| Title | Inadequate Maintenance Procedure Resulted in Improper Configuration of Safety Related Equipment |
| Description | The inspectors reviewed a Green self-revealing, non-cited violation of Technical Specification 5.4.1.a, Procedures, for failure to implement properly preplanned maintenance procedures affecting the performance of safety-related equipment. Specifically, inspectors reviewed the licensee performance associated with surveillance and maintenance activities and identified two examples of improper configuration of safety-related equipment returned to service, because of inadequate preplanned maintenance procedures. The failure to implement properly preplanned maintenance procedures affecting the performance of safety-related equipment is a performance deficiency. The inspectors determined that the finding was more than minor because it is associated with the procedure quality attribute of the Mitigating System Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesired consequences. Specifically, the restriction of airflow caused by inadvertent closure of ventilation registers following the damper inspection resulted in the undesired consequences of higher ambient 480 volt switchgear room temperatures. In addition, the misconfiguration of the source range N-32 nuclear instrumentation impacted the functioning of the P-6 permissive and prevented it from performing properly during Unit 2 reactor startup such that operator action was necessary to prevent damage to the detector. Using Inspection Manual Chapter 0609, Attachment 04, Initial Characterization of Findings, and Appendix A, Exhibit 2, Mitigating Systems Screening Questions, this finding was determined to be of very low safety significance (Green) because the finding was a deficiency affecting the design or qualification of mitigating structures, systems, and components that did not affect operability or functionality. The inspectors concluded that this finding affected the cross-cutting aspect of human performance associated with documentation, because the licensee did not ensure plant activities are governed with comprehensive maintenance procedures which are complete, accurate, and up to date to ensure work processes did not affect the performance of safety-related equipment. |
| Site: | Diablo Canyon |
|---|---|
| Report | IR 05000275/2014004 Section 4OA2 |
| Date counted | Sep 30, 2014 (2014Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | C Alldredge C Osterholtz J Mateychick J O'Donnell J Reynoso L Carson L Micewski L Ricketson M Bloodgood N Greene T Hipschman W Walker |
| Violation of: | Technical Specification - Procedures Technical Specification |
| CCA | H.7, Documentation |
| INPO aspect | WP.3 |
| ' | |