Pages that link to "L-MT-22-003, Submittal of Revision 1 of the Core Operating Limits Report for Cycle 31"
Jump to navigation
Jump to search
The following pages link to L-MT-22-003, Submittal of Revision 1 of the Core Operating Limits Report for Cycle 31:
Displayed 50 items.
- ML17153A043 (← links)
- ML13234A317 (← links)
- L-HU-08-022, Nuclear Industry Comments on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel (← links)
- L-HU-08-019, Request for Continuation of NRC Reviews for Nuclear Management Co. Submittals on the Docket as of September 22, 2008 (← links)
- L-HU-08-018, Monticello, and Prairie Island Plants - Fitness for Duty Performance Data (← links)
- L-HU-07-010, Transmittal of Monticello and Prairie Island, Units 1 and 2, Guarantee of Payment of Deferred Premiums (← links)
- L-HU-06-027, 2005 Annual Report Including Certified Financial Statements, for Prairie Island Nuclear Generating Plant Unit 1 & 2, Monticello Nuclear Generating Plant (← links)
- L-HU-06-017, Supplement to Lrradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimates for the Monticello Nuclear Generating Plant (← links)
- L-HU-06-011, Decommissioning Funding Status Report (← links)
- L-MT-18-044, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan (← links)
- L-MT-18-034, Supplement to Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 15 (CAC No. 001028, EPID L-2017-LLE-0029 (← links)
- L-MT-18-028, Changes to the Monticello Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program. (Cover Letter Only) (← links)
- L-MT-18-024, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan (← links)
- L-MT-17-080, Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan (← links)
- L-MT-17-053, Redacted - Monticello and Independent Spent Fuel Storage Installation - Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 15 (← links)
- L-MT-17-054, Changes to the Monticello Nuclear Generating Plant Security Plan, Training and Qualification Plan. Safeguards Contingency Plan. and Independent Spent Fuel Storage Installation Security Program (← links)
- L-MT-17-052, Submittal of Monticello Nuclear Generating Plant (MNGP) Emergency Plan (EP) 2017 Exercise Scenario (← links)
- L-MT-17-048, Submittal of Change to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan (← links)
- L-MT-17-029, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan (← links)
- L-MT-16-039, Response to Nuclear Security and Incident Response Requests for Additional Information Regarding Changes to the Monticello Nuclear Generation Plant Physical Security Plan (Revision 16) Pursuant to 10 CFR 50.54(p)(2) (← links)
- L-MT-15-057, License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions (← links)
- L-MT-15-071, Representative for the Monticello Nuclear Generating Plant Alternative Dispute Resolution (← links)
- L-MT-15-010, 2015 Monticello Nuclear Generating Plant Initial License Examination Licensee Letter Transmitting the Proposed Written Examination (← links)
- L-MT-14-088, Areva Atrium 10XM Fuel Transition License Amendment Request Supplement (← links)
- L-MT-14-052, Mngp'S Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) (← links)
- L-MT-14-024, L-MT-14-024, Request for NRC Assistance to Obtain Information on Dams from the Us Army Corps of Engineers (Usace) (← links)
- L-MT-14-002, Deviation from Bwrvi P-181-A Solution Annealing/Weld Inspection Requirement (← links)
- L-MT-13-051, MNGP Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-MT-13-079, Monticello'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- L-MT-13-080, Monticello'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- L-MT-13-075, Request to Change 2013 Monticello Nuclear Generating Plant (MNGP) Licensed Operator Requalification Program Inspection. 71111.11 (← links)
- L-MT-13-058, Responses to Requests for Additional Information Regarding Monticello Overall Integrated Plan Submitted in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrument (← links)
- L-MT-13-066, Clarification to Monticello Nuclear Generating Plant'S 60-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights.. (← links)
- L-MT-13-032, Correction to the MNGP Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-MT-12-117, 10 CFR 50.46 Thirty-Day Report (← links)
- L-MT-12-095, Emergency Preparedness (EP) Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Fo (← links)
- L-MT-12-074, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091) (← links)
- L-MT-12-058, MNGP 90-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-MT-12-057, Emergency Preparedness Information Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insig (← links)
- L-MT-12-027, License Amendment Request: Provide Restoration Period Before Declaring Average Power Range Monitors Inoperable When Surveillance Requirement 3.3.1.1.2 Not Met (← links)
- L-MT-12-011, Supplement to 10CFR50.55a Requests Associated with the Fourth and Fifth Lnservice Lnspection Ten-Year Intervals (← links)
- L-MT-11-056, 10CFR50.55a Requests Associated with the Fifth Lnservice Inspection Ten-Year Interval (← links)
- L-MT-11-042, Submission of Revisions 10 and 11 to the Monticello Security Plan (← links)
- L-MT-10-050, 2010 Monticello Nuclear Generating Plant Initial Examination Outline Submittal (← links)
- L-MT-10-080, Correction to Appendix C of the Monticello Individual Plant Examination of External Events (← links)
- L-MT-10-062, Response to Request for Additional Information Regarding 10 CFR 50.55a Request No. 19 (RR-19): Relief from Impractical Examination Coverage, Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Lnservice Inspection I (← links)
- L-MT-10-054, Response to Requests for Additional Information Concerning Extension of Permanent Relief from Inspection Requirements of 10 CFR 50.55a(g) for Volumetric Examination of Reactor Pressure Vessel Shell Circumferential Welds for the Renewed O (← links)
- L-MT-10-015, 10 CFR 50.55a Request No. 16: Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations (← links)
- L-MT-09-100, Xcel Energy Request for NRC Concurrent Review of Monticello Nuclear Generating Plant Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request (LAR) with MNGP Extended Power Uprate (EPU) LAR Review Delay (← links)
- L-MT-09-096, Required 30-Day Offsite Dose Calculation Manual Report for the Monticello Nuclear Generating Plant (← links)