MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
CATEGORY 1 REGUDAT0KY INFORMATION DISTRIBUTIOPSYSTEM (RIDE)
ACCESSION NBR:9907130072 DOC.DATE: 99/07/02 NOTARIZED: NO DOCKET FACIL:ST5;50-$ 28 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION IDE,W.E. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch. (Document Control Desk)
Jl C SUBuECT: .Submits withdrawal of Relief 5 for second ISI interval for Units 1,2 & 3.Proposed alternative is'related to exam A requirements for component supports for second ISI interval.
T DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Licensing Submittal: Environmental Rept Amdt S Related Correspondence E NOTES: STANDARDIZED PLANT 05000528 G Standardized plant. 05000529 Standardized plant. 05000530 0 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 1 1 FIELDS,M 1 .1 INTERNAL: ACRS 1 1 FILE CENTER 0 1 1 NUDOCS-ABSTRACT 1 1 GGCi/RP 1 0
'RES/DET/ERAB 1 1 RES/DET/MEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 D NRC PDR 1 1.
0 gg)$ '@$Qkfg 5A ~
M E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE."TO HAVE'YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10
i+[ igi I
Commltmeat Ineeatke, &erg@.
I 10CFR50.55a(a)(3)
Palo Verde Nuclear Generating Station William E. Ide Vice, President
'Nuclear Engineering -
'EL 602/3934116 FAX 602/3934077 Mail Station 7605 P.O. Box 52034 Phoenix, AZ 65072-2034
. 102-04304-WEI/AKK/RKB U.S. Nuclear Regulatory'Commission July.2, 1999 ATl N: Document Control'Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Reference:
APS Letter No. 102-04095-WEI/AKK/MLG, dated March 17, 1998, from W. E. Ide, APS, to NRC, "Inservice Inspection Program for Second 10-Year Interval."
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units1,2 and 3 Docket Nos. STN 50-528/529/530 Second Inservice Inspection Interval - Proposed Code Alternative and Withdrawal of Relief Request No. 5 In the above referenced letter, Arizona Public Service Company (APS) submitted the Second 10-Year Inservice Inspection (ISI) Program for PVNGS Units 1, 2 and 3.
Included with the second interval ISI program were several requests for relief. Relief Request No. 1 requested use of the 1992 Edition, 1992 Addenda. Relief Request No. 5 requested the use of alternative methods to comply with the component support examination and snubber functional testing requirements of ASME Section XI, 1992 Edition, 1992 Addenda. APS hereby withdraws Relief Request No. 5 for the second ISI interval.
Pursuant to 10 CFR 50.55a(a)(3)(i), APS is requesting the use of an alternative to 10 CFR 50.55a(g), "Inservice inspection requirements," and American Society of Mechanical Engineers (ASME) Code, Section XI, and applicable addenda. The proposed alternative is related to the examination requirements for component supports for the second ISI interval.
Specifically, the proposed alternative requests approval to deviate from the component support categorization requirements of IWF-2500 of ASME Section XI, 1992 Edition, 1992 Addenda. NRC approval is requested in conjunction with approval of the second 10-year interval ISI programs referenced above. Enclosed is a detailed discussion with bases justifying the requested alternative.
'I 4
t ~ t' IP ' 8 f. W, ~ k I /\
t" ~
1~
L I! 4i
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Second ISI Interval Alternative Request Page 2 No commitments are being made to the NRC by this letter.
Should you have any questions, please contact Scott A..Bauer at (623) 393-5978.
Sincerely, WEI/AKK/RKB/rlh Enclosures cc: E. W. Merschoff M. B. Fields J. H. Moorman
ig) ll~
I 1
ENCLOSURE.
SECOND 10-YEAR ISI INTERVAL ASME SECTION XI ALTERNATIVE REQUEST FOR THE PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, 3
~I i C t
Ml
)ss A,
~4 aJ(al <<= l'.-"
% >I r.
f' t .4
~ ' N R All f
Alternative Re uest Component Supports Code Class 1,2,3 Code Reference ASME Section XI, Division 1, 1992 Ed, 1992A Examination Category F-A Item Numbers F1.10, F1.20, F1.30,.F1.40 Component Description All ISI: Program Component Supports PVNGS Units All Requirement Table IWF-2500-1, Category B-A, 'Note'(1), requires that component supports-be categorized to identify support type. by component support function.
Alternate In lieu of categorizing component supports and performing VT Testing examinations on a select percentage of each category as specified in ASME, Section XI, Table IWF-2500-1, PVNGS will perform VT-3 examinations on 100% of the component supports on all non-exempt systems and lines.
