L-MT-17-052, Submittal of Monticello Nuclear Generating Plant (MNGP) Emergency Plan (EP) 2017 Exercise Scenario

From kanterella
Jump to navigation Jump to search
Submittal of Monticello Nuclear Generating Plant (MNGP) Emergency Plan (EP) 2017 Exercise Scenario
ML17192A337
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/28/2017
From: Gardner P
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-17-052
Download: ML17192A337 (3)


Text

ENCLOSURE CONTAINS SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390

~ *xcel Energy Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 June 28, 2017 L-MT-17-052 10 CFR 50.4(b)(5) 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Monticello Nuclear Generating Plant (MNGP) Emergency Plan (EP) 2017 Exercise Scenario In accordance with the provisions of 10 CFR 50.4(b)(5), Emergency Plan and related submissions" and 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities,"Section IV, paragraph (F)(2)(b), Northern States Power Company, a Minnesota Corporation (NSPM}, doing business as Xcel Energy, provides the MNGP Emergency Plan Exercise Scenario Package. The exercise is scheduled to be conducted at the MNGP on August 29, 2017. This emergency plan exercise is a biennial full-participation exercise, and therefore, will involve the participation of offsite emergency response agencies.

The enclosure provides the scenario objectives and guidelines, participant and controller instructions, narrative and timeline of exercise events, messages and drill instructions, and simulator operator guidance. This package also contains exercise scenario data related to plant conditions and response, onsite and offsite radiation levels and release rates, chemistry data, meteorological data, and samples of the data to be presented. Participant and controller rosters will be available on the day of the exercise. The scenario package contains company confidential information and pursuant to 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," NSPM requests this enclosure be withheld from public disclosure.

Availability of this enclosure should be controlled as non-public information to ensure confidentiality from exercise responders until the conduct of the exercise is concluded.

Document Control Desk L-MT-17-052 Page 2 of 2 The enclosed CD ROM contains the required documents in the PDF format.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure (CD ROM Disk) cc: Administrator, Region Ill, USNRC (with Enclosure)

Gregory Hansen, Region Ill, USNRC (with Enclosure)

Michelle Garza, Region Ill, USNRC (with Enclosure)

Resident Inspector, MNGP (w/o Enclosure)

QF0212, Revision 5 (FP-SC-RSl-04) Page 1 of 1 fl, Xcel Energy SHIPPING DOCUMENT NORTHERN STATES POWER -MN D/B/A Xcel Energy Monticello Nuclear Plant, 2807 W Hwy. 75, Monticello, MN 55362 Shipping Document Date: 6-28-17 Tracking Number:

Ship To:

USN RC 11555 Rockville Pike Rockville, MD 20852-2738 Attention Of: Doc Control Carrier: UPS - Standard Overnight RMANo:

Pro I Tracking No: PO I Contract No:

Packaging:*

Number of Packages: 1 I Weight:

Dangerous Goods/ UN/NA No: Insurance Est. Value Hazardous Materials? Required?

Reason for Shipment: Overnight Shipment to USN RC DeNae Sievers - Please ensure tracking number is communicated to me - denae.sievers@xe_nuclear.com Item No. Qty. Unit Description Catalog ID/Q Env Submittal to NRC L-MT-17-052 Requestor: . Date: (g ,{ *

. 'J¥µ1 By signing this shipping document you are declaring, to the best of your knowledge, that the material being shipped is in

  • compliance with Xcel Energy Corporate Policies. Please print and sign your name legibly.

SWIP Making Shipment: Date:

Received By: Date:

For will-ca/I use only Use of this form as a procedural aid does not require retention as a quality record.