ML17010A283

From kanterella
Jump to navigation Jump to search
Boiling Water Reactor - Report of Investigation Pursuant to 10 CFR Part 20 Appendix G
ML17010A283
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 01/09/2017
From: Gerard van Noordennen
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards, NRC/RGN-III
References
LC-2017-0004
Download: ML17010A283 (4)


Text

~

  • LACROSSESOLUTIONS 10 CFR 20 Appendix G January 9, 2017 LC-2017-0004 U.S. Nuclear Regulatory Commission, Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

Report of Investigation Pursuant to 10 CFR Part 20 Appendix G This letter documents the results of an investigation performed with respect to twelve radioactive waste shipments contained on two railcars, which exceeded the 20 day limit for notification of receipt from the disposal facility as specified in 10 CFR part 20 Appendix G. The investigation was completed on January 3, 2017. The shipments were being traced on a daily basis and the location of the shipments were known to the carrier, Union Pacific Railroad (UP) and to LaCrosseSolutions, LLC Waste Operations personnel. The disposal facility notification verified that the shipments were received as indicated below.

10 CFR part 20 Appendix G, "Requirements for Transfers ofLow-Level Radioactive Waste Intended for Disposal at Licensed Land Disposal facilities and Manifests, " Section III.A(9) states a licensee shall for any shipments or any part of a shipment for which acknowledgment of receipt has not been received within the times set forth in this appendix, conduct an investigation in accordance with paragraph E of this appendix.

Paragraph E states that any shipment or part of shipment for which acknowledgment is not received within the times set forth in this section must:

1. Be investigated by the shipper if the shipper has not received notification or receipt within 20 days after transfer; and
2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part.

Each licensee who conducts a trace investigation shall file a written report with the appropriate NRC regional Office within 2 weeks of completion of the investigation.

Investigation Receipt acknowledgements from the Clive Disposal Facility for the 12 radioactive waste shipments contained on the two railcars listed below were received on December 27, 2016. The shipments consisted of intermodal containers which were transloaded onto railcars at the Winona, MN transload facility. The shipment date is the date the truck carrying the intermodal left the LACBWR Site Restoration Project enroute to the Winona, MN transload facility. tz. r,.tJ D ~

'{')~~Sol N~s? 7-lP S4601 State Highway 35, Genoa, WI 54632 ~~..;~

LaCrosseSolutions LC-2017-0004 Page 2 of3 Shipment Manifest Shipment Activity Rail car Acknowledgement Contents Number Number Date mCi Number Due Date 0978 Demolition GIMX-RW-16-009 11/30/16 6.7425 12/20/16 0005 Debris 007021 0978 Demolition GIMX-RW-16-010 12/2/16 6.3666 12/22/16 0007 Debris 007021 0978 Demolition GIMX-RW-16-011 12/2/16 6.4474 12/22/16 0014 Debris 007021 0978 Demolition GIMX-RW-16-012 12/2/16 6.2664 12/22/16 0015 Debris 007021 0978 Demolition GIMX-RW-16-013 12/2/16 11.519 12/22/16 0003 Debris 007021 0978 Demolition GIMX-RW-16-014 12/2/16 7.4425 12/22/16 0016 Debris 007021 0978 Demolition GIMX-RW-16--015 12/2/16 0.8388 12/22/16 0017 Debris 007021 0978 Demolition GIMX-RW-16-016 12/6/16 6.8005 12/26/16 0018 Debris 007010 0978 Demolition GIMX-RW-16-017 12/6/16 5.9276 12/26/16 0019 Debris 007010 0978 Demolition GIMX-RW-16-018 12/6/16 6.6893 12/26/16 0020 Debris 007010 0978 Demolition GIMX-RW-16-019 12/6/16 231.48 12/26/16 0021 Debris 007010 0978 Demolition GIMX-RW-16-020 12/6/16 6.1028 12/26/16 0010 Debris 007010 Transport of railcar GIMX-007021 started on December 6, 2016 from the Winona, MN transload facility. The railcar was bad ordered (railcar condition requiring repair prior to further transport) for trucks and bolsters on December 15, 2016 at Roper, UT. Repairs were made and the bad order released on December 17, 2016. GIMX-007021 was placed at the Clive Disposal Site on December 20, 2016 and was off-loaded on December 21, 2016.

