Pages that link to "05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2"
Jump to navigation
Jump to search
The following pages link to 05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2:
Displayed 36 items.
- 05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr (← links)
- 05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr (← links)
- 05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted (← links)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments (← links)
- ML20140B143 (redirect page) (← links)
- ML20140B147 (← links)
- 05000254/LER-1997-003 (redirect page) (← links)
- 05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes (← links)
- 05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER (← links)
- 05000265/LER-1997-008, Forwards LER 97-008-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000265/LER-1997-001, Forwards LER 97-001-01 for Quad Cities Nuclear Power Station,Iaw 10CFR50.73(a)(2)(v)(D).Commitments Made by Util, Listed (← links)
- 05000254/LER-1997-026, Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed (← links)
- 05000265/LER-1997-002, Forwards LER 97-002-01 Which Identifies Addl Discrepancy in LER 97-002-00.Quad Cities Nuclear Power Station Unit 2 Shutdown 022897 Also Required Because of Loss of Primary Containment Integrity (← links)
- 05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed (← links)
- 05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed (← links)
- 05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed (← links)
- 05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed (← links)
- 05000265/LER-1997-003, Forwards LER 97-003-01 Re Core Spray Room Cooler 2B That Fouled Due to Hydrolyzing Debris.Commitment Listed (← links)
- 05000265/LER-1997-005, Forwards LER 97-005-01 Re Unit 2 Reactor Placed in Mode 2 W/O Required Number of Emergency Diesel Generators Operable. Commitment Listed (← links)
- 05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 (← links)
- 05000265/LER-1997-006, Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided (← links)
- 05000254/LER-1997-030, Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed (← links)
- 05000265/LER-1997-012, Informs of Change of Committed Due Date Re Rev to Procedure Contained in LER 97-012,dtd 971218.Due Date Is Now 980828 Due to Work Prioritization & Backlog for Resources for Completion of Engineering Request (← links)
- 05000265/LER-1997-010, Forwards LER 97-010-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).No Commitments Made (← links)
- 05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented (← links)
- 05000265/LER-1997-015, Informs NRC of Change to Committed Due Date Contained in Ltr Re LER 97-015 (← links)
- 05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed (← links)
- 05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings (← links)