -----------VVV\r--

April 10, 2018 NOC-AE-18003562 File No. G30 10 CFR 55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 South Texas Project Units 1and 2 Docket Nos. STN 50-498; STN 50-499 Operator Licensing Examination Schedule r

Reference:

NRC Regulatory Issue Summary (RIS) 2018-02 STP Nuclear Operating Company is submitting the attached response to RIS 2018-02.

There are no commitments in this letter.

If you have any questions, please contact me at (361) 972-7327 or Mr. Adrian Culver at (361) 972-8604.

I' enry T. Cur Manager, Operations Training

Attachment:

NRC Form 536

. :---***:' . ~- '

STI: 34651969

NOC-AE-18003562 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV Morgan, Lewis & Beckius LLP U.S. Nuclear Regulatory Commission Paul Bessette 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Jennifer Bridges Senior Project Manager Kelly Clayton U.S. Nuclear Regulatory Commission One White Flint North (08H04) NRG South Texas LP 11555 Rockville Pike Kevin Malcarney Rockville, MD 20852 Jim von Suski!

Skip Zahn NRC Resident Inspector U. S. Nuclear Regulatory Commission CPS Energy P. 0. Box 289, Mail Code: MN116 Kevin Pollo Wadsworth, TX 77483 Cris Eugster L. D. Blaylock City of Austin William Sweeney John Wester Texas Dept. of State Health Services Robert Free

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

  1. RRFoi,(, *

+~* **lo: Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments i.

~*

~C OPERATOR LICENSING regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the

'" EXAMINATION DATA Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of

.. +/

.,.,...jil< .* Management and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currentiy valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION SOUTH TEXAS PROJECT I I I IV I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY CY CY CY 2020 2021 2022 2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY CY CY CY 2020 2021 2022 2023 NUMBER OF REACTOR 8 8 10 6 OPERATORS NUMBER OF SENIOR REACTOR 13 1.1 6 6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3 2 2 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 7/13/20 7/12/21 7/25/22 7/24/23 ALTERNATE DATE 8/10/20 8/9/21 8/22/22 8/21/23 NRG FORM 536 (11-2017)