NAD-MN-042NP, Revision 1, Monticello Nuclear Generating Plant Cycle 29 Non-Proprietary Core Operating Limits Report.
ML17153A043
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/15/2017
From: Smolinske K
Xcel Energy
To:
Office of Nuclear Reactor Regulation
References
NAD-MN-042NP, Rev 1
Download: ML17153A043 (53)


Text

ENCLOSURE 1 MONTICELLO NUCLEAR GENERATING PLANT CYCLE 29 CORE OPERATING LIMITS REPORT NON-PROPRIETARY NAD-MN-042NP REVISION 1 (52 pages follow)

L_______ _ _J

~;. XcelEnen .*~

  • " , gy Mo.n*ticello *Nuclear*Ge.neratit1g ;Plant cyc1e:29
  • N*on-Proprietaty Core . Qpera.tit1g Llmit~ ,t{.~port NA.O.-:MN~042NP Revis.ion' '1 *

.*-'~.,

~~.*.*.*.*. : *.. . . *.. ** . **

Prepared: ey: . *<. Date:

._.. K9nr1eth.Srn0Httsk9-:"* * * ,. * ,, -* _ .

    • .$~111orl:ri~ineef:u'J'!luclear Ai1iill~isatid*D~lgll verified By: ~~??
  • . ~slonkowskl * **

~flglnee~, f"uclearAnalysis and D(:!slgn

    • ~****

Reviewed.By: . . . -:-=* *.; : : ; ;

Tamara: . ney * * *** . .

Reactor Ellglileerlng ,.,. Monticello

'n*.~. *. -.-.' .

ApprovedJ3y: -. ..z:*~-~~~:==--===*~c::::::;'ii=***~.*****~~=~

. Darius Ahrar =***=*=*::.:~

.Supervisor; Nuclear Analysls ~rid pesigi'l 111forrnattori Notice This is a no11-proprletary ver8.fon,of ttieMontlcelloNuclear:Generatlng.Pllilht Cycie*2.9 COLR~

NAD*MN-042;.Revlsfob 1, whlch:hasproprletary lnfPrin~tlon removed. Portiol1~:ofthedoc_uiriell,t' that have; been remcived are lndi~ated bywblte space Inside. open Eiiid qlosed brackets as shown here (( * * ]), * * * ** *

  • NAD~MN~D42NJ>1* Monticello Cycle 29,..

C:OLR,,** Revision 1

Table of Contents Section/Description Page#

1.0 CORE OPERATING LIMITS REPORT (COLR) ..................................................................... 4.

2.0 REFERENCES

.................................................................................................................:..... 4 3.0 ROD BLOCK MONITOR OPERABILITY REQUIREMENTS ................................................. 6 4.0 ROD BLOCK MONITOR UPSCALE TRIP SETPOINT ......................................................... 6 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) ..................................................................... 7 5.1 TECH. SPEC. SCRAM SPEED (TSSS) ..................................................................................... 7 5.1.1 TSSS OLM CPR for Two Recirculation Loop Operation ...................................... 7 5.1.2 TSSS OLM CPR for Single Recirculation Loop Operation ................................... 7 5.2 NOMINAL SCRAM SPEED (NSS) ............................................................................................. 8 5.2.1 NSS OLMCPR for Two Recirculation Loop Operation ........................................ 8 5.2.2 NSS OLMCPR for Single Recirculation Loop Operation ..................................... 9 5.3 TECHNICAL SPECIFICATION SCRAM TIME DEPENDENCE .......................................................... 9 5.4 PRESSURE REGULATOR 0UTOF SERVICE (PROOS) OPERATION ......................................... 10 5.4.1 OLMCPR for Two Recirculation Loop Operation, WITHOUT A BACKUP PRESSURE REGULATOR ................................................................................... 11 5.4.2 OLMCPR for Single Recirculation Loop Operation, WITHOUT A BACKUP PRESSURE REGULATOR ................................................................................... 11 6.0 POWER-FLOW MAP ............................................................................................................ 11 7.0 APPROVED ANALYTICAL METHODS ............................................................................... 12 8.0 FUEL ROD HEAT GENERATION RATE ............................................................................. 13 8.1 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) AS A FUNCTION OF EXPOSURE. ......................................................................................................................... 13 8.1.1 Two-Recirculation Loop Operation (MAPLHGR) .............................................. 13 8.1.2 Single Recirculation Loop Operation (MAPLHGR) ............................................ 14 8.2 LINEAR HEAT GENERATION RATE (LHGR) ........................................................................... 14 8.2.1 Two-Recirculation Loop Operation (LHGR) ...................................................... 14 8.2.2 Single Recirculation Loop Operation (LHGR) ....................................... ~ ........... 15 8.3 PRESSURE REGULATOR OUT OF SERVICE (PROOS) OPERATION ......................................... 15 9.0 CORE STABILITY REQUIREMENTS .................................................................................. 30 9.1 STABILITY E0-111 SOLUTION ................................................................................................. 30 9.2 ENHANCED OPTION Ill OPRM SETPOINTS ........................................................................... 30 9.3 EXTENDED FLOW WINDOW STABILITY - HIGH SCRAM ........................................................... 32 9.4 BACKUP STABILITY PROTECTION REGIONS ........................................................................... 32 9.5 ACTIONS FOR ENTRY INTO SCRAM REGION .......................................................................... 33 9.6 ACTIONS FOR ENTRY INTO CONTROLLED ENTRYREGION ..................................................... 33 10.0 . TURBINE BYPASS SYSTEM RESPONSE TIME ........................................................... 34 11.0 SHUTDOWN MARGIN (SOM) CONFIRMATION ............................................................ 34 12.0 APRM SIMULATED THERMAL POWER- HIGH, DELTA W ALLOWABLE VALUE ... 35 NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 2 of 52

List of Tables Table/Description Page#

Table 1 NSS Scram Insertion Time to CRD Notch Position ............................................ 10 Table 2 Cycle OLMCPR Values ....................................................................................... 10 Table 3 MAPLHGRLimits, ATRIUM lOXM ................................................................. 17 Table 4 MAPLHGR Limits, GE14C EDB-3375 ............................................................ 18 Table 5 MAPLHGR Limits, GE14C EDB-3377 .............................................................. 19 Table 6 MAPLHGR Limits, GE14C EDB-4175 .............................................................. 20 Table 7 MAPLHGR Limits, GE14C_EDB-4176 .............................................................. 21 Table 8 MAPLHGR Limits, GE14C EDB-4177 .............................................................. 22 Table 9 MAPLHGR Limits, GE14C EDB-4178 .............................................................. 23 Table 10 MAPLHGR Limits, GE14C EDB-4332 ............................................................ 24 Table 11 MAPLHGR Limits, GE14C EDB-4333 ............................................................ 25 Table 12 MAPLHGR Limits, GE14C EDB-4337 ............................................................ 26 Table 13 MAPLHGR Limits, GE14C EDB-4338 ............................................................ 27 Table 14 ATRIUM lOXM Steady-State LHGR Limits .................................................... 28 Table 15 GE14 U02/Gd Thermal Mechanical LHGR Limits ......................................... 29 Table 16 OPRM Setpoint Versus OLMCPR .................................................................. 31 Table 17 Relationship Between OPRM Successive Confirmation Count Setpoint and OPRM Amplitude Setpoint ............................................................................................. 31 Table 18 EFWS Nominal Setpoints for the Scram Region............................................... 32 Table 19 BSP Endpoints for Normal Feedwater Temperature ......................................... 33 List of Figures Figure/Description Page #

Figure 1 Power Dependent LHGR Multipliers ................................................................ 36 Figure 2 Flow Dependent LHGR Multipliers .................................................................. 37 Figure 3 Power Dependent MCPR(P) Limits for TSSS Insertion Rates ......................... 38 Figure 4 Power Dependent MCPR(P) Limits for NSS - BOC to 12.9 GWd/MTU ........ 39 Figure 5 Power Dependent MCPR(P) Limits for NSS - BOC to EOFP ......................... 40 Figure 6 Power Dependent MCPR(P) Limits for NSS - BOC to Coastdown ................. 41 Figure 7 Flow Dependent MCPR Limits ......................................................................... 42 Figure 8 Power/Flow Map****************************:****************************************************************** 43 Figure 9 Power Dependent MCPR(P) Limits for Pressure Regulator Out of Service (PROOS) ........................................................................................................................... 44 Figure 10 Pressure Regulator Out Of Service Interim MFLCPR Limit ........................... 45 Figure 11 Power Dependent LHGR Multipliers for Pressure Regulator Out of Service (PROOS) ............................................................................................................................ 46 Figure 12 Pressure Regulator Out of Service (PROOS) Interim MFLPD Limit ............. 47 Figure 13 Power Dependent MCPR(P) Limits for SLO with NSS/TSSS Insertion Rates

...................................................................................................................................... ~ .... 48 Figure 14 Power Dependent MAPLHGR Multipliers ..................................................... 49 Figure 15 Flow Dependent MAPLHGR Multipliers ....................................................... 50 Figure 16 Pressure Regulator Out Of Service (PROOS) ................................................. 51 Figure 17 Pressure Regulator Out of Service (PROOS) Interim MAPRAT Limits ........ 52 NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 3 of52

1.0 Core Operating Limits Report (COLR)

This Core Operating Limits Report for Monticello Nuclear Generating Plant (MNGP)

Cycle 29 is prepared in accordance with the requirements of Technical Specification 5.6.3. The core operating limits are developed using NRC-approved methodology as listed in Section 7 of this COLR and are established such that all applicable thermal limits of the plant safety analysis are met. With respect to Technical Specification 2.1.1, the analysis methods for Cycle 29 are "AREVA Methods."

A 0.03 penalty will be applied when the ratio of core power to core flow is~ 42 MWt I Mlbm/hr in the EFW region. The 0.03 penalty is not applied when MNGP is operating in the Maximum Extended Load Line Uniit (MELLLA) region or operating in the EFW region where the ratio of core power to core flow is < 42 MWt I Mlbm/hr. The OLMCPRs in Section 5 of this COLR were selected to ensure that the MCPR SLs of Tech Spec SL 2.1 are not violated ..

This report includes the Enhanced Option Ill (E0-111) long term stability solution, which is required to operate in the Extended Flow Window (EFW) (i.e., MELLLA+) region of the Power-flow map.

This report includes using COTRANSA2 (Reference 10.0), XCOBRA (Reference 11.0),

XCOBRA-T (Reference 12.0) and CASM0-4/MICROBURN-B2 (Reference 13.0) as described in the AREVA THERMEX methodology report (Reference 11.0) and neutronics methodology report (Reference 14.0).

2.0 References 1.0 General Electric Standard Application for Reactor Fuel (GESTAR-11}; NEDE-24011-P-A-20, December 2013 2.0 Monticello Reload Safety Analysis Report for Cycle 29, ANP-3563P, Revision 2, April 2017 3.0 GE14 Compliance with Amendment 22 of NEDE-24011-P-A (GESTAR II), NEDC-32868P, Revision 5, MFN 13-028, May 2013.

4.0 Deleted.

5.0 Enhanced Option Ill Long Term Stability Solution, ANP-10262PA, Revision 0, May 2008.

6.0 Calculation CA-08-051, Rev 0, Instrument Setpoint Calculation - Rod Block Monitor (RBM) PRNM Setpoints for CL TP and EPU Operation (EC 10856).

