Title | Failure to Appropriately Scope 230 KV Switchyard into the Maintenance Rule Monitoring Program |
Description | The inspectors identified a Green, non-cited violation of 10 CFR 50.65(b)(2) for the licensees failure to appropriately scope the 230 kV switchyard in the Maintenance Rule monitoring program. Specifically, from the inception of the facilities monitoring program through May 18, 2015, the licensee failed to properly scope or evaluate the 230 kV switchyard to include the entire switchyard up through the first inter-tie circuit breakers CB262 and CB282 into the Maintenance Rule program. Electrical faults within the 230 kV switchyard can cause loss of offsite power which is relied upon to mitigate accidents and cause an actuation of a safety-related systems, such as, emergency diesel generators, and should have been included into its Maintenance Rule program. This issue was entered into the licensees corrective action program as Notifications 50702970 and 50703118. The inspectors determined that the licensees failure to scope the 230 kV offsite power source including the switchyard up through the first breakers from the transmission system into the Maintenance Rule program was contrary to the requirements of 10 CFR 50.65 and therefore a performance deficiency. The performance deficiency was determined to be more than minor because it is associated with the initiating events attribute of protections against external factors and adversely affected the cornerstone objective, in that, a 230 kV switchyard failure can upset plant stability and challenge critical safety functions during shutdown as well as power operations. Failure to monitor the performance or condition of 230 kV offsite power source (including the switchyard up through the first breakers from the transmission system) in a manner sufficient to provide reasonable assurance the offsite power was capable of fulfilling the intended functions affected the reliability of the plant equipment to perform their safety function. The inspectors determined if the 230 kV switchyard was properly scoped into the Maintenance Rule program the loss of offsite power due to the flash over event may have been prevented. However the direct cause of the event has been identified as untimely corrective actions associated with an ineffective corrective action program. As such, improper Maintenance Rule scoping was not the direct cause. Therefore, the inspectors determined the finding could be evaluated using the significant determination process in accordance using IMC 0609, Appendix A, Significance Determination Process (SDP) for Findings At-Power, Exhibit 1, Initiating Events Screening Questions. The inspectors determined that the finding was of very low safety significance (Green) because the finding was determined not to be the cause of the actual 230 kV failure such that all of the screening questions in Exhibit 1 could be answered no. The inspectors determined that since the scoping of the switchyard systems had occurred more than 3 years ago, and the opportunity to reevaluate system scoping had not recently occurred, the finding did not represent current licensee performance and therefore a cross-cutting aspect was not assigned. |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2015002 Section 4OA3 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | J Reynoso M Hayes M Kennard R Alexander T Buchanan T Hipschman |
Violation of: | 10 CFR 50.65(b) 10 CFR 50.65 |