Meeting Summary (Attachments) for Regulatory Conference (EA-08-197) 91608ML082690575 |
Person / Time |
---|
Site: |
Byron |
---|
Issue date: |
09/24/2008 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML082690575 (3) |
|
Similar Documents at Byron |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16334A4642016-12-0505 December 2016 Westinghouse