7.0 GE BWR Licensing Report, Average Power Range Monitor. Rod Block Monitor.

and Technical Specification Improvement (ARTS) Program for Monticello Nuclear Generation Plant, NEDC-30492-P, Section 4, April 1984.

8.0 Deleted.

9.0 Letter from D. Musolf (NSP) to Director, Office of Nuclear Reactor Regulation, NRC "Revision 1 to License Amendment Request Dated September 7, 1976, Single Loop Operation" dated July 2, 1982.

  • NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 4 of 52

10.0 ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.

11.0 XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.

  • 12.0 XN-NF-84-105(P)(A) Volume 1 and Volume 1Supplements1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.

13.0 EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASM0-4/MICROBURN-B2, Siemens Power Corporation, October 1999.

14.0 XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis, Exxon Nuclear Company, March 1983.

  • 15.0 Reactor Long-Term Stability Solution Option Ill: Licensing Basis Hot Channel Oscillation Magnitude for Monticello Nuclear Generating Plant, GHNE-0000-0073-4167-R2, December 2007.

16.0 Calculation 14-049, Revision 1, Instrument Setpoint Calculation, Average Power Rand Monitor NUMAC PRNM Setpoints - Extended Flow Window Stability (EC18508), March 9, 2017.

17.0 Monticello LOCA MAPLHGR Limits for EPU/EFW with ATRIUM 10XM Fuel and Revised ECCS Parameters, ANP-3558P Revision 0, January 2017.

18.0 Monticello Cycle 29 Fuel Cycle Design, ANP-3521 Revision 0, September 2016.

19.0 Monticello Fuel Transition Cycle 28 Reload Licensing Analysis (EPU/MELLLA),

ANP-3213(P) Revision 1, June 2013.

20.0 Monticello Licensing Analysis For EFW (EPU/MELLLA+), ANP-3295P Revision 3, February 2016.

21.0 Supplemental Reload Licensing Report for Monticello Reload 27 Cycle 28, 002N3952-RO, Revision 0, March 2015.

22.0 Monticello Nuclear Generating Plant Cycle 28 Proprietarv Core Operation Limits Report, NAD-MN-037P, Revision 0, May 2015.

NAD-MN-042NP, Monticello Cycle 29'COLR, Revision 1 Page 5 of 52

3.0 Rod Block Monitor Operability Requirements The Rod Withdrawal Error (RWE) analysis (Reference 2.0) validated that the following MCPR values provide the required margin for full withdrawal of any control rod during Monticello Cycle 29:

Note that the RBM is not credited below 30% power as identified below in Section 4.0.

For Power;;:: 27% and < 90%: MCPR;;:: 2.20 (for TLO)

For Power;;:: 27% and < 90%: MCPR;;:: 2.25 (for SLO)

For Power;;:: 90%: MCPR;;:: 1.83 (for TLO)

When the core power is greater than or equal to 27% and less than 90% of rated in two-loop operation and the MCPR is less than 2.20, then a limiting control rod pattern exists and the Rod Block Monitor is required to be operable.

When the core power is greater than or equal to 27% in single loop operation and the MCPR is less than 2.25, then a limiting control rod pattern exists and the Rod Block Monitor is required to be operable when in two-loop operation.

When the core power is greater than or equal to 90% and the MCPR is less than 1.83, then a limiting control rod pattern exists and the Rod Block Monitor is required to be operable.

Reference:

Technical Specification Table 3.3.2.1-1Function1.

4.0 Rod Block Monitor Upscale Trip Setpoint Technical Specification Trip Setpoints and Allowable Values Function Trip Setpoint Allowable Values Low Power Range - Upscale (a) ~ 121.2/125 of full scale ~ 121.6/125 of full scale Intermediate Power Range - Upscale (b) ~ 116.2/125 of full scale ~ 116.6/125 of full scale High Power Range - Upscale (c), (d) ~ 111.2/125 of full scale ~ 111.6/125 of full scale I

Applicable Thermal Power (a) Thermal Power~ 30% and < 65% RTP and MCPR is below the limit specified in Section 3.0.

(b) Thermal Power~ 65% and < 85% RTP and MCPR is below the limit specified in Section 3.0.

(c) Thermal Power~ 85% and < 90% RTP and MCPR is below the limit specified in Section 3.0.

(d) Thermal Power~ 90% RTP and MCPR is below the limit specified in Section 3.0.

Reference:

Technical Specification Table 3.3.2.1-1 Functions 1.a, 1.b, and 1.c.

The Reference for the "Trip Setpoints" and "Allowable Values" is Reference 6.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 6 of 52 l

5.0 Minimum Critical Power Ratio (MCPR) 5.1 Tech. Spec. Scram Speed (TSSS) .

The Operating Limit Minimum Critical Power Ratio (OLMCPR) for TSSS does not*

account for scram speeds that are faster than those required by Technical Specifications.

5.1.1 TSSS OLMCPR for Two Recirculation Loop Operation The TSSS OLMCPR shall be determined for two recirculation loop operation as follows:

For ATRIUM 10XM fuel:

If core thermal power (P) is ;::: 40% of rated core thermal power, then the TSSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 3} or {MCPR(F) from Figure 7}, where 1.67 is the TSSS OLMCPR at rated (100%) core thermal power reported in Table 2.

i.e. if P ~ 40% rated core thermal power, then TSSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 3} or {MCPR(F) from Figure 7}.

For GE14 fuel:

If core thermal power (P) is ;::: 40% of rated core thermal power, then the TSSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 3} or {MCPR(F) from Figure 7}, where 1.65 is the TSSS OLMCPR at rated (100%) core thermal power reported in Table 2.

i.e. if P ;::: 40% rated core thermal power, then TSSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 3} or {MCPR(F) from Figure 7}.

If core thermal power (P) is < 40% of rated core thermal power, the TSSS OLMCPR for all fuel types is obtained from Figure 3.

Reference:

Technical Specification Section 3.2.2.

5.1.2 TSSS OLMCPR for Single Recirculation Loop Operation The TSSS OLMCPR shall be determined for single recirculation loop operation as follows:

For ATRIUM 10XM fuel:

If core thermal power (P) is ~ 40% of rated core thermal power, then the TSSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 13} or {MCPR(F) from Figure 7}.

i.e. if P ~ 40% rated core thermal power, then TSSS OLMCPR limit

=Maximum of {MCPR(P) from Figure 13} or {MCPR(F) from Figure 7}.

For GE14 fuel:

If core thermal power (P) is ;::: 40% of rated core thermal power, then the TSSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 13} or {MCPR(F) from Figure 7.

NAD-MN-042NP, Monticello Cycle 29 GOLR, Revision 1 Page 7 of52

i.e. if P ~ 40% rated core thermal power, then TSSS OLMCPR limit

=Maximum of {MCPR(P) from Figure 13} or {MCPR(F) from Figure 7}.

If core thermal power (P) is < 40% of rated core thermal power, the TSSS OLMCPR for all fuel types is obtained from Figure 13.

Reference:

Technical Specification Section 3.2.2.

5.2 Nominal Scram Speed (NSS)

The OLMCPR for NSS does take into account the measured scram speeds that are faster than the Technical SpeCification requirements, thus reducing the potential consequences of a limiting transient. The NSS OLMCPR value is determined in a similar manner to the TSSS OLMCPR.

5.2.1 NSS OLMCPR for Two Recirculation Loop Operation The NSS OLMCPR shall be determined for two recirculation loop operation as follows:

For ATRIUM 10XM fuel:

If core thermal power (P) is ~ 40% of rated core thermal power, then the NSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 4 (ES12900 MWd/MTU) or Figure 6 (E > 12900 MWd/MTU)} or {MCPR(F) from Figure 7}.

If more margin is needed and the exposure is between 12900 MWd/MTU and before EOFP, Figure 5 may be used in place of Figure 6.

i.e. if P ~ 40% rated core thermal power and the cycle exposure is s 12900 MWd/MTU, then the NSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 4} or {MCPR(F) from Figure 7}.

and. if P ~ 40% rated core thermal power and the cycle exposure is > 12900 MWd/MTU, then the NSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 6} or {MCPR(F) from Figure 7}.

and. if P ~ 40% rated core thermal power and more MCPR margin is needed and the cycle exposure is> 12900 MWd/MTU but before EOFP, then the NSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 5} or {MCPR(F) from Figure 7}.

For GE14 fuel:

If core thermal power (P) is ~ 40% of rated core thermal power, then the NSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 4 (ES 12900 MWd/MTU) or Figure 6 (E>12900)} or {MCPR(F) from Figure 7}, where the value of the NSS OLMCPR at rated (100%) core thermal power is taken from Table 2 based on the cycle expos1,1re.

  • i.e. if P ~ 40% rated core thermal power and the cycle exposure is s 12900 MWd/MTU, then the NSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 4} or {MCPR(F) from Figure 7}.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 8 of 52

and. if P ~ 40% rated core thermal power and the cycle exposure is> 12900 MWd/MTU, then the NSS OLMCPR limit

=Maximum of {MCPR(P) from Figure 6} or {MCPR(F) from Figure 7}.

If core thermal power (P) is < 40% of rated core thermal power, the NSS OLMCPR for all fuel types is obtained from Figure 3.

Reference:

Technical Specification 3.2.2.

5;2.2 NSS OLMCPR for Single Recirculation Loop Operation The NSS OLMCPR is the same as the TSSS OLMCPR defined above in Section 5.1.2.

Reference:

Technical Specification 3.2.2.

5.3 Technical Specification Scram Time Dependence Technical Specification 3.1.4 and Table 3.1.4-1 provide the scram insertion time versus position requirements for continued operations. Technical Specification Surveillance Requirements SR 3.1.4.1 - SR 3.1.4.4 provide the surveillance requirements for the CRDs. Data from testing of the CRDs, or from an unplanned scram, is summarized in Surveillance Test 0081.

Using this cycle specific information, values of 'tPave can be calculated in accordance with the equation below for each notch position (P =46, 36, 26, and 06).

The Equation (1) used to calculate the average of the current scram times for the cycle is:

N p

p T ave-L' i=l i

(1)

N where:

'tpj = the scram time to notch position P for control rod i from its most recent surveillance test; N= The number of operable control rods (N ~ 121).

P= The notch position (P =46, 36, 26, and 06)

N sum of the most recent scram times for all operable control rods (N) p Ii=l T i= measured to notch position P to comply with the Technical Specification surveillance requirements SR 3.1.4.1, SR 3.1.4.2, SR 3.1.4.3, SR 3.1.4.4.

The average scram time for notch position (P), 'tPave is tested against the Nominal Scram .

Speed for that notch position (NSSP) using the following equation:

p p T ave< NSS (2) where:

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 9 of 52

NSSP is the Nominal Scram Speed for the specified CRD Notch Position (P) from Table 1.

Table 1 NSS Scram Insertion Time to CRD Notch Position Notch Position (P) NSSP (sec) 46 0.304 36 0.820 26 1.355 06 2.477 If the average scram time satisfies the Equation 2 criteria for each notch position, continued plant operation under the NSS operating limit minimum critical power ratio (OLMCPR) for pressurization events is permitted. If the average scram time fails the Equation 2 criteria for any notch position, the TSSS OLMCPR must be used for pressurization events.

No interpolation between NSS and TSSS operating limits is allowed.

