ML18066A453

From kanterella
Jump to navigation Jump to search
Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations
ML18066A453
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/07/1999
From: Haskell N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18066A454 List:
References
RTR-NUREG-1432 NUDOCS 9904150061
Download: ML18066A453 (2)


Text

' - A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2276 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Haskell Director, Licensing April 7, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS - ADDITIONAL REVISIONS - ITS SECTION 3.1 On January 26, 1998, Consumers Energy Company submitted a Technical Specifications Change Request (TSCR) to revise the Palisades Technical Specifications to closely emulate the Standard Technical Specifications for Combustion Engineering Plants, NUREG-1432.

On March 1, 1999 Consumers Energy Company responded to a Request for Additional Information concerning Sections 2.0, Safety Limits; 3.1, Reactivity Control Systems; and 3.2 Power Distribution of that TSCR. During a telephone call on April 6, 1999 the NRG staff requested an additional editorial revision to Section 3.1 to more closely emulate the Standard Technical Specifications. This letter provides that revision.

The following are provided in the Enclosure to this letter:

ITS page 3.1.4-2, with the Completion Time for Action D.1 revised to read "Prior to entering MODE 2 following next MODE 3 entry" in place of "Prior to entering MODE 2 from MODE 3" as requested.

ITS Basis page 3.1.4-8 revised to reflect the above change to the Completion Time.

The changes being submitted herein do not alter the conclusions of the No Significant Hazards Considerations contained in our January 26, 1998 submittal.

SUMMARY

OF COMMITMENTS This submittal contains no new commitments and no revisions to existing commitments.

athan L. Haskell irector, Licensing Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRG Resident Inspector - Palisades Enclosure

CONSUMERS ENERGY COMPANY ADDITIONAL REVISIONS - ITS SECTION 3.1 To the best of my knowledge, the content of this response to the NRC telephone request of April 6, 1999, concerning Section 3.1 of our January 26, 1998 License Amendment request for conversion to Improved Technical Specifications, is truthful and complete.

7 Sworn and subscribed to before me this _ _ _ ~~-!

M_ day of _......~.......,.

..........<!."""""K--- 1999.

~~~

Mary Ann Engle, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)

My commission expires February 16, 2000

~

c.~,

__ i-;

~.

. '. ":*