Bases for The intent of categorizing supports is to provide a methodology for Relief selection of examination. percentages. The, proposed alternate examination of 100% of supports eliminates the value of categorization.
Examination of 100% of supports exceeds the Code required percentages.
Additional None Information Approval In accordance with 10 CFR 50.55a(a)(3)(i) PVNGS is requesting permission to use the proposed alternative.
The requested alternative provides an acceptable level of quality and safety.
References 1. ASME Section XI, Rules for Inspection and Testing of Components of Light Water Cooled Plants 1992 Edition and Addenda;
- 2. Page 8-7 (revised relief request 0 5) to the.lSI Program Manuals.
41 Ii ~ r t' ~
~ ) ~% ~
c
Distri67.txt Distribution Sheet Priority: Normal
.From: Stefanie Fountain Action Recipients: Copies:
RidsNrrPMMFields 0 OK Rids NrrLACJamerson 0 OK Internal Recipients:
RidsRgn4MailCenter OK RicCSManager OK PILE CENTER 01 Paper Copy External Recipients:
NOAC Paper Copy Total Copies:
Item: ADAMS Package Library: ML ADAMS"HQNTAD01 ID: 003699428
Subject:
Palo Verde 1,2 & 3 supplemental response to Generic Letter 95-07,RAI Body:
ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT'CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003699428.
A056 - Generic Ltr 95 Pressure Locking & Thermal Binding of Safety Related Power Docket: 05000528
'~lj j-'+3 Page 1
.jl ~t }
t' jl
Distri67.txt Docket: 05000529 Docket: 05000530 Page 2
II ~ +
)'
David Mauidin Vice President Mail Station 7605 Palo Verde Nuclear Nuclear Engineering TEL (623) 393-5553 P.O. Box 52034 Generating Station and Support FAX (623) 393-6077 Phoenix, AZ 65072-2034 102-04426-CDM'/SAB'/ JAP March 31, 2000 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
References:
- 1) Letter dated June 11, 1999, "Request for Additional Information on Generic Letter 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," from USNRC, to J. M. Levine, APS
- 2) Letter 102-04355-CDM, dated October 8, 1999, "Response to Generic Letter 95-07, Request for Additional Information," from C. D. Mauldin, APS, to USNRC
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Supplemental Response to Generic Letter 95-07, Request for Additional Information (TAC Nos. M93497, M93498, M93499)
In Reference 1, the NRC requested that Arizona Public Service Company (APS) provide additional information for their review of APS'esponse to Generic Letter 95-07, "Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves." The requested information was submitted to the NRC in Reference 2. On December 7, 1999, following the review of this information, the need for further information was discussed with the NRC staff. This requested information is provided in the accompanying enclosures.
P 0 ~ P
U.S. Nuclear'Regulator 'ommission ATTN: Document Control Desk Supplemental Response to Generic Letter 95-07, Request for Additional Information Page 2 No commitments are being made to the NRC by this letter. If you have any questions,
.please contact Scott A. Bauer at (623) 393-5978.
CD M/SAB/JAP/kg Enclosures cc: E. W. Merschoff (w/ enclosure 1 only)
M. B. Fields (w/ enclosures)
J. H. Moorman (w/enclosure 1 only)
0 4 I
IQ
Distri64;txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients.: Copies:
M Fields Not Found C Jamerson 1 Not Found Internal Recipients:
Rids Res DetMeb 1 OK Rids Res DetErab 1 OK RES/DET/MEB 1 Not Found RES/DET/ERAB 1 Not Found OGC/RP Not Found:
FIL CENTER 0 Not Found CR Not Found External Recipients:
NOAC Not. Found INEEL Marshall Not Found Total Copies:
'Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003684223
Subject:
Palo Verde. Nuclear Generating Station, Unit 1, Second 10-Year Interval - Eighth Refuelin g Gutage (U1R8) Inservice Inspection Summary Report.
Body:
Docket: 05000528, Notes: STANDARDIZED:PLANT
'Page 1'
il
'l
David Mauldin 10CFR50.55a Vice President Mail Station 7605 Palo Verde Nuclear Nuclear Engineering TEL (623) 393-5553 P.O. Box 52034 Generating Station and Support FAX (623) 3936077 Phoenix, AZ 85072-2034 102-04405-CD M/AKK/RKB February 8, 2000 U.S. Nuclear Regulatory Commission ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 Unit 1 Second 10-Year Interval Eighth Refueling Outage (U1RS)
Inservice Inspection (ISI) Summary Report Pursuant to 10 CFR 50.55a and IWA-6230 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 1989 Edition, Arizona Public Service Company (APS) hereby submits the PVNGS Unit 1 Inservice Inspection Report for the eighth refueling outage, provided in enclosure 1. In addition, enclosure 2 contains the ISI summary report for the first interval reactor vessel exams and reactor head vent system exams performed during U1R8 pursuant to Relief Request Nos. 10 and 11, respectively. Relief Request No. 10 to defer the reactor vessel exams to the first outage of the second 10-year interval has been previously approved by the NRC Staff. Relief Request No. 11 to defer the reactor head vent system exams has been submitted and is pending NRC Staff approval.