Note that TSSS has an OLMCPR applicable to two recirculation loop operation, and an OLMCPR applicable to single recirculation loop operation. The NSS OLMCPR value for single recirculation loop operation is the same as the TSSS OLMCPR value for single recirculation loop operation.

Table 2 Cycle OLMCPR Values I I TSSS I NSS I AREVA AREVA GE14 I GE14 I Range of Applicability 10XM 10XM BOC to 12900 MWd/MTU 1.67 1.65 1.60 1.59 BOC to EOFP 1.67 1.65 1:62 1.60 BOC to Coastdown 1.67 . 1.65 1.63 1.60 All the OLMCPR values reported m Table 2 are for two rec1rculat1on loop operation.

5.4 Pressure Regulator Out 'of Service (PROOS) Operation This section provides power dependent MCPR limits when a backup pressure regulator is not operational (also called PROOS).

A Pressure Regulator Fails Down-Scale (PRFDS) event without backup pressure regulator was evaluated for Monticello (Reference 19.0). This event resulted in a more restrictive Power Dependent MCPR limit than required for normal reduced power operation with both pressure regulators operational. The off-rated flow dependent limits have been generated for Cycle 29 (Reference 2.0). Figure 9 provides the required more restrictive power dependent MCPR ARTS limits for powers less than or equal to 85%.

For powers greater than 85% the power dependent MCPR ARTS limits provided in Figure 3 are still valid. The ARTS limits are described in Reference 7.0. The new Pressure Regulator Out of Service limits are applicable for Cycle 29 (Reference 2.0).

Note that for GE14 fuel with powers below 40% the power dependent MCPR ARTS limits provided in Figure 3 are still valid.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 10 of 52 I

Figure 9 combines the unchanged limits from Figure 3 along with the more restrictive limits determined in Reference 2.0 for PROOS operation. Figure 9 should only be used for operation without a backup pressure regulator. Figure 9 is valid for both TSSS and NSS OLMCPR limits.

An interim MFLCPR Limit is provided in Figure 10. This limit should only be used if the Gardel thermal limit input has not been modified as described in Section 5.4.1 or Section 5.4.2 to account for pressure regulator out of service operation. That is, only Figure 9 or Figure 10 should be used to provide the appropriate PROOS limit. These figures should not be utilized in combination.

5.4.1 OLMCPR for Two Recirculation Loop Operation, WITHOUT A BACKUP PRESSURE REGULATOR.

The TSSS OLMCPR or NSS OLMCPR shall be determined for two recirculation loop operation as follows:

For ATRIUM 1OXM fuel:

If core thermal power (P) is :<: 40% of rated core thermal power, then the TSSS OLMCPR or NSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 9} or {MCPR(F) from Figure 7}.

i.e. if P ;;::: 40% rated core thermal power, then PROOS TSSS/NSS OLMCPR limit

=Maximum of {MCPR(P) from Figure 9} or {MCPR(F) from Figure 7}.

For, GE14 fuel:

If core thermal power (P) is ;;::: 40% of rated core thermal power, then the TSSS OLMCPR or NSS OLMCPR for all fuel types is the greater of {MCPR(P) from Figure 9} or {MCPR(F) from Figure 7.

i.e. if P ;;::: 40% rated core thermal power, then PROOS TSSS/NSS OLMCPR limit

= Maximum of {MCPR(P) from Figure 9} or {MCPR(F) from Figure 7}.

If core thermal power (P) is < 40% of rated core thermal power, the TSSS OLMCPR for all fuel types is obtained from Figure 9.

  • 5.4.2 OLMCPR for Single Recirculation Loop Operation, WITHOUT A BACKUP PRESSURE REGULATOR The TSSS OLMCPR as defined previously for single recirculation loop operation in Section 5.1.2 is the same OLMCPR to be used for single recirculation loop operation for PROOS.

6.0 Power-Flow Map The Power-Flow Operating Map based on analysis to support Cycle 29 is shown in Figure 8. The Power-Flow Operating Map is consistent with a rated power of 2004 MWt as described in Reference 20.0. The Backup Stability Protection (BSP) lines are described in Section 9.0 of this report.

Region I in Figure 8 is the Scram Region and Region II is the Controlled Entry Region .

. These two regions are applicable when the OPRM Upscale Trip is INOPERABLE.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 11of52

7.0 Approved Analytical Methods NEDE-24011-P-A Rev. 20 "General Electric Standard Application for Reactor Fuel (GESTAR)"

NEDE-24011-P-A-US Rev. 20 "General Electric Standard Application for Reactor Fuel (GESTAR) - Supplement for the United States."

XN-NF-81"-58(P)(A) Rev. 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," March 1984 EMF-85-74(P) Rev. 0 Supplement 1(P)(A) and Supplement 2(P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," February 1998 ANF-89-98(P)(A) Rev. 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," May 1995 XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis," March 1983 XN-NF-80-19(P)(A) Volume 4 Rev. 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," June 1986 EMF-2158(P)(A) Rev. 0 "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASM0-4/M ICROBURN-B2," October 1999.

XN-NF-80-19(P)(A) Volume 3 Rev. 2, "Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description," January 1987 XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," February 1987 ANF-913(P)(A) Volume 1 Rev. 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2:

A Computer Program for Boiling Water Reactor *

\ Transient Analyses," August 1990 EMF-2209(P)(A) Rev. 3 "SPCB Critical Power Correlation," September 2009 EMF-2245(P)(A) Rev. 0 "Application of Siemens Power Corporation's Critical Power Correlations to Co-Resident Fuel," August 2000 EMF-2361 (P)(A) Rev. 0 "EXEM BWR-2000 ECCS Evaluation Model," May 2001 EMF-2292(P)(A) Rev. 0 "ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients," September 2000 EMF-CC-074(P)(A) Volume 4 Rev. 0, "BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2," August 2000 BAW-10247P-A Rev. 0 "Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors," February 2008 AN P-10298P-A Rev. 1 "ACE/ATRIUM 10XM Critical Power Correlation," March

. 2014 ANP-10307P-A Rev. 0 "AREVA MCPR Safety Limit Methodology for Boiling Water Reactors," June 2011 BAW-10255P-A Rev. 2 "Cycle-Specific DIVOM Methodology Using the RAMONAS-FA Code," May 2008 ANP-10262PA Rev. 0 "Enhanced Option Ill Long Term Stability Analysis, May 2008 \

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 12 of 52

8.0 Fuel Rod Heat Generation Rate 8.1 Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) as a Function of Exposure The MAPLHGR limits in Table 3 thrm,1gh Table 13 are conservative values bounding all fuel lattice types (all natural uranium lattices are excluded) in a given fuel bundle design, and are intended only for use in hand calculations as described below to establish MAPLHGR limits for Technical Specification 3.2.1. No channel bow effects are included in the bounding MAPLHGR values in these tables as there are no reused channels.

MAPLHGR limits for the ATRIUM 10XM fuel and for each individual GE14 fuel lattice for a given bundle design as a function of axial location and average planar exposure are determined based on the approved methodology referenced in Monticello Technical Specification 5.6.3.b and are loaded into the process computer for use in core monitoring calculations.

When and if hand calculations are required:

8.1.1 Two-Recirculation Loop Operation (MAPLHGR)

At rated core thermal power and core flow conditions, the MAPLHGR value for each fuel bundle design as a function of average planar exposure shall not exceed the bounding limits provided in Table 3 through Table 13.

The MAPLHGR limit for two recirculation loop operation is determined as follows:

For ATRIUM 10XM fuel:

The ATRIUM 1OXM MAPLHGR limits are not adjusted for off-rated core thermal power conditions or for off-rated core fl~w conditions.

A10XM MAPLHGR (TS) Limit= ATRIUM 10XM MAPLHGR from Table 3.

For GE14 fuel:

The GE14 MAPLHGR limit is adjusted for off-rated core flow conditions by determining the following:

GE14 MAPLHGR(P) = MAPFAC(P)

  • MAPLHGR limit from Table 4 through Table 13.

GE14 MAPLHGR(F) = MAPFAC(F)

  • MAPLHGR limit from Table 4 through Table 13.

where MAPFAC(P) and MAPFAC(F) are determined from Figure 14 and Figure 15, respectively, and where Pis the core thermal power in percent of rated and F is the core flow in percent of rated.

Note that the MAPFACs are always::; 1.0, so GE14 MAPLHGR is always less than or equal to the MAPLHGR limit from the table.

GE14 MAPLHGR (TS) Limit= Minimum{ GE14 MAPLHGR(P), GE14 MAPLHGR(F)}

Note that all natural uranium lattices are excluded in Table 3 through Table 13.

Straight line interpolation between nearest data points is permitted only within each individual Table of Table 3 through Table 13.

NAD-MN-04~NP, Monticello Cycle 29 COLR, Revision 1 Page 13 of 52

8.1.2 Single Recirculation Loop Operation (MAPLHGR)

Note that Single Loop Operation is not permitted in the EFW region.

When in single recirculation loop operation, perform the following:

8.1 .2.1 Perform the action specified in Section 8.1.1 above.

8.1.2.2 Separately, apply the single loop operation multiplier to the limiting values of MAPLHGR from Table 3 through Table 13 as follows:

for ATRIUM 10XM: the SLO multiplier is 0.70, and for GE14C: the SLO multiplier is 0.83.

8.1.2.3 Select the more limiting (i.e. smaller) value *from Section 8.1.2.1 or Section 8.1.2.2.

Reference:

Technical Specification 3.2.1.

8.1.3 Pressure Regulator Out of Service (PROOS) Operation MAPLHGR and LHGR limits with Pressure Regulator Out of Service are addressed in Section 8.3.

  • 8.2 Linear Heat Generation Rate (LHGR)

For ATRIUM 10XM fuel, the LHGR limits provided in Table 14 are applic;able to all ATRIUM 10XM fuel in Cycle 29. The LHGR limits are provided as a function of fuel rod peak pellet exposure. The LHGR limits are fuel rod nodal limits, and are to be applied at every node of the fuel rod including the natural uranium lattices.

For GE14 fuel, the uranium dioxide (U0 2 ) and gadolinia LHGR limits provided in Table 15 are applicable to all GE14 fuel lattice types in Cycle 29. The uranium dioxide (U0 2) and gadolinia LHGR limits are provided as a function of fuel rod peak pellet exposure. The gadolinia LHGR limits in Table 15 are conservative values which bound the gadolinia LHGR limits for all the gadolinia concentrations occurring in each of the bundle types used in Cycle 29. The LHGR limits are fuel rod nodal limits, and are to be applied at every node of the fuel rod including the natural uranium lattices.

The individual LHGR limits for the uranium dioxide and gadolinia fuel rods in each fuel bundle type used in Cycle 29, as a function of axial location and pellet exposure are determined based on the approved methodology referenced in Monticello Technical Specification 5.6.3.b and are loaded into the process computer for use in core monitoring calculations.

The LHGR limits are presented in this report for use when and if hand calculations are performed to demonstrate compliance with Technical Specification 3.2.3.

When and if hand calculations are performed:

8.2.1 Two-Recirculation Loop Operation (LHGR)

At rated core thermal power and core flow conditions, the LHGR limit for each fuel bundle design as a function of peak pellet exposure and fuel pin type shall not exceed the bounding limits provided in Table 14 and Table 15.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 14 of 52

!j

The LHGR limit is adjusted for off-rated core thermal power and core flow conditions by determining the following:

For ATRIUM 10XM fuel:

A10XM LHGR(P) = LHGRFAC(P)

  • LHGR limit from Table 14.

A10XM LHGR(F) = LHGRFAC(F)

  • LHGR limit from Table 14.

where the multipliers LHGRFAC(P) and LHGRFAC(F) are determined from Figure 1 and Figure 2, respectively, and where P is the core thermal power in percent of rated, and F is the.core flow in percent of rated.

The Technical Specification (TS) LHGR limit for ATRIUM 10XM fuel is determined as follows:

A10XM LHGR TS Limit= Minimum{ A10XM LHGR(P), A10XM LHGR(F)}

For GE14 fuel:

GE14 LHGR(P) = LHGRFAC(P)

  • LHGR limit from Table 15.

GE14 LHGR(F) = LHGRFAC(F)

  • LHGR limit from Table 15.

where the multipliers LHGRFAC(P) and LHGRFAC(F) are determined from Figure 1 and Figure 2, respectively, and where P is the core thermal power in percent of rated, and F is the core flow in percent of rated.

The Technical Specification (TS) LHGR limit for GE14 fuels determined as follows:

GE14 LHGR TS Limit= Minimum{ GE14 LHGR(P), GE14 LHGR(F)}

Note that the LHGR limits are fuel rod nodal limits, and are to be applied at every node of the fuel rod, including the natural uranium lattices. Straight line interpolation between nearest data points is permitted within Table 14 or within Table 15. For Table 15, interpolation is permitted for U02 or for Gadolinia, but not between U02 and Gadolinia.

8.2.2 Single Recirculation Loop Operation (LHGR)

Note that Single Loop Operation is not permitted in the EFW region.

When in single recirculation loop operation, perform the following:

8.2.2.1 Perform the same action specified in Section 8.2.1 above. There are no separate single loop operation specific multipliers applicable to LHGR, i.e. the multipliers from Section 8.2.1 also apply to single recirculation loop operation.

Reference:

Technical Specification Section 3.2.3.

8.2.3 Pressure Regulator Out of Service (PROOS) Operation MAPLHGR and LHGR limits with Pressure Regulator Out of Service are addressed in Section 8.3.

8.3 Pressure Regulator Out of Service (PROOS) Operation This section provides power dependent MAPLHGR and LHGR limits when a backup pressure regulator is not operational (also called PROOS).

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 15 of 52

The Pressure Regulator Fails Down-Scale (PRFDS) event without backup pressure .

regulator evaluated for Monticello in Reference 19.0 resulted in more restrictive power dependent LHGR limits than required for normal reduced power operation with both pressure regulators operational. When this event was evaluated for Cycle 29 (Reference 2.0), the results showed the LHGR limits with PROOS are more limiting than the base case.

The MAPLHGR and LHGR limits are adjusted for off-rated core thermal power and core flow conditions by determining the following:

For ATRIUM 10XM fuel A10XM LHGR(P) = LHGRFAC(P)

  • LHGR limit from Table 14.

A10XM MAPLHGR (TS) Limit= MAPLHGR from Table 3 (note that there are no power-dependent MAPLHGR limits for ATRIUM 10XM fuel.)

where LHGRFAC(P) is determined from Figure 11 and where P is the core thermal power in percent of rated.

Note that the LHGRFAC(F) value for PROOS is the same as the non-PROOS value determined in Section 8.2.1.

The Technical Specification (TS) MAPLHGR and LHGR limits for ATRIUM 10XM fuel with PROOS are determined as follows:

ATRIUM 10XM MAPLHGR (TS) Limit= MAPLHGR from Table 3 ATRIUM 10XM LHGR (TS) Limit= Minimum{LHGR(P}, LHGR(F)}

For GE14 Fuel:

LHGR(P) = LHGRFAC(P)

  • LHGR limit from Table 15.

MAPLHGR(P) = MAPFAC(P)

  • MAPLHGR limit from Table 4 through Table 13.

where LHGRFAC(P) is determined from Figure 11, MAPFAC(P) is determined from Figure 16 and where P is the core thermal power in percent of rated.

Note that the LHGRFAC(F) value for PROOS is the same as the non-PROOS value determined in Section 8.2.1.

The Technical Specification (TS) MAPLHGR and LHGR limits are GE14 fuel with PROOS are determined as follows:

GE14 MAPLHGR (TS) Limit= Minimum{MAPLHGR(P}, MAPLHGR(F)}

GE14 LHGR (TS) Limit= Minimum{LHGR(P), LHGR(F)}

Figure 12 combines the unchanged limits from Figure 11 along with the more restrictive limits determined in Reference 2.0 for PROOS operation. Figure 12 should only be used for operation without a backup pressure regulator.

Interim MFLPD Limits are provided in Figure 12 to address the more restrictive LHGR Limits identified in the Reference 2.0 analysis. These limits should only be used if the Gardel thermal limit input has not been modified to account for PROOS operation. That is, only Figure 11 or Figure 12 should be used to provide the appropriate PROOS LHGR limit. Figure 11 should not be utilized in combination with Figure 12.

Interim MAPRAT Limits are provided in Figure 17 to address the more restrictive MAPLHGR Limits identified in the Reference 21.0 analysis. These limits should only be used if the Gardel thermal limit input has not been modified to account for PROOS operation. That is, only Figure 16 or Figure 17 should be used to provide. the appropriate PROOS MAPLHGR limit. Figure 16 should not be utilized in combination with Figure 17.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 16 of 52

Table 3 MAPLHGRLimits, ATRIUM 10XM GE 14-P 1ODNAB392-16GZ-1 OOT-145-T6-2931 Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft)11 l< 2l 0.00 ( 0.00) 12.5 20.00 (18.14) 12.5 67.00 (60.78) 7.6 Notes:

1

<l Values in Table 3 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > MAPLHGR Data, Reference 17.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 17 of 52

Table 4 MAPLHGR Limits , GE14C EDB-3375 2

GE14-P10DNAB373-16GZ-100T-145-T6-3375 1 >

Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft) 11 >< 3>

0.00 ( 0.00) 8.31 0.22 ( 0.20) 8.37 1.10 ( 1.00) 8.44

. 2.20 ( 2.00) 8.51 3.31 ( 3.00) 8.58 4.41 ( 4:00) 8.64 5.51 ( 5.00) 8.71 6.6t ( 6.00) 8.78 7.72 ( 7.00) 8.85 8.82 ( 8.00) 8.93 9.92 ( 9.00) 9.03 11.02 (10.00) 9.14 12.13 (11.00) 9.25 13.23 (12.00) 9.33 14.33 (13.00) 9.41 15.43 (14.00) 9.48 16.53 (15.00) 9.54 17.64 (16.00) 9.60 18.74 (17.00) 9.64 19.84 (18.00) 9.68 20.94 (19.00) 9.64 22.05 (20.00) 9.60 23.15 (21.00) 9.56 24.25 (22.00) 9.51 25.35 (23.00) 9.46 26.46 (24.00) 9.41 27.56 (25.00) 9.36 33.07 (30.00) 9.12 38.58 (35.00) 8.90 38.85 (35.24) 8.87 44.09 (40.00) 8.38 49.60 (45.00) 7.84 55.12 (50.00) 6.89 55.50 (50.35) 6.77 60.63 (55.00) 5.22 61.77 (56.04) 4.86 61.83 (56.09) 4.86 63.07 (57.22) 4.85 63.11 (57.25) 4.84 Notes:

1

<> Values in Table 4 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 121 Engineering Data Bank (EDS) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 18 of 52

Table 5 MAPLHGR Limits, GE14C EDB-3377 2

GE14-P10DNAB391-15GZ-100T-145-T6-3377 < >

Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft)<1>< 3 >

0.00 0.00). 8.39 0.22 0.20) 8.44 1.10 1.00) 8.53 2.20 2.00) 8.66 3.31 3.00) 8.81 4.41 4.00) 8.91 5.51 ( 5.00) 9.00 6.61 ( 6.00) 9.09 7.72 ( 7.00) 9.19 8.82 ( 8.00) 9.28 9.92 ( 9.00) 9.38 11.02 10.00) 9.46 12.13 11.00) 9.56 13.23 12.00) 9.63 14.33 13.00) 9.70 15.43 14. 00) 9.78 16.53 15.00) 9.85 17.64 16.00) 9.91 18.74 17.00) 9.96 19.84 18.00) 10.00 20.94 19.00) 9.96 22.05 20.00) 9.89 23.15 21.00) 9.83 24.25 22.00) 9.77 25.35 23.00) 9.71 26.46 (24.00) 9.65 27.56 (25.00) 9.59 33.07 30.00) 9.33 38.58 35.00) 9.12 38.85 35.24) 9.10 44.09 40.00) 8.70 49.60 45.00) 8.16 55.12 50.00) 7.26 55.50 50.35) 7.15 60.63 55.00) 5.77 63.41 57.53) 4.88 63.42 57.53) 4.88 63.50 57.61) 4.88 63.99 (58.05) 4.88 64.04 58.09) 4.87 Notes:

1

<> Values in Table 5 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDS) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 19 of 52

Table 6 MAPLHGR Limits, GE14C EDB-4175 GE14-P1 ODNAB372-17GZ-1 OOT-145-T6-4175 12 >

Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft) 11 ll 3 >

0.00 (0.00) 8.34 0.22 (0.20} 8.38 1.10 (1.00} 8.45 2.20 (2.00} 8.54 3.31 (3.00) 8.65 4.41 (4.00) 8.76 5.51 (5.00) 8.87 6.61 (6.00) 8.99 7.72 (7.00) 9.12 8.82 (8.00) 9.25 9.92 (9.00) . 9.39 11.02 (10.00) 9.51 12.13 (11.00) 9.63 13.23 (12.00) 9.70 14.33 (13.00) ~

9.75 15.43 (14.00) 9.81 16.53 (15.00) 9.88 17.64 (16.00) 9.83 18.74 (17.00) 9.78 19.84 (18.00) 9.74 20.94 (19.00) 9.71 22.05 (20.00) 9.66 23.15 (21.00) 9.61 25.35 (23.00) 9.50 26.46 (24.00) 9.45 27.56 (25.00) 9.41 33.07 (30.00) 9.19 38.58 (35.00) 9.01 38.85 (35.24) 8.99 44.09 (40.00) 8.54 49.60 (45.00) 8.04 55.12 (50.00) 7.19 55.50 (50.35) 7.09 60.63 (55.00) 5.77 63.44 (57.55) 4.88 63.50 (57.61) 4.88 63.70 (57.79) 4.87 64.88 (58.86) 4.87 65.11 (59.07) 4.87 Notes: _

11

> Values in Table 6 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDB) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 20 of52

Table 7 MAPLHGR Limits, GE14C EDB-4176 GE 14-P 1ODNAB386-16GZ-1 OOT-145-T6-4176 <21 Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft) 11 >< 3 >

0.00 0.00) 8.48 0.22 0.20) 8.52 1.10 1.00) 8.58 2.20 2.00) 8.66 3.31 3.00) 8.74 4.41 4.00) 8.82 5.51 5.00) 8.90 6.61 6.00) 8.98 7.72 7.00) 9.06 8.82 8.00) 9.15 9.92 9.00) 9.24 11.02 10.00 9.33 12.13 11.00 9.43 13.23 12.00 9.48 14.33 13.00 9.54 15.43 14.00 9.61 16.53 15.00 9.68 17.64 16.00 9.75 18.74 17.00 9.81 19.84 18.00 9.86 20.94 19.00 9.89 22.05 20.00 9.88 23.15 21.00 9.84 24.25 22.00) 9.78 25.35 23.00) 9.73 26.46 (24.00) 9.68 27.56 25.00 9.63 33.07 30.00 9.39 38.58 35.00. 9.14 38.85 35.24 9.12

. 44.09 40.00 8.69 49.60 45.00 8.12 55.12 50.00 7.22 55.50 50.35 7.11 60.63 55.00 5.62 62.89 57.06 4.89 63.16 57.30 4.89 63.50 57.61 4.89 64.67 58.67 4.89 65.28 59.23 4.89 Notes:

1

<> Values in Table 7 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDB) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

N,AD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 21of52

Table 8 MAPLHGR Limits, GE14C EDB-4177 GE 14-P 1ODNAB386-16GZ-1 OOT-145-T6-4177 121 Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft) 11 >< 3>

0.00 0.00) 8.50 0.22 0.20) 8.54 1.10 1.00) 8.60 2.20 2.00) 8.68 3.31 3.00) 8.76 4.41 4.00) 8.84 5.51 5.00) 8.93 6.61 6.00) 9.02 7.72 7.00) 9.11 8.82 8.00) 9.20 9.92 9.00) 9.30 11.02 10.00 9.39 12.13 11.00 9.48 13.23 12.00 9.54 14.33 13.00 9.59 15.43 14.00 9.64 16.53 15.00 9.70 17.64 16.00 9.76 18.74 17.00 9.82 19.84 18.00 9.86 20.94 19.00 9.89 22.05 20.00 9.84 23.15 21.00 9.79 24.25 22.00 9.75 25.35 23.00 9.70 26.46 24. 00) 9.66 27.56 25.00) 9.62 33.07 30.00 9.39 38.58 35.00 9.14 38.85 35.24 9.12 44.09 40.00 8.69 49.60 45.00 8.12 55.12 50.00 7.23 55.50 50.35 7.12 60.63 (55.00 5.65 63.02 (57.17) 4.88 63.12 57.26) 4.88 63.50 (57.61) 4.88 64.64 58.64 4.88 65.26 59.20 4.88 Notes:

1

<> Values in Table Bare for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDB) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1

  • Page 22 of 52

Table 9 MAPLHGR Limits, GE14C EDB-4178

. GE14-P10DNAB389-11GZ-100T-145-T6-4178 121 Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft) 11 H3 l 0.00 (0.00) 8;94 0.22 (0.20) 9.01 1.10 (1.00) 9.09 2.20 (2.00) 9.15 3.31 (3.00) 9.21 4.41 (4.00) 9.28 5.51 (5.00) 9.35 6.61 (6.00) 9.41 7.72 (7.00) 9.49 8.82 (8.00) 9.56 9.92 (9.00) 9.64 11.02 (10.00) 9.71 12.13 (11.00) 9.79 13.23 (12.00) 9.86 14.33 (13.00) 9.88 15.43 (14.00) 9.90 16.53 (15.00) 9.92 17.64 (16.00) 9.94 18.74 (17.00) 9.96 19.84 (18.00) 9.96 20.94 (19.00) 9.97 22.05 (20.00) 9.94 23.15 (21.00) 9.89 24.25 (22.00) 9.84 25.35 (23.00) 9.79 26.46 (24.00) 9.73 27.56 (25.00) 9.68 33.07 (30.00) 9.43 38.58 (35.00) 9.16 38.85 (35.24) 9.14 44.09 (40.00) 8.71 49.60 (45.00) 8.12 55.12 (50.00) 7.32 55.50 (50.35) 7.21 60.63 (55.00) 5.84 63.50 (57.61) 4.91 63.61 (57.71) 4.88 63.63 (57.72) 4.88 65.22 (59.17) 4.88 65.83 (59.72) 4.86 Notes:

1

<> Values in Taple 9.are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDS) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 23 of 52 L

Table 10 MAPLHGR Limits, GE14C EDB-4332 GE14-P1 ODNAB374-16GZ-1 OOT-145-T6-4332 <2l Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft)!1l!3l 0.00 (0.00) 8.19

  • 0.22 (0.20) 8.23 1.10(1.00) 8.31 2.20 (2.00) 8.42 3.31 (3.00) 8.54 4.41 (4.00) 8.66 5:51 (5.00) 8.79 6.61 (6.00) 8.92 7.72 (7.00) 9.06 8.82 (8.00) 9.21 9.92 (9.00) 9.35 11.02 (10.00) 9.50 12.13 (11.00) 9.59 13.23 (12.00) 9.37 14.33 (13.00) 9.26 15.43 (14.00) 9.28 16.53 (15.00) 9.28 17.64 (16.00) 9.28 18.74 (17.00) 9.26 19.84 (18.00) 9.23 20.94 (19.00) 9.19 22.05, (20.00) 9.15 23.15 (21.00) 9.11

. 24.25 (22.00) 9.07 26.46 (24.00) 9.00 27.56 (25.00) 8.96 33.07 (30.00) 8.81 38.58 (35.00) 8.57 38.85 (35.24) 8.55 44.09 (40.00) 8.11 49.60 (45.00) 7.57 55.12 (50.00) 6.58 55.50 (50.35) 6.47 60.63 (55.00) 5.03 61.91 (56.16) 4.64 62.57 (56.76) 4.64 63.37 (57.49) 4.64 63.50 (57.60) 4.64 Notes:

1

( ) Values in Table 1O are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDB) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 24 of 52

Table 11 MAPLHGR Limits, GE14C EDB-4333 2

GE14-P10DNAB384-15GZ-100T-145-T6-4333 <>

Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/tt)<1l<3l 0.00 0.00 8.51 0.22 0.20 8.55 1.10 1.00 8.62 2.20 2.00) 8.72 3.31 3.00) 8.82 4.41 (4.00) 8.93 5.51 5.00) 9.05 6.61 6.00) 9.17 7.72 7.00) 9.30 8.82 8.00 9.43 9.92 9.00 9.56 11.02 10.00 9.70 12.13 11.00 9.80 13.23 12.00 9.69 14.33 13.00 9.49 15.43 14.00 9.45 16.53 15.00 '

9.45 17.64 16.00 9.43 18.74 17.00) 9.41 19.84 18.00) 9.38 20.94 19.00 9.34 22.05 20.00 9.29 23.15 21.00 9.25 24.25 22.00 9.21 25.35 23.00) 9.17 26.46 (24.00 9.13 27.56 (25.00 9.09 33.07 30.00 8.92 38.58 35.00 8.71 38.85 35.24 8.69 44.09 40.00 8.24 49.60 45.00) 7.75 55.12 50.00 6.76 55.50 50.35 6.66 60.63 55.00 5.30 62.78 56.95 4.65 63.23 57.36 4.65 63.30 57.43 4.65 63.44 57.56 4.65 Notes:

1

<> Values in Table 11 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDB) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 25 of 52

Table 12 MAPLHGR Limits, GE14C EDB-4337 GE14~P10DNAB387-16GZ-100T-145-T6-4337 12>

Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/ft)(1>(3 >

0.00 0.00) 8.42 0.22 0.20) 8.46 1.10 1.00) 8.54 2.20 2.00) 8.64 3.31 3.00) 8.74 4.41 4.00) 8.85 5.51 5.00) 8.96 6.61 6.00) 9.07 7.72 7.00) 9.19 8.82 8.00) 9.30 9.92 9.00) 9.43 11.02 10.00) 9.55 12.13 11.00) 9.68 r 13.23 12.00) 9.63 14.33 13.00) 9.46 15.43 14.00) 9.45 16.53 15.00) 9.47 17.64 16.00) 9.47 18.74 17.00) 9.45 19.84 18.00) 9.42 20.94 19.00) 9.38 22.05 20.00) 9.33 23.15 21.00) 9.29 24.25 22.00) 9.25 25.35 23.00) 9.21 26.46 24.00) 9.17 27.56 25.00) 9.13 33.07 30.00) 8.95 38.58 35.00) 8.74 38.85 (35.24) 8.72 44.09 40.00) 8.26 49.60 (45.00) 7.78 55.12 50.00) 6.79 55.50 50.35) 6.68 60.63 55.00) 5.34 62.91 57.07) 4.65 63.50 57.61) 4.65 63.58 57.68) 4.65 64.28 58.31) 4.65 64.34 58.37) 4.65 ~

~~:

1

<> Values in Table 12 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

<> Engineering Data Bank (EDS) number, Reference 21.0.

3

<> MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 26 of 52

Table 13 MAPLHGR Limits, GE14C EDB-4338 2

GE14-P10DNAB389-11GZ-100T-145-T6-4338 <>

Average Planar Exposure MAPLHGR Limit GWD/MTU (GWD/STU) (kW/tt)<1><3>

0.00 0.00) 8.77 0.22 0.20) 8.82 1.10 1.00) 8.90 2.20 2.00) 9.02 3.31 3.00) 9.12 4.41 4.00) 9.20 5.51 5.00) 9.28 6.61 6.00) 9.35 7.72 7.00) 9.43 8.82 8.00) 9.51 9.92 9.00) 9.60 11.02 10.00) 9.68 12.13 11.00) 9.76 13.23. 12.00) 9.81 14.33 13.00) 9.84 15.43 (14.00) 9.87 16.53 15.00) 9.89 17.64 16.00) 9.91 18.74 17.00) 9.93 19.84 18.00) 9.94 20.94 19.00) 9.94 22.05 20.00) 9.94 23.15 (21.00) 9.94 25.35 (23.00) 9.93 26.46 (24.00) 9.90 27.56 (25.00) 9.83 33.07 30.00) 9.52 38.58 35.00) 9.27 38.85 35.24) 9.25 44.09 40.00) 8.79 49.60 (45.00) 8.26 55.12 50.00) 7.33 55.50 50.35) 7.22 60.63 55.00) 5.79 63.46 57.57) 4.88 63.46 57.57) 4.88 63.50 57.61) 4.88 65.25 59.20) 4.88 65.61 59.52) 4.88 Notes:

1

<> Values in Table 13 are for two recirculation loop operation, see Section 8.1.1.

For single loop operation, see Section 8.1.2 2

< > Engineering Data Bank (EDB) number, Reference 21.0.

3

< > MAPLHGR Data, Reference 21.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 27 of 52

Table 14 ATRIUM 10XM Steady-State LHGR Limits Peak Pellet Exposure LHGR Limit {a)(bl GWD/MTU (GWD/STU) (kW/ft) 0.0 (0.0) 14.1 18.9 (17.15) 14.1 74.4 (67.49) 7.4 Notes:

<a> Applicable multipliers per Section 8.2 will be applied to the data in this table for two recirculation loop and single recirculation loop operations.

<h> LHGR Data from Table 8.8 in Reference 2.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 28 of 52

Table 15 GE14 U02/Gd Thermal Mechanical LHGR Limits Most Limiting Gadolinia Peak Pellet Exposure U02 LHGR Limit Ca)(bJ!cJ Peak Pellet Exposure LHGR Limit caJ!bJ!cJ GWD/MTU (GWD/STU) (kW/ft) GWD/MTU (GWD/STU) (kW/ft)

((

))

Notes:

<a> Applicable multipliers per Section 8.2 will be applied to the data in this table for two recirculation loop and single recirculation loop operations.

