Similar Documents at Byron |
---|
Category:Letter
MONTHYEARIR 05000454/20250102025-03-0404 March 2025 Commercial Grade Dedication Report 05000454/2025010 and 05000455/2025010 RS-25-019, Stations - License Amendment Request to Adopt TSTF-309, Revise Pressureizer PORV Actions Not to Require Cycling of Block Vlave When Closed for Isolation, Revision 22025-02-27027 February 2025 Stations - License Amendment Request to Adopt TSTF-309, Revise Pressureizer PORV Actions Not to Require Cycling of Block Vlave When Closed for Isolation, Revision 2 RS-25-038, Constellation Submittal of Fitness for Duty Performance Data Reports - Annual 20242025-02-27027 February 2025 Constellation Submittal of Fitness for Duty Performance Data Reports - Annual 2024 ML25034A0652025-02-0404 February 2025 Request to Use Provisions from a Later Edition of EPID-L-2024-LLR- 0073 (EPID-L-2024-LLR- 0073) ML25028A3162025-02-0303 February 2025 Operator Licensing Examination Approval - Byron Station February 2025 IR 05000454/20240042025-01-31031 January 2025 Integrated Inspection Report 05000454/2024004 and 05000455/2024004 RS-25-009, Supplement to Modify the Implementation Date for License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Sto2025-01-15015 January 2025 Supplement to Modify the Implementation Date for License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Stor ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums IR 05000454/20244022024-12-21021 December 2024 Security Baseline Inspection Report 05000454/2024402 and 05000455/2024402 ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 ML24339B7292024-12-18018 December 2024 Amd - Constellation - Adoption of TSTF-591 ML24351A1892024-12-16016 December 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000455/2025011 RS-24-129, Supplemental to Modify the Implementation Date for License Amendment Request to Remove Power Distribution Monitoring System (Pdms) Details Technical Specifications2024-12-10010 December 2024 Supplemental to Modify the Implementation Date for License Amendment Request to Remove Power Distribution Monitoring System (Pdms) Details Technical Specifications RS-24-077, Application to Revise Technical Specifications for Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2024-12-0909 December 2024 Application to Revise Technical Specifications for Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process BYRON 2024-0060, CFR 50.59 Summary Report, Changes, Tests and Experiments2024-12-0808 December 2024 CFR 50.59 Summary Report, Changes, Tests and Experiments ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24331A2792024-11-26026 November 2024 Supplement to Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition - Revise LaSalle, Units 1 and 2 Technical Specificati ML24299A2552024-11-25025 November 2024 Audit Plan in Support of Review of License Amendment Request to Transition to Framatome Gaia Fuel (EPID L-2024-LLA-0072) Nonproprietary BYRON 2024-0059, CFR 72.48 Evaluation Summary Report2024-11-21021 November 2024 CFR 72.48 Evaluation Summary Report BYRON 2024-0057, Day Inservice Inspection Report for Interval 4, Period 3, (B1R26)2024-11-14014 November 2024 Day Inservice Inspection Report for Interval 4, Period 3, (B1R26) IR 05000454/20240032024-11-12012 November 2024 Integrated Inspection Report 05000454/2024003 and 05000455/2024003 05000454/LER-2024-002, Reactor Vessel Closure Head Penetration 31 Degraded2024-11-0707 November 2024 Reactor Vessel Closure Head Penetration 31 Degraded RS-24-122, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2024-11-0707 November 2024 Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision BYRON 2024-0054, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-10-24024 October 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 2025-03-04
[Table view] |
Text
I,
Exel6n.
SAFEGUARDS INFORMATION Exelon Generation 4300 Winfield Road Wanrenvile, IL 60555
.www.exelOnCOTP.COM Nuclear 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)
RS-10-163 September 30, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454, STN 50-455 and 72-68
Subject:
Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 10 to the Byron Station Security Plan. Changes to this document were implemented on August 6, 2010. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within 60 days of implementation (i.e., no later than October 5, 2010).
The Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan has been revised to:
- 1.
Implement additional areas associated with the Essential Service Water (SX) cooling towers.
- 2.
Implement the Owner Controlled Area (OCA) thermal camera system.
- 3.
Implement specific information in regards to the Early Warning System (EWS).
EGC has concluded that the changes do not decrease the safeguards effectiveness of the Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.
Attachments 1 and 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).
ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
(.
SAFEGUARDS INFORMATION Exelon Generation 4300 Winfield Road Warrenville, IL 60555 www.exeloncorp.com Nuclear RS-10-163 September 30, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454. STN 50-455 and 72-68 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)
Subject:
Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2L Exelon Generation Company, LLC (EGG) is submitting Revision 10 to the Byron Station Security Plan. Changes to this document were implemented on August 6, 2010. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within 60 days of implementation (i.e., no later than October 5, 2010).
The Security Plan, Training and Qualification Plan, and Safeguards Conting'ency Plan has been revised to:
- 1.
Implement additional areas associated with the Essential Service Water (SX) cooling towers.
- 2.
Implement the Owner Controlled Area (OCA) thermal camera system.
- 3.
Implement specific information in regards to the Early Warning System (EWS).
EGC has concluded that the changes do not decrease the safeguards effectiveness of the Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.
Attachments 1 and 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections; exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," pC3.ragraph (a)(1 )(i).
ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
~KS-SO I
~cO\\
. ~J~IL
SAFEGUARDS INFORMATION September 30, 2010 U. S. Nuclear Regulatory Commission.
Page 2 There are no commitments in this letter.
Should you have any questions concerning this letter, please contact Mr. Gerald T.
Armstrong III at (630) 657-2915.
Re pectfully, Patrick R. Simpson Manager - Licensing Attachments:
- 1.
Byron Station, Description of Changes (Contains Safeguards Information)
- 2.
Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 (Contains Safeguards Information) cc:
Regional Administrator - NRC Region III ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION September 30, 2010 U. S. Nuclear Regulatory Commission Page 2 There are no commitments in this letter.
Should you have any questions concerning this letter, please contact Mr. Gerald T.
Armstrong III at (630) 657-2915.
Rl&ln Patrick R. Simpson Manager - Licensing*
Attachments:
- 1.
Byron Station, Description of Changes (Contains Safeguards Information)
- 2.
Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 (Contains Safeguards Information) cc:
Regional Administrator - NRC Region III ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION