Category:Map
MONTHYEARML24221A2172024-09-23023 September 2024 V.C. Summer Area of Potential Effect Topographic Map ML22194A2212022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 2.4-1, Plot Plan - Service Water Pond: North, South and East Dams: Calculating Water Discharge Canal and Jetty ML19255F4152019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.1-26 ML19255F4212019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-10 ML19255F4232019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-13 ML19255F4252019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-25 ML19255F4272019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-27 ML19255F4302019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-3 ML18221A1542018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map ML18221A1562018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation ML18221A1572018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map ML18221A1582018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A' RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A'2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A' ML18221A1592018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B' RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B'2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B' ML1015400222010-06-0303 June 2010 Enclosure 1, Irradiated Reactor Fuel Summary (234), VC Summer Nuclear Power Station, Jenkinsville, Sc to Port of Savannah, Savannah, Ga, Page 1 of 2 ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0303101662003-02-28028 February 2003 Map, Transmission Line Land Cover 2024-09-23
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23208A0762023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23208A0652023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23208A0642023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23208A0702023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23208A0752023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted ML23208A0722023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23208A0682023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML23208A0692023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection - Redacted ML23208A0792023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML23208A0832023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23208A0802023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23208A0712023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23208A0732023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML23208A0822023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities ML23208A0672023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems - Redacted ML23208A0742023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23208A0662023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23208A0782023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23208A0812023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System ML23208A0772023-07-18018 July 2023 3 to Updated Final Safety Analysis Report ML23208A0842023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Frontmatter ML22194A4152022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-9, Redacted ML22194A4182022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 3, Piping System Flow Diagram Waste Processing ML22194A4142022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-36, Rev. 1, System Flow Diagram Aeb DG2 Room HVAC ML22194A4012022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-3, Redacted ML22194A4292022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1C, of Drawing E-302-673, Revision 20, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4202022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1, Sheet 1, Drawing D-302-231, Revision 40, Redacted ML22194A4102022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-15, Rev. 12, Building Service System Flow Diagram Intermediate Building ESF SWGR Rooms and Speed Switch Rooms Cooling Systems ML22194A4302022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-2, Rev. 6, Control Diagram Turbine Stop Valve ML22194A4032022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-9, Rev. 23, Building Service System Flow Diagram Auxiliary Building Main Exhaust System ML22194A4282022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-3, Main System System Steam Dump/Turbine Bypass (Ms) ML22194A4162022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-10, Redacted ML22194A4052022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-12, Rev. 8, Building Service System Flow Diagram Turbine Building Ventilation System ML22194A4002022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-1, Rev. 30, Control Room Normal and Emergency Air Handling System ML22194A4042022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-7, Redacted ML22194A4092022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-33, Rev. 6, Building Service System Flow Diagram Technical Support Center and Main Control Board Ventilation System ML22194A4262022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 3 of Drawing E-302-675, Revision 37, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4112022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A of Drawing E-302-671, Rev. 11, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4172022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-7A, System Flow Diagram Condensate Polishing ML22194A4352022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-18, Rev. 20, System Flow Diagram Boron Recycle ML22194A4132022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1CB, Redacted ML22194A4212022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-11a, Redacted ML22194A4062022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-5, System Flow Diagram Generator Gas & Vents ML22194A4222022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-2, Rev. 22, Building Service System Flow Diagram Relay and Computer Room Cooling System ML22194A4272022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-4, Rev. 18, Control Building Control Access Exhaust ML22194A4342022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-3, Rev. 12, System Flow Diagram Main Reheat Steam (Non-Nuclear) ML22194A4322022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-20, Rev. 19, Service Building First Floor and Second Floor ML22194A4232022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-1, Rev. 42, System Flow Diagram Main Steam (Nuclear) ML22194A4082022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1D, Redacted ML22194A4122022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-32, Rev. 24, System Flow Diagram CRDM Cooling Water 2023-07-18
[Table view] Category:Drawing