!bl These bounding Thermal Mechanical LHGR Limits may be used with every EDB type loaded in Cycle 29. *

(c) LHGR Data, Reference 22.0.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 29 of 52

9.0 Core Stability Requirements 9.1 Stability E0-111 Solution Monticello has implemented the AREVA Enhance Option Ill (E0-111) Long Term Stability solution using the Oscillation Power Range Monitor (OPRM) as described in Reference 5.0. Plant-specific Hot Channel Oscillation Magnitude (HCOM) (Reference 15.0) and other cycle specific stability parameters are used in the Cycle 29 E0-111 Stability Evaluation, which is documented in Reference 2.0. A Backup Stability Protection (BSP) evaluation is also documented in Reference 2.0.

The following Enhanced Option Ill OPRM stability setpoint determination, the implementation of the associated BSP Regions shown in Figure 8, and the Extended Flow Window Stability- High rod block and scram describe the stability licensing basis protections for Monticello Cycle 29.

Reference:

Technical Specification 3.3.1.1 9.2 Enhanced Option Ill OPRM Setpoints A reload Enhanced Option Ill evaluation has been performed in accordance with the licensing methodology described in Reference 5.0. The stability based Operating Limit Minimum Critical Power Ratio (OLM9PR) is determined for two conditions as a function of OPRM amplitude setpoint. The two conditions evaluated are: (1) a postulated oscillation at 45% rated core flow quasi steady-state operation (SS), and (2) a postulated oscillation following a two recirculation pump trip (2RPT) from the limiting rated power operating state point.

The OPRM-setpoint-dependent OLMCPR(SS) and OLMCPR(2RPT) values are calculated for Cycle 29 in accordance with the Enhanced Option Ill guidelines described in Reference 5.0. The Cycle 29 Enhanced Option Ill evaluation provides adequate protection against violation of the Safety Limit MCPR (SLMCPR) for the two postulated reactor instability events as long as the plant OLMCPR is equal to or greater than the OLMCPR(SS) and OLMCPR(2RPT) for the selected OPRM setpoint in Table 16.

The relationship between the OPRM Successive Confirmation Count Setpoint and the OPRM Amplitude Setpoint is provided in Table 17.

The OPRM setpoints for Two Loop Operation (TLO) are conservative relative to Single Loop Operation (SLO) and are, therefore, bounding.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 30 of 52

Table 16 OPRM Setpoint Versus OLMCPR OPRM Amplitude OLMCPR(SS) OLMCPR(2PT)

Setpoint 1.05 1.32 1.40 1.06 1.35 1.43 1.07 1.38 1.46 1.08 1.41 1.49.

1.09 1.44 1.52 1.10 1.47 1.55 1.11 1.52 1.60 1.12 1.57 1.66 1.13 1.62 1.72 1.14 1.68 1.78 1.15 - 1.75 1.85 Rated Power OLM CPR Off-Rated OLMCPRas Acceptance OLMCPRat Described in Criteria 45% Flow Section 5.0 Table 17 Relationship Between OPRM Successive Confirmation Count Setpoint and OPRM Amplitude Setpoint Successive OPRM Confirmation Amplitude Count Setpoint Setpoint 6  ;;:: 1.04 8  ;;:: 1.05 9  ;;:: 1.06 10  ;;:: 1.07 11  ;;:: 1.08 12  ;;:: 1.09 13  ;;:: 1.10 14  ;;:: 1.11 15  ;;:: 1.13 16  ;;:: 1.14 17  ;;:: 1.16 18  ;;:: 1.19 19  ;;:: 1.21 20  ;;:: 1.24 NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 31of52

The OPRM Period Based Detection Algorithm (PBDA) instrumentation setpoints for use in Technical Specification LCO 3.3.1.1 Table 3.3.1 :1-1 Function 2f shall not exceed the following:

Confirmation Count Setpoint: 13 Amplitude Setpoint: 1.10

Reference:

Technical Specification 3.3.1.1 9.3 Extended Flow.Window Stability- High Scram Reference 5.0 describes the single channel instability exclusion and backup stability protection provided by the Extended Flow Window Stability (EFWS) scram. The EFWS APRM setpoints from Reference Error! Reference source not found. are confirmed for Cycle 29 and defined in Table 18.

Table 18 EFWS Nominal Setpoints for the Scram Region Parameter Allowable Value NTSP Slope of EFWS APRM flow-2.49 2.49 biased trip linear segment.

Constant Power Line for Trip from zero Drive Flow to Flow 40.6 % RTP* 38.6 % RTP*

Breakpoint value.

Constant Flow Line for Trip. 48.1 % RDF** 49.1 % RDF**

Flow Breakpoint value 30.3 % RDF** 31.3 % RDF**

Notes:

  • RTP - Rated Thermal Power
    • RDF - Recirculation Drive Flow

Reference:

Technical Specification 3.3.1.1 9.4 Backup Stability Protection Regions The Backup Stability Protection (BSP) regions are shown in Figure 8. The BSP regions are an integral part of the Tech Spec-required alternative method to detect and suppress thermal hydraulic instability oscillations in that they identify areas of the power/flow map where there is an increased probability that the reactor core could experience a thermal hydraulic instability.

Regions are identified that are either excluded from planned entry and continued operation (Scram Region), or where planned entry is not permitted unless specific operating restrictions are met and specific actions are required to be taken to immediately leave the region following inadvertent or forced entry (Controlled Entry Region). The '

boundaries of these regions are established on a cycle-specific basis based upon core decay ratio calculations performed using NRG-approved methodology (Reference 2.0).

The BSP regions are only applicable when the Upscale Trip function of the OPRM is inoperable. However, immediate action is required to leave Region I even if the OPRMs are operable. The BSP region boundaries were calculated for Monticello Cycle 29 for NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 32 of 52

nominal feedwater temperature conditions. The endpoints of the regions are defined in Table 19. The region boundaries shown .in Figure 8 are defined using the Generic Shape Function (GSF), which is described in Reference 5.0.

Table 19 BSP Endpoints for Normal Feedwater Temperature Endpoint Power(%) Flow(%) Definition Scram Region Boundary, A1 56.5 40.0 HFCL Scram Region Boundary, B1 42.5 33.7 NCL Controlled E:ntry Region A2 64.4 50.0 Boundary, HFCL Controlled Entry Region B2 28.5 31.2 Boundary, NCL Note:

BSP Endpoints, Reference 2.0.

Reference:

Technical Specification 3.3.1.1 9.5 Actions For Entry Into Scram Region Immediate manual scram upon determination that the region has been entered. If entry is unavoidable, early scram initiation is appropriate.

Reference:

Technical Specification 3.3.1.1 9.6 Actions For Entry Into Controlled Entry Region If entry is inadvertent or forced, immediate exit from region is required. The region can be exited by control rod insertion or core flow increase. Increasing the core flow by restarting an idle recirculation pump is not an acceptable method of exiting the region.

Deliberate entry into the Controlled Entry Region requires compliance with at least one of the stability controls outlined below:

1. Maintain core average boiling boundary (BB)~ 4.0 feet.
2. Maintain core decay ratio (DR) < 0.6 as calculated by an on-line stability monitor.
3. Continuous dedicated monitoring of real time control room neutron monitoring instrumentation with manual scram required upon indication of a reactor instability induced power oscillation.

Caution is required whenever operating near the Controlled Entry Region boundary (i.e., within approximately 10% of core power or core flow), and it is recommended that the amount of time spent operating near this region be minimized.

Reference:

Technical Specification 3.3.1.1 NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 33 of 52

10.0 Turbine Bypass System Response Time The TURBINE BYPASS SYSTEM RESPONSE TIME shall be that time interval from when the main turbine trip solenoid is activated until 80% of the turbine bypass capacity is established. The TURBINE BYPASS SYSTEM RESPONSE TIME shall bes 1.1 seconds.

Reference:

Technical Specification 1.1, Surveillance Requirement 3.7.7.3.

11.0 Shutdown Margin (SOM) Confirmation Technical Specification 3.1.1 requires that the SDM be confirmed for Monticello Cycle 29.

Analytical SDM has been confirmed in the Reload Safety Analysis Report (Reference 18.0, Table 2.1 ).

For any mid-cycle core loading changes, the analytical SDM will be re-confirmed, formally documented, and reviewed prior to start-up.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 34 of 52

12.0 APRM Simulated Thermal Power - High, Del~a W Allowable Value The APRM Simulated Thermal Power - High Flow Biased Scram Setpoint Allowable Value shall be:

For Two Loop Operation (TLO):

SsrP S (0.610N) + 67.2%RTP) and S 116%RTP where:

SsrP = Scram setting in percent of rated thermal power (2004 MWt)

W = Loop recirculation flow rate in percent of rated For Single Loop Operation (SLO):

(NOTE: SLO is not permitted in the MELLLA+ region.)

SsrP S (0.55(W-t..W) + 61.5%RTP) where:

SsrP = Scram setting in percent of rated thermal power (2004 MWt)

W= Loop recirculation flow rate in percent of rated t..W = Difference between two-loop and single-loop effective recirculation

=

flow at the same core flow (t..W 5.4% for single loop operation, t..W =

0.0 for two-loop operation)

Reference:

Technical Specification 5.6.3, item 5, Technical Specification Table 3.3.1.1-1, Function 2.b, footnote (b), and Reference 9.0 NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 35 of 52

Figure 1 Power Dependent LHGR Multipliers 1.10 ',

1.00 ,,,_,,,_

~

0.90 ATRIUM 10XM _,,,,,,. ~ ~ _, ,,

~ ,,,-

~ ,,,

~

__,,,,,.,,- ~ _,, ,,

t>'

0.80

~

~

, ... ,. ,, GE14

--if

a. 0.70 0

.:S 50% flow, ATRIUM 1OXM * - LHGRp=LHGRFACp*LHGR

~ , ,,,

'\ ,., ,,,,

(!) 0.60 For P < 25%: No Thermal Limits Required

c

...J

./ ATRIUM 10XM For 25% .:s P < 40%, >50% Flow 0.50 / ~

  • LHGRFACp=0.00933P+0.14680 For 25% .:s P < 40%, .:s 50% Flow 0.40

/

~~

,/

v ~~ ....

> 50%flow, ATRIUM 10XM

-'i GE14 LHGRFACp=0.01067P+0.17320 For40%~ P < 100%

LHGRFACp=0.00400P+0.60000 For 25% ~ P < 40%, >50% Flow K""

0.30

'-\ ~ 50% flow, GE14 I *

> 50% flow, GE14 I

LHGRFACp=0.00467P+0.22320 For 25% ~ P < 40%, .=. 50% Flow LHGRFACp=0.01067P+0.10320 For40%.:S P < 100%

I / LHGRFACp=0.00650P+o.31000 I

0.20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER {% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 36 of 52

Figure 2 Flow Dependent LHGR Multipliers 1.10 1.00 1--------*~------.

0.90 ATRIUM10XM 0,,. /,/

/

/

u.

0.80

/,

GE14.

(.')

~

0:::

V,,/ ,

(!)

c

...J 0.70 /.

