Title | Inadequate Design Control for High-Energy Line Break Vent Flow Path |
Description | The inspectors identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, involving the licensees failure to ensure credited design features, such as flow vent paths, protect safety-related systems, from temperature and pressure effects of a high-energy line break (HELB) in the auxiliary building. Specifically, the licensee allowed obstruction of a credited flow path with acrylic glass plates not qualified in the original design and not verified to function under a HELB scenario. The licensee entered this issue into the corrective action program as Notifications 50697910 and 50698102, and took immediate actions to remove the acrylic glass plates from the vent path doors in the auxiliary building. The performance deficiency was determined to be more than minor because it affected the Mitigating Systems Cornerstone attribute of Design Control and adversely affected the cornerstone objective of ensuring the reliability, availability and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee did not have adequate measures in place to ensure that qualified components were available to mitigate the consequences of a HELB in the auxiliary building. The finding screened as of very low safety significance (Green) because the finding did not affect the design or qualification of mitigating structures, systems, and components; the finding did not represent a loss of system and/or function; the finding did not represent an actual loss of a function of a single train for greater than the technical specification (TS) allowed outage time; the finding did not represent an actual loss of a function of one or more non-TS trains of equipment; and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The finding was not assigned a cross-cutting aspect since the performance deficiency is not indicative of current plant performance. |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2015002 Section 4OA2 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Reynoso M Hayes M Kennard R Alexander T Buchanan T Hipschman |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
INPO aspect | |
' | |