DCL-19-018, ISFSI; Humboldt Bay Power Plant, Unit 3 - Chief Nuclear Officer Contact Information

From kanterella
Jump to navigation Jump to search
ISFSI; Humboldt Bay Power Plant, Unit 3 - Chief Nuclear Officer Contact Information
ML19066A408
Person / Time
Site: Diablo Canyon, Humboldt Bay
Issue date: 03/07/2019
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
DCL-19-018, DIL-19-006, HBL-19-006, HIL-19-005
Download: ML19066A408 (2)


Text

Pacific Gas and Electric Company*

James M. Welsch Diablo Canyon Power Plant Vice President P.O. Box 56 Nuclear Generation and Avila Beach, CA 93424 Chief Nuclear Officer 805.545.3242 E-Mail: JMW1@pge.com March 7, 2019 PG&E Letter DCL-19-018 PG&E Letter DIL-19-006 PG&E Letter HBL-19-006 PG&E Letter HIL-19-005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Docket No. 50-133, License No. DPR-7 Humboldt Bay Power Plant, Unit 3 Docket No. 72-27, Materials License No. SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation Chief Nuclear Officer Contact Information

Dear Commissioners and Staff:

The purpose of this letter is to inform you that as Vice President, Nuclear Generation and Chief Nuclear Officer for Pacific Gas and Electric Company (PG&E), my existing role has expanded to include nuclear decommissioning, effective March 1, 2019. I will continue to be responsible for the safe, efficient, and reliable operation of Diablo Canyon Power Plant (DCPP), as well as the Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) and Humboldt Bay ISFSI. As part of my new role, I am responsible for the safe decommissioning of Humboldt Bay Power Plant Unit 3, as well as the preparation and planning for the future decommissioning of DCPP Units 1 and 2 after the end of the NRC operating licenses in 2024 and 2025, respectively.

Accordingly, please submit related NRC correspondence to me as follows:

US Mail: James M. Welsch Vice President, Nuclear Generation and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 56 Mail Code 104/6 Avila Beach, California 93424 A member of t he STARS All iance Callaway* Diablo Canyon* Palo Verde* Wo lf Creek

Document Control Desk PG&E Letter DCL-19-018 March 7, 2019 DIL-19-006 Page2 HBL-19-006 HIL-19-005 Overnight: James M. Welsch Vice President, Nuclear Generation and Chief Nuclear Officer Pacific Gas and Electric Company 9 miles NW of Avila Beach Mail Code 104/6 Avila Beach, California 93424 Fax: 805-545-4884 There are no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If you have any questions regarding this matter or require additional information, please contact me at 805-545-3242.

Sincerely,

~~u.).JJ__

Jaritis M. Welsch Vice President, Nuclear Generation and Chief Nuclear Officer hgh6/4720 cc: William C. Allen, NMSS Project Manager John B. Hickman, NRG Project Manager Scott A. Morris, Region IV Administrator Christopher W. Newport, DCPP NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager Diablo Distribution Humboldt Distribution A member of the STARS Alliance Callaway