/ ,,,-

LHt 13R(F) = LHGRFAC(F)* LHGR 0:::

0 I-(.') __/ ,', , ATKIUM 10XM Fo~ 30% ~ F < 34.2%

~ 0.60

, HGRFAC(F)=0.627

~ ,,,' For 34.2%~ F < 80%

HGRFAC(F)=0.00814F+0.34880 0 For 80%~ F~ 107%

...J ---~

u. LHGRFACp=1.0 0:::

(!)

0.50 GE1~

c Fo~ 30% ~ F < 34.2%

...J

  • rGRFACp=0.557 Fo 34.2% < F < 78.65%

HGRFAC(F)=0.00976F+0.22318 Fo178.65% < F ~ 99%

0.40 LHGRFACp=0.9908 For99%< F~ 107%

LHGRFACp=1.0 0.30 30.0 40.0 50.0 60.0 l I 70.0 80.0 I

90.0 I

100.0 110.0 Core [low (% Rated)

In addition to the flow dependent multipliers, Monticello also requires an ECCS MAPLHGR multiplier of 0.9908 for operation at or below 99% core flow for GE14 fuel. This ml!lltiplier ensures that the off-rated limits assumed in the 1

EPU ECCS-LOCA analyses bound the cycle-specific off-rted limits calculated for MELLLA+ (EFW) operation.

Results from the equations above are accurate to three decimal places.

NAD-MN--042NP, Monticello Cycle 29 COLR, Revlslol 1 Page 37 of 52

_J

Figure 3 Power Dependent MCPR(P) Limits for TSSS Insertion Rates 4.00 ,...--.----,----.,...---r----;--;---,---,------------------,

MCPR(P} at TSSS For P < 25%: No Thermal Limits Required ATRIUM 10XM For 25%.::: P < 40%, >50% Flow 3.50 -J---+----+----j~-+---+---+----+----< MCPR(P}=-0.03467P+4.1968 For 25%.::: P < 40%,.::: 50% Flow

> 50% flow, ATRI IUM 101XM I MCPR(P)=-0.04933P+4.3932 For40%.::: P < 100%

MCPR(P)=-0.00300P+1.9700 14

'\ . . . (',_ > 50% flow, GE14 GE

\...~~-+-__,,.-_,.............~--,-....

3.00 -+-___,,, / - + - - - + - - - + - - - - - + - - - 1 For 25%.::: P < 40%, >50% Flow

'~ .. v MCPR(P)=-0.03933P+4.3032

" \ ' For 25%.::: P < 40%,.::: 50% Flow

" ' MCPR(P)=-0.05133P+4.4132

', '* For40%.:::P< 100%

', .::: 50%flow, ATRIUM 10XM MCPR(P)=-0.00317P+1.9670 2.50

  • ~r

+---+----+-.~.,-f----+----+----1r---+--t

/'\"

/ \

.::: 50% flow, GE14 2.00 +---+----+-----ilr---+---+---+----+---+--+---+---+----+--t---+--~

-- -- - *---- ATRIUM 10XM

,_--~---

GE14 1.50 -l--------1------1----11-----1-----+----l------1----1---1------+----I---+--+---+--~

1.00 +--+---+---1'---+--+---i,---+---+--+---+---+---+---i--+------l 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 38 of 52

Figure 4 Power Dependent MCPR(P) Limits for NSS - BOC to 12.9 GWd/MTU 4.00 -r-r--r---i:---r----r--,---ni=====i=======i========================================ii MCPR(P)at NSS- BOC to 12.9GWd/MTU I I For P < 25%: No Thermal Limits Required ATRIUM 10XM For 25% ~ P < 40%, >50% Flow 3.50 + - - - t - - - + - - - l rI- - - - + - - - + - - f - - - - H I MCPR(P)=-0.03467P+4.1968 For 25% ~ P < 40%, ~ 50% Flow

~ > 50% flow, ATRIUM 10XM MCPR(P)=-0.04933P+4.3932

,*-( LO%LGL z~~~~~~~83P+l.8830 3 .oo ..

-----~~--t\-~,.,.,,_, ~-,-.-ll--r----r----t--r---tt For 25% ~ P < 40%, >50% Flow

...,~ MCPR(P)=-0.03933P+4.3032

'* For 25% ~ P < 40%, ~ 50% Flow

, ~ _:: _ 50% flow, ATRIUM 10XM MCPR(P)=-0.05133P+4.4132

',~v For 40% ~ p* < 100%

2.50 +---+----1--'~__.._--1---1----l----+1 MCPR( P)=-0.00267P+1.857

~'~

/ '

_:::_50%flow, GE14 ATRIUM 10XM

-- ~-~ -----

GE14

- - - - ~ ---

1.50 +---+---+----+----+---+--f---+---+---+---+---+---+--f---+-----+

1.00 +---t---+---+---+---+----i,__-+---+---+---+---+----+----i,__-+-----l 25 30 35 40 45 50 55 60 65 70. 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 39 of 52

Figure 5 Power Dependent MCPR(P) Limits for NSS - BOC to EOFP 4.00 ,---,---,----,.--,----r--r--r==============='"""iil MCPR(P) at NSS - BOC to EOFP I For P < 25%: No Thermal Limits Required ATRIUM 10XM I For 25% S P < 40%, >50% Flow 3.50 + - - - - + - - - - + - - _ . _ - - + - - - + - - - - + - - - - - 0 MCPR( P)=-0.03467P+4.1968 For 25% s P < 40%, S 50% Flow

~*.,~ > 50%flow, A;TRIUMI 10XMI MCPR(P)=-0.04933P+4.3932

[ -,, For40%S P<100%

~ MCPR(P)=-0.00267P+l.8870

'\._ ', > 50% flow, GE14 GE14 3.00 -+-~-~.~-+--,"""'*..-~--l/--r----+---+---tr-------i For 25% s P < 40%, >50% Flow

"\i',~ MCPR(P)=-0.03933P+4.3032 a..

~

a..

\.

  • ,~v

', ~~ 50% flow, ATRIUM 10XM For 25% s P < 40%, S 50% Flow MCPR{P)=-0.05133P+4.4132 For40%sP<100%

2.50 +----+----+-'~----+---+-----1-----.11 MCPR(P}=-0.00250P+1.8500 u

2: ~'~

/ '

~ 50% flow, GE14 2.00 +---+---+---+---+---+---l---~===!'====='41=1=1~

ATRIUM 10XM I""'--------- ---**--- __ _____ ... ,__

- - . . . i...


~---

GE14 1.50 +---+---+---------+---+--t---+--+---+---+----+--+---tt---+------i 1.00 -+---+---+----t----+--+---t--+----+---+---+---+-----+---t--t------i 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 40 of 52

Figure 6 Power Dependent MCPR(P) Limits for NSS - BOC to Coastdown 4.00 ,---,------,----,.-----,---,----r---1F"==================================1 MCPR(P) at NSS - BOC to Coastdown For P < 25%: No Thermal Limits Required ATRIUM lOXM For 25% .:S P < 40%, >50% Flow 3.50 +---+---+----l~-+---+---+----H MCPR(P}=-0.03467P+4.1968 For 25% .:S P < 40%, .5 50% Flow

~*.,..., > 50%flow, A;TRIUMI 10XMI MCPR(P)=-0.04933P+4.3932 l -,( For40%,5 P<100%

~ MCPR(P}=-0.00250P+l.8800

'~ ',_ > 50% flow, GE14 GE14 3 .oo -t-~~---1"f----'1*.-3,~~-----.Vi----r-+-----r---+----ff For 25%.:::: P < 40%, >50% Flow

\¥v I~ MCPR(P}=-0.03933P+4.3032

'* For 25%.:::: P < 40%,.:::: 50% Flow

, ~ ~ 50% flow, ATRIUM 10XM MCPR(P)=-0.05133P+4.4132 For40%.:SP<l00%

2.50 +---+---+-'~----+---+---+------41 MCPR(P)=-0.00250P+l.8500 vi'~

~

/

50%flow, GE14 ATRIUM 10XM ii----------* - ..... 1-aa-.-i--- . . . - - - .. - - -

r-----...... . . __ ,..

GE14 "" -----*

1.50 +---+---+-----11---+---+---+----+-~I---+---+----+---+--+---+--~

1.00 +---+----+---1=---+---+---+---+-----l--+---l----l---+--~-+--~

25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

. Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 41of52

Figure 7 Flow Dependent MCPR Limits 1.9 ATRIUM 10XM and GE14 1.8 I\~

For F~ 80 % ofRATED:

MCPR(F) = 1.50 lL 0:::

Q.

For 80% > F ~ 30 % of RATED:

MCPR(F)=-0.00600F+1.9800 0

2 1.7

~

E I

\

..J

~

Q.

0 2

I\

c:

Q)

"C c:

1.6

"'I\

Q) a.

Q) c

~

0 u:::

1.5 1.4 20 30 40 50 60 70 80 90 100 110 120 Core Flow (% Rated)

Results from the equations above are accurate to three decimal places.

The flow-dependent MCPR limits shown above apply to both GE14 fuel and ATRIUM 10XM fuel.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 42 of 52

Figure 8 Power/Flow Map 100 I I

I I

I I

I I

I 90 -t----------------

I


~I ------------- . 1803.6 I I I I I I I I I I I

I I I I I 80 --------------------t---------------- ----+ ------------- 1603.2 I' II I I I I I I

  • 0'<).~

G~cl  !

I I

70 ----------- ""'fl> -------------------t---------------- ~---~--- ----------- 1402.8 "C

Q)

'10

~

-*~~\) I I

I I

I I

I I

I I

I I

I I

I I

I I

I

~

I I I I

~ 60 - ---t---------------------+---------------------t------------!""--- ------t---- 1202.4 1 I I I I I I I 0  :

I I

Normal Region I

I I 2 I I I

!
. I I I ICF

~

..... 50 -------.1.----------------------L----------

I I I

____ i.J _____ _ 1002.0

~

I I I I

I I

I I

I I

I I

a..

I I I a.. I I I I

I I iU e0 40 I I

..-!--------i!--------.------+-----1------ - 801.6 I

1--

I E

Q) 0 f-RTS Region Boun~ary !I

.c:

I I I t-

~

I I I I I I I I I

_.., _____________________ ....... _____________________ ... ________________ -----1 --------------

I I I 0

30 601.2 I

I I

I I

I I 0 i 30% Pump  ! Minimum Power  !  !

Speed Line  !

I Line \. !I I

I I I 20 -t---------------------7---------- -----------t---------------------1--------------- . . 400. 8 I I I I I I I I Natural Circulation I I I I I I I

I I Actual Natural Circulation and I

I I 30% Pump Speed Lines could 100% core Power 100% Core Flow 2004 MWt

57. 6 Ml.b/hr 10 I differ from that shown. ---- - 200.4 0 0.0 0 .10 20 30 40 50 60 Core Fl.ow (Mlb/hr)

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page43 of 52

Figure 9 Power Dependent MCPR(P) Limits for Pressure Regulator Out of Service (PROOS)

MCPR(P) with PROOS For P < 25%: No Thermal Limits Required ATRIUM 10XM For 25% .:::_ P < 40%, >50% Flow MCPR(P)= -0.03467P+4.1967 3.50 + - - - + - - - - + - - - - - + - - , _ _ _ - - + - - - - + - - - - + - - _ _ _ _ . , For 25% .:::_ P < 40%, .: :_ 50% Flow MCPR(P)= -0.03933P+4.1433

> 50%0 fl ATRIUM 10XM For40%,::: P < 85%

" " ( ow, MCPR(P)= -0.01200P+3.0100

. -, ""\ Ii \ \ For 85% .:::_ P MCPRCP)= -0.00333P+2.0033 3

.00 _,_~_\___,on-'-'........,.,.____>_5~0-%_fl_o_w_,_G_E_14_-+----+--___.,GE 14

  • ,~~, *,~' : / For25%.:::_P<40%,>50%Flow MCPR(P)= -0.03933P+4.3033 For 25% .:::_ P < 40%,.:::. 50% Flow

' \.. ~'* 1 ...... .:::. SO%flow, ATRIJUM 10xlM MCPR(P)=-0.05133P+4.4133

  • ,...- For40%.:::_P<85%

MCPR(P)= -0.01022P+2.7389 2.50 ' . L... ATRIUM 10XM - For B5 %.:::_ p YI' --..~ MCPR(P)= -0.00333P+1.9833

/ \ ...............