Transport ofrailcar GIMX007010 started on December 8, 2016 from the Winona, MN transload facility and continued without significant delays to the Clive Disposal facility. GIMX-007010 was placed at the Clive disposal facility on December 20, 2016 and was off-loaded on December 21, 2016.

The Clive Disposal facility provided receipt acknowledgement of the above shipments within the allotted timeframe of 1 week as allowed by 10 CFR 20 Appendix G, Section III, Paragraph D.1.

Due to the rail transit time and the allowed receipt acknowledgement time, receipt acknowledgement was not received at LACBWR in the 20 day time frame provided for in 10 CFR 20 Appendix G, Section III, Paragraph E.l. Total transit time between when the first

LaCrosseSolutions LC-2017-0004 Page 3of3 container was released from the LACBWR site, beginning November 30, 2016, until verification of receipt was received ranged from twenty-one (21) to twenty-seven (27) days. Industry experience shows these transit times are not inordinate and/or uncommon during rail transportation. The location of the railcars containing the shipments were traced by LaCrosseSolutions, LLC on a daily basis until their receipt by EnergySolutions. At no time were the shipments lost or at an unknown location.

Should you have any questions regarding this submittal, please contact me at 224-789-4025.

Respectfully,

,4,._~ /

Eor r7-.---

aerard van Noordennen Vice President Regulatory Affairs cc: Marlayna Vaaler, U.S. NRC Project Manager U.S. NRC, Document Control Desk Service List

La Crosse Boiling Water Reactor Service List cc:

Ken Robuck Jeffery Kitsembel Group President Disposal and Division of Energy Regulation Decommissioning Wisconsin Public Service Commission EnergySolutions P .0. Box 7854 299 South Main Street, Suite 1700 Madison, WI 53707-7854 Salt Lake City, UT 84111 Paul Schmidt, Manager John Sauger Radiation Protection Section Executive VP and Chief Nuclear Officer Bureau of Environmental and Occupational Health ReactorD&D Division of Public Health EnergySolutions Wisconsin Department of Health Services 2701 Deborah A venue P .0. Box 2659 Zion, IL 60099 Madison, WI 53701-2659 Gerard van Noordennen Barbara Nick VP Regulatory Affairs President and CEO EnergySolutions Dairyland Power Cooperative 2701 Deborah Avenue 3200 East Avenue South,

  • Zion, IL 60099 La Crosse, WI 54602-0817 Joseph Nowak Cheryl Olson, ISFSI Manager General Manager La Crosse Boiling Water Reactor LaCrosseSolutions Dairyland Power Cooperative S4601 State Highway 35 S4601 State Highway 35 Genoa, WI54632-8846 P.O. Box 817 Genoa, WI54632-8846 Dan Shrum Senior VP Regulatory Affairs Lane Peters EnergySolutions La Crosse Boiling Water Reactor 299 South Main Street, Suite 1700 Dairyland Power Cooperative Salt Lake City, UT 84111 S4601 State Highway 35 Genoa, WI 54632-8846 Russ Workman General Counsel Thomas Zaremba EnergySolutions Wheeler, Van Sickle and Anderson, S.C.

299 South Main Street, Suite 1700 44 East Mifflin Street, Suite 1000 Salt Lake City, UT 84111 Madison, WI 53703 Jerome Pedretti, Clerk John E. Matthews Town of Genoa Morgan, Lewis & Bockius LLP E860 Mundsack Road 1111 Pennsylvania Avenue, NW Genoa, WI 54632 Washington, DC 2000