No commitments are being made to the NRC by this letter.
Should you have any questions, please contact Scott A. Bauer at (623) 393-5978.
Sincerely, CDM/AKK/RKB/mah Enclosure cc: E. W. Merschoff [Region IV Administrator]
M. B. Fields [NRR Project Manager]
J. H. Moorman [Senior Resident Inspector]
6 D4<'~> L5
0 !I w ~
Distri59.txt I/z/gsuu Distribution Sheet Priority: Normal From: Elaine Walker Action Recipients: Copies:
M Fields 1 Not Found Internal Recipients:
RGN 4 FILE 01 Not Found OE Not Found-NRR/DIP M/EPHB Not Found FILE CENTER 1 Not Found External Recipients:
NOAC Not Found Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003677247
Subject:
Palo Verde Federal Emergency Management Agency's Report dated December 7, 1999, 99-E-076 Body:
.Docket: 05000528, Notes: STANDARDIZED PLANT Docket: 05000529,, Notes: Standardized plant.
Docket: 05000530, Notes: Standardized. plant.
Page 1
a
~I ig)
'f I
I
l 4 ~
~o uNITED STATES NUCL'EAR REGULATORY COMMlSS ION C
O REGION IV sl Cp, 611 RYAN PL'AZA DRIVE, SUITE'400
+~ ~O ARLINGTON, TEXAS 76011-8064 january 24, ZOOO Gregg R. Overbeck, Senior Vice President, Nuclear Arizona Public Service Company P..O. Box 52034 Phoenix, Arizona 85072-2034 SUBJECT'EDERAL EMERGENCY MANAGEMENTAGENCY'S REPORT
Dear Mr.'Overbeck:
Enclosed is a copy of the Federal Emergency Management Agency's (FEMA) exercise evaluation report of the March 9, 1999, emergency preparedness exercise at the Palo Verde Nuclear Generating Station.
The report indicates that FEMA observed no deficiencies during the exercise. FEMA identified 16 Areas Requiring Corrective Action {ARCAS) during the exercise, and,10 ARCAs,from previous exercises remained uncorrected.
The purpose of this letter is to transmit to you the results of. the FEMA evaluation of the emergency exercise. No response to the NRC is required.
Sincerely Gail M. Good, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-528 50-529 50-530 License Nos.: NPF-41 NPF-51 NPF-74
Enclosure:
As stated
0 ~
I
-l.
Arizona Public Service Company
,cc w/o enclosure:
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, California 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Angela K. Krainik, Director Regulatory Affairs Arizona Public Service Company P.O. Box 52034 Phoenix, Arizona 85072-2034 John C. Horne, Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, Arizona 85004 Terry Bassham, Esq.
General Counsel El Paso Electric Company 123 W. Mills El Paso, Texas 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public-Power Authority P.O. Box 51111, Room 1255-C, Los Angeles, California 90051-0100
~I 41 l
Arizona Public Service Company David Summers Public Service Company of New Mexico
~ 414 Silver. SW, N206 A(buquerque, New. Mexico 87102 Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DlN San Clemente, California 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251 Training, Exercises, 8 Evalu'ation Branch Chief FEMA Region lX Building 105 Presidio of-San Francisco San Francisco, CA '94129
0 I Arizona Public. Service Company DISTRIBUTION w/co of-FEMAre ort ADAMSAccessionPML003671340:
DCD (IE35)
RIV File DRS/PSB Action Item File (99-E-076)(Hodges)
DISTRIBUTION w/o:co of FEMA re ort:
Regional Administrator DRP Director DRS'Director Branch Chief'(DRP/D)
Senior Project Engineer (DRP/D)
Branch Chief'(DRP/TSS)
C. A. Hackney, RSLO PV Resident Inspector RITS Coordinator DOCUMENT NAME: S:ADRS)DRSLTRS>EP.MI DEPV0001 FM.LOO.WPD To receive co of document, Indicate In box: C'~ Co without enciosures "E ~ Co with enclosures."N'~'No co RIV:PSB C:DRShPSB WAMaier:nh ~ + GMGood 01/&0 OFFICIAL.RECORD COPY A M J2I!55 *4P TEMPLATE = NRR-036
~
el 4~
Arizona Public Service Company DISTRIBUTIONrw/co ofFEMAre ort ADAMSAccessionOML003671340:
DCD (IE35)
RIV File DRS/PSB Action Item File (99-E-076)(Hodges)
DISTRIBUTION w/o co of FEMA re ort:
Regional Administrator DRP Director DRS Director Branch Chief (DRP/D)
Senior Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