MONTHYEARML23208A0752023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted ML22194A4182022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 3, Piping System Flow Diagram Waste Processing ML22194A4102022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-15, Rev. 12, Building Service System Flow Diagram Intermediate Building ESF SWGR Rooms and Speed Switch Rooms Cooling Systems ML22194A4542022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-24, Rev. 18, Piping System Flow Diagram Chilled Water - to Cooling Coils B ML22194A4492022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-6, Rev. 14, Sheet 1B, Chemical and Volume Control ML22194A3822022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-22, Drawing D-302-841, Rev. 36, Chilled Water Pump & Chiller Area ML22194A4402022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-22, Rev. 31, Chilled Water Pump & Chiller Area ML22194A4442022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 4, Drawing E-302-676, Rev. 15, Chemical and Volume Control ML22194A4362022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-12, System Flow Diagram Feedwater (Nuclear) ML22194A4352022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-18, Rev. 20, System Flow Diagram Boron Recycle ML22194A4322022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-20, Rev. 19, Service Building First Floor and Second Floor ML22194A4312022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-5, System Flow Diagram Circulating Water Cooling ML22194A4272022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-4, Rev. 18, Control Building Control Access Exhaust ML22194A4262022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 3 of Drawing E-302-675, Revision 37, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4232022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-1, Rev. 42, System Flow Diagram Main Steam (Nuclear) ML22194A4222022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-2, Rev. 22, Building Service System Flow Diagram Relay and Computer Room Cooling System ML22194A3882022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-17, Rev. 17, Intermediate Building General Ventilation and Pump Area Cooling Systems ML22194A4172022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-7A, System Flow Diagram Condensate Polishing ML22194A4122022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-32, Rev. 24, System Flow Diagram CRDM Cooling Water ML22194A4112022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A of Drawing E-302-671, Rev. 11, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4032022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-9, Rev. 23, Building Service System Flow Diagram Auxiliary Building Main Exhaust System ML22194A4022022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-8, Rev. 31, Building Service System Flow Diagram Auxiliary Building Charcoal Exhaust System Flow Diagram ML22194A3992022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-35, Rev. 1, Sheet 2, Building Services Flow System Diagram Eb HVAC DG1 Room ML22194A3982022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-11, Rev. 27, Building Service System Flow Diagram Fuel Handling Building Charcoal Exhaust System & Air Supply Distribution ML22194A3952022-06-27027 June 2022 1 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1C, Piping System Flow Diagram Chemical and Volume Control ML22194A3942022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-15, Rev. 15, Plant Industrial and Sanitary Waste Gilbert Associates ML22194A3902022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-4, Revision 3, Sheet 1, Design Engineering ML22194A3892022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-4, Rev. 17, System Flow Diagram Main Steam Dump System ML22194A3852022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-19, Rev. 17, Building Service System Flow Diagram Service Water Intake Screen and Pimp House Building Ventilation System ML22194A4382022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-17, Piping System Flow Diagram, Liquid Effluents from Nuclear Plant to Fairfield Penstock ML22194A4392022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-10, System Flow Diagram Feedwater (Non-Nuclear) ML22194A4412022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-14, Nuclear Blowdown Processing System Holdup Tank and Demineralizer ML22194A4422022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A, System Flow Diagram Chemical and Volume Control ML22194A4142022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-36, Rev. 1, System Flow Diagram Aeb DG2 Room HVAC ML22194A3962022-06-27027 June 2022 2 to Final Safety Analysis Report, Figure 9.4-26, of Drawing E-922-541, Revision 6, Building Service Substation Relay House Floor El. 436-0 ML22194A4092022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-33, Rev. 6, Building Service System Flow Diagram Technical Support Center and Main Control Board Ventilation System ML22194A4282022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-3, Main System System Steam Dump/Turbine Bypass (Ms) ML22194A4342022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-3, Rev. 12, System Flow Diagram Main Reheat Steam (Non-Nuclear) ML22194A4462022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-31, Rev. 15, Building Service System Flow Diagram R.B.C.R.D.M. Shroud Vent System ML22194A4202022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1, Sheet 1, Drawing D-302-231, Revision 40, Redacted ML22194A3812022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-20, Rev. 22, Piping System Flow Diagram Normal and Post-Accident Sampling ML22194A3972022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-3A, Control Diagram Turbine Stop Valve ML22194A3872022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-8, Plant Layout Final Reactor & Fuel Handling Buildings Section A-A Looking West ML22194A4002022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-1, Rev. 30, Control Room Normal and Emergency Air Handling System ML22194A4252022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 2, Piping System Flow Waste Processing ML22194A4452022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-14, Rev. 32, Piping System Flow Diagram Non-Nuclear Plant Drains ML22194A4372022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-25, Sheet 1, Drawing D-302-851, Piping System Flow Diagram Industrial Cooling Water ML22194A4192022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-16, Rev. 15, Battery Rm. & Charging Rm. BOP Charger Area Ventilation System ML22194A4062022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-5, System Flow Diagram Generator Gas & Vents ML22194A4302022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-2, Rev. 6, Control Diagram Turbine Stop Valve 2023-07-18
[Table view] |