/ ..... _... ...............

.:::_ 50% flow, GE14 ............ ......

~ ...............

GE14 ......... ..........._

I .._ ... ._._ --...._.

200 I


+---+---l.~-+---l-----+---+---l--~~-~...

--+-=--,..__--+----+---l 4 ...

I

... ~ ........... ....

ATRIUM 10XM

---r- ----- ... -*

I GE14 1.50 +----+----+---11---+----l---+-----+----!--+---+----l------'I'--..---+---~

I I

1.00 .+---+----l------'l'--+---+----+----l----+--+---+-~-+-~-..~~+--~+-~~

25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 44 of 52

Figure 10 Pressure Regulator Out Of Service Interim MFLCPR Limit 1.02 ....----.-----,....-------------.--------,------,.----,.---.---.--------,

I I I I No change from Base I

I No change Case 1+- from Base -+

I I

I oo I O I 0 I Cl: 0.92 --~--#-----~------+------+------+----+---~-+--------l

': I AREVA - 1OXM for 25% < P ~ 40% I

,E I MFLCPR = -0.00400P +1.100 J

I /1

~ I I

~ I ,/' I f5 0.87 + - -.....---+---___._----+-----+-----+--.------+--__._,--+-------I

_i I GE14- For40%~ P ~ 85%

~ I MFLCPR = 0.00267P +0.673 ,/'

E I

  • c: I ~ .*

.S I ~

c: 0.82 +---l----+--------------+-----'----+-----+-l----1---1--+---~

I I I

  • I I I I ,/'

AREVA 10XM -For40% < P ~ 85%

I MFLCPR = 0.00289P +0.614 I

0.77 -l--------+----_._-----!-~#C-----+------+----lf----<t---+-----1 I I I I I I I I I I 0.72 -l----=-1 ---+-----=~---+-----+------+-----+---'1=--+----I 20 30 40 50 60 70 80 90 100 Power (% Rated)

The plots are valid for NSS and TSSS times.

The limits are not dependent on core flow.

Results from the equations above are accurate to two decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 45 of 52

Figure 11 Power Dependent LHGR Multipliers for Pressure Regulator Out of Service (PROOS) 1.10 I J ATRIUM10XM I

1.00

___......- ~, ...

J,.....--- ,,.

ATRIUM10XM __.,,.. _, , ..

0.90 ,.

~ GE14

~ t

__.,,,- ~

0.80

~

I 50%flow, ATRIUM 10XM V"" __ .

0.70

,__.,,..,~

I

> 50%flow, ATRIUM 10XM a..

0

~

0.60

/

I

~

I -- -* .- -- '"--

...... ,,.- ~-

GE14 LHGRFAC(P)with PROOS For P < 25%: No Thermal Limits Reguired ATRIUM10XM For 25% ~ P < 40%, >50% Flow

~

(9 0.50

/ 11 .~ LHGRFAC(P)= 0.00933P+0.14667

~ ...... For 25% ~ P < 40%, ~ 50% Flow

c

...J v" ~ "°< 50% flow, GE14 LHGRFAC(P)= 0.01067P+0.17333 0.40 ~

A

___ ,-- -* For40%~ P < 85%

LHGRFAC{P}= 0.00489P+0.50444 0.30 IO

> 50% flow, GE14

""" I For85%~ P LHGRFAC(P}= 0.00400P+0,60000}

GE14 For 25% ~ P < 40%, >50% Flow I LHGRFAC(P)= 0.00467P+0.22333 I For 25%~ P < 40%,~ 50% Flow 0.20 LHGRFAC{P)= 0.00933P+0.13667

  • For40%~ P < 85%

LHGRFAC(P)= 0.00444P+0.36222 For85%~ P 0.10 LHGRFAC(P)= 0.00667P+0.2933,3 0.00 A 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 46 of 52

Figure 12 Pressure Regulator Out of Service {PROOS)

Interim MFLPD Limit 1.02 -r---.---,------.-----.,------,..----,.----,..---.--.,....-----,

I I I No change I I from Base I No change I Case I+- from Base -+

0.97 ---------+--+------+-----+-----+-----+----t----=-J----l ase I

I I

UJ I I I AREVA 1OXM - For 40% < P ~ 85%

0 0 I MFLPD = 0.00128P +0.8699 a::'. 0.92 -l--------+-+----_.,."""'----~~---+-----+----1---1---+--------I

~.... ' I 2 ' I E GE14-For25%<P:5,40%  :

...J MFLPD = -0.00252P +1.0631 I o

~ 0.87 '

+--....;;.---+-----+------1------+--F------+---___....+-.-----=-,- - - - - - - - 1 I

~ ~

~ I

GE14- For40%~ P ~ 85% 1

,.9 MFLPD = -0.00193P +1.0245 I1 c:

I I I I I I I I I I I I 0.77 - - . - - - - + - - - - - + - - - - - - + - - - - - + - - - - - + - - - - t - - - . - - + - - - - - - - - I I I I I I I I I I I 0.72 -----+-----+-----+-----+-----+-----1f----'L----t-----f 20 30 40 50 60 70 80 90 100 Power (% Rated)

Results from the equations above are accurate to two decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 47 of 52

Figure 13 Power Dependent MCPR(P) Limits for SLO with NSS/TSSS Insertion Rates 4.00 , - - - - - , - - - - - , - - - - - . - - - - . , . - . . . - - - - - - - - - - - - - - - - - .

MCPR(P) at TSSS For P < 25%: No Thermal Limits Required ATRIUM lOXM For 25% ~ P < 40%, >50% Flow MCPR( P)=-0. 03467P+4.2468 For 25% ~ P < 40%, ~ 50% Flow MCPR(P)=-0.03933P+4.1932 For 40% ~ P < 66%

3.50 + - - - - - + - - - - - + - - - - - + - - - - - + - I MCPR(P)=-0.01154P+3.0416 GE14

> 50%flow, ATRIUM 10XM For 25% ~ P < 40%, >50% Flow a..

/ I MCPR(P)=-0.03933P+4.3532 For 25% ~ P < 40%, ~ 50% Flow MCPR(P)=-0.05133P+4.4632 For 40% ~ P < 66%

Cl MCPR(P)=-0.00192P+2.4567 a..

0

_:: . 50%flow, ATRIUM 10XM ATRIUM10XM

_ _ _ _ oao _ _ ,.. _ _ ..,_

GE14 2.00 4-----4----4--~~...........~~~-+-~~~-1-~~~-1-~~~-1-~~~-1-~

25 30 35 40 45 50 55 60 65 POWER (°lo Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 48 of 52

Figure 14 Power Dependent MAPLHGR Multipliers 1.10 I

1.00 0.90 GE14 ,,,. .

~

0.80 I

.~

I ,...

I CL' o.?o 0 1 I

I

~ ,.

Q. , I

~ 0.60 i"--  :=: 50% flow, GE14

,,, " ___ ... MAPLHGRp = MAPFACp

  • MAPLHGR 0.50 - - ---~- For P < 25%: No Thermal Limits Required

'" > 50% flow, GE14 GE14 For 25% :=: P < 40%, >50% Flow MAPFACp=0.00153P+0.45780 0.40 For 25% :=: P < 40%, :=: 50% Flow MAPFACp=0.00773P+0.32880 For40%:=: P< 100%

MAPFACp=0.00522P+0.47800 0.30 I

0.20 ' '

25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 49 of 52

Figure 15 Flow Dependent MAPLHGR Multipliers 1.10 1.00

,~

0.90

,~.

GE14 u.

0.80 , *"'

(..)

~

a.. ,,"' MAPLHGR(F) = MAPFAC(F)

<(

2 ,, ~,

GE14 0.70 , ,-*"' For 30% ~ F ~ 78.6%

0:::

0 MAPFAC(F)=0.00681P+0.4557 I- For 78.6% < F ~ 99%

(..)

MAPFAC(F)=0.991

~ For 99% < F _::: 107%

~ 0.60 MAPFAC(F)=1.0 0

...J u.

0:::

(!)

c 0.50

...J a..

<(

2 0.40 0.30 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 Core Flow(% Rated)

In addition to the flow dependent multipliers, Monticello also requires an ECCS MAPLHGR multiplier of 0.9908 for operation at or below 99% core flow for GE14 fuel. This multiplier ensures that the off-rated limits assumed in the EPU ECCS-LOCA analyses bound the cycle-specific off-rated limits calculated for MELLLA+ (EFW) operation.

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page 50 of 52

Figure 16 Pressure Regulator Out Of Service (PROOS)

Power Dependent MAPLHGR Multipliers 1.10 1.00 I

0.90 GE14 _

0.80

-- _. --- _,- I a:- _.,. --

GE14

-* -- -* -- -* I I

0.70 .

0 ...... I if , lo ... MAPLHGRp = MAPFACp

~ 0.60 ,

,.-:_ For P < 25%: No Thermal Limits Required -

, ,, "['.. ~ 50%flow, GE14

........... ~~---

GE14 For 25% ~ P < 40%, 50% Flow MAPFACp=0.00153P+0.4577 0.50

- ~

""'> 50L Flow, GE14 For 25% ~ P < 40%, ~ 50% Flow MAPFACp=0.00773P+0.3287 0.40 For40%~P ~85% -

MAPFACp=O .00400P+0.4850 For85% < P ~ 100%

0.30 MAPFACp=0.00707P+0.2930 ,..._

020 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 POWER (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revision 1 Page ~1of52

Figure 17 Pressure Regulator Out of Service (PROOS)

Interim MAPRAT Limits 1.02 I I I *I I I I I I I I 1.00 I I I

I GE14 *For 85% < P ~ 100%

= , ,,

I No Change MAPRAT 0.002 x P + 0.800

~ ,,

- from Garde!--+ ,,

MAPRAT 0.98 ~,

I I ,

I" en 0 0.96 I

0 a::

a..

I

,g

'E

J 0.94

.... ..... ..... GE14* For40% < P < 85%

II

!;;: =

MAPRAT -0.001 x P+ 0.979 a:: .... ...... I a..

<(

a: 0.92

...... I I

E I

............ I

'i:

=

Q)

I I

I ..........

.......... I I

I I 0.90 I

I ...........I I I I I I ' I I I 0.88 20 30 40 50 60 70 80 90 100 Power (% Rated)

Results from the equations above are accurate to three decimal places.

NAD-MN-042NP, Monticello Cycle 29 COLR, Revis.ion 1 Page 52 of 52