C. A. Hackney,:RSLO PV Resident inspector RITS Coordinator DOCUMENT NAME: S:EDRSEDRSLTRSEEP.MLD'iPV0001FM.L'OO.WPD To receive co of document. indicate In boxt C ~ Co without enctosures "E" ~ Co with enclosures "N" ~ No co Riv:P.SB 01+%0':DRS'LPSB WAMaier:nh GMGood 01')0 OFFICIAL RECORD COPY 0
TEMPLATE = NRR-036
0
<<Hgy Federal Emergency Management Agency Region IX o o" Building 105 Presidio of San Francisco San Francisco, California,94129 OEC f g l999 Mr. Ellis Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza, Suite 400 Arlington, Texas 76011-8064 Dear Mr. Merschoff We are enclosing the Final. Evaluation Report for the March 9, 1999, Off-site Biennial Exercise for the Palo Verde Nuclear Generating Station (PVNGS). The report addresses the evaluation of the plans and preparedness for the public in the Emergency Planning Zone. We identified 16 issues during this exercise, and 10 issues from previous exercises remain uncorrected. We will provide a copy of the report to the State of Arizona and monitor the correction of the identified issues.
The level of preparedness and the adequacy of the oF-site radiological emergency response plans for the State of California and the jurisdictions site-specific to PVNGS, together with the ability to implement these plans, were demonstrated in the referenced drill. Based on the results of this drill, we have determined that there is reasonable assurance that appropriate measures can be taken off-site to protect the health and safety of the public in the event of a radiological emergency at PVNGS. Therefore, the Title 44 CFR, Part 350 approval of the off-site radiological emergency response plans and preparedness for the State of Arizona site-specific to PVNGS will remain in effect.
Please contact me directly at (415) 923-7100, or your staff may contact Mr. Tom Ridgeway, Regional Assistance Committee Chair, at {415) 923-7277, if you have any questions or need additional information.
I
~~ ~g~
Sincerely, artha Whetstone e onal Director Enclosure cc: Ms. Vanessa QuinnFEMA HQ Mr. Charles L. Miller, NRC HQ W t ~psg 7y3fd I
ll 4i Distri24.txt Distribution Sheet Priority: Normal Esperanza Lomosbog
'rom:
Action Recipients: Copies:
M Fields 1 Not Found Internal Recipients:
'RGN 4 ..FILE Not Found RGN 4 .ERC Not Found Not Found FILE CENTER Not Found Not Found, External Recipients:
NRC PDR Not Found Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTADOl ID: 993640195
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2,&3 Emergenc y Response Data System (ERDS) Data- Point Library Update Body:
PDR ADOCK 05000528 F Docket: 05000528, Notes: STANDARDIZED PLANT Docket: 05000529, Notes: Standardized 'plant.
Docket: 05000530, Notes: Standardized plant.
Page 1
0 0 J%
{II 1
Angela K. Krainik Director, Regulatory Affairs Mail Station 7636 Palo Verde Nuclear Tel: 623/393.5421 P.O, Box 52034, Generating Station Fax. 623/393-5442 Phoenix, AZ 85072-2034 102-04387-AKK/SAB/C J J December 22, 1999 U.S. Nuclear Regulatory Commission ATTN: Document Control. Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating, Station (PVNGS)
Units1,2,53 Docket Nos. STN 50-528/529/530
.Emergency Response Data System (ERDS) Data Point Library Update Pursuant to 10 CFR Part 50 Appendix E, Section VI.3.a, enclosed please find a copy of the ERDS Data Point Library Update. PVNGS recently changed the ERDS database during a radiation monitoring system (RMS) modification. Changes include description changes requested by Operations and setpoint changes for RMS link points. The setpoints are now received by. the Emergency Response Facility Data Acquisition Display System, from RMS automatically. The changed data. are identified on the enclosed update by means of a cloud.
There is no other impact to the operation or structure of the ERDS program. No commitments are being made to the, NRC by this letter. Should you have any questions, please contact Scott A. Bauer at (623) 393-5978.
Sincerely, A'KK/SAB/CJ J/kg Enclosure cc: E. W. Merschoff M. B. Fields ~pit Qi J. H. Moorman