Pages that link to "L-22-100, 180-Day Steam Generator Tube Inspection Report"
Jump to navigation
Jump to search
The following pages link to L-22-100, 180-Day Steam Generator Tube Inspection Report:
Displayed 50 items.
- ML17013A587 (← links)
- ML14034A108 (← links)
- ML080250060 (← links)
- ML071370347 (← links)
- L-18-144, Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report (← links)
- L-17-230, Submittal of Beaver Valley Power Station Emergency Preparedness Plan (← links)
- L-16-201, Firstenerqy Nuclear Operating Company'S (Fenoc'S) Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (← links)
- L-14-416, Amended Storage Tank Registration for Beaver Valley Power Station, Facility Id. 04-13281 (← links)
- L-14-113, Extension Request Regarding the Flood Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights. (← links)
- L-13-376, Addendum to the Beaver Valley Power Station, Unit No. 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report (← links)
- L-13-386, Notice Regarding Acquisition of Leased Interests by Firstenergy Nuclear Generation, LLC (← links)
- L-13-236, Cover Letter: Beaver Valley, Units 1 and 2 - Response to Order EA-13-112 (← links)
- L-13-074, Response to Request for Additional Information Regarding End-of-Life Moderator Temperature Coefficient Testing (TAC Nos. ME9144 and ME9145V) (← links)
- L-11-081, Submittal of Snubber Program for Beaver Valley Power Station Unit Nos. 1 and 2 (← links)
- L-10-067, Beaver, Units 1 & 2, Perry, Unit 1, Request for NRC Consent to Extinguish Parental Guaranty (← links)
- L-09-313, Beaver Valley,Submittal of Discharge Monitoring Report (← links)
- L-09-078, 10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans (← links)
- L-08-363, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-1 Examination Requirements (Request No. 2-TYP-3-RV-02) (← links)
- L-08-365, FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement (← links)
- L-08-222, LER 08-01-00 for Beaver Valley, Unit 2, Regarding Unplanned Actuation of the Auxiliary Feedwater System During Plant Startup (← links)
- L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (← links)
- L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (← links)
- L-07-528, Withdrawal of Beaver Valley Unit No. 2 License Amendment Request No. 07-007 Alloy 800 Steam Generator Tube Sleeving (← links)
- L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2) (← links)
- L-06-099, Beaver, Units 1 & 2, Proposed Alternative to American Society of Mechanical Engineers Code System Leakage Test Requirements (Request No. BV3-PT-3) (← links)
- L-06-109, Renewal Application for Beaver Valley Power Station NPDES Permit No. PA0025615 (← links)
- L-05-052, Letter from L. Pearce of Firstenergy Nuclear Operating Co. to D. Caron, Completion of Security Force Personnel Working Hours Review (← links)
- L-06-027, January 2005 Discharge Monitoring Report for Beaver Valley (← links)
- L-04-032, Submittal of Pennsylvania Department of Environmental Protection (DEP) General Information Form for the Amended Application for Beaver Valley Power Station, NPDES Permit No. PA0025615 (← links)
- L-18-264, Cycle 21 Core Operating Limits Report (← links)
- L-18-176, Twenty-Fifth Refueling Outage Inservice Inspection Summary Report (← links)
- L-18-081, Steam Generator Technical Specification Amendment Request (← links)
- L-17-344, Cycle 25-1 Core Operating Limits Report (← links)
- L-17-114, Report of Facility Changes, Tests and Experiments (← links)
- L-17-319, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-4 Examination Requirements (Request No. 2-TYP-4-RV-02) (← links)
- L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) (← links)
- L-17-299, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BA-01) (← links)
- L-17-294, Submittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 (← links)
- L-17-292, Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule (← links)
- L-17-277, Pressure and Temperature Limits Reports, Revisions 8 and 9 (← links)
- CNS-17-044, Inservice Inspection Report for Unit 1 End of Cycle 23 Refueling Outage (← links)
- L-17-240, Nineteenth Refueling Outage Lnservice Inspection Summary Report (← links)
- L-17-074, Steam Generator Inspection Reports - Spring 2017 Refueling Outage (← links)
- L-17-037, Report of Facility Changes, Tests and Experiments (← links)
- L-17-071, Cycle 20 Core Operating Limits Report (← links)
- L-17-085, Supplemental Information Regarding Pending Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments (CAC MF78066): Exhibit G, Pro Forma Income Statements (← links)
- L-16-334, Supplemental Information Regarding Pending Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments (← links)
- L-16-302, Cycle 25 Core Operating Limits Report (← links)
- L-16-241, Updated Steam Generator Inspection Report - Fall 2015 Refueling Outage (← links)
- L-16-018, Report of Information That Significantly Improves Accuracy of Rtpts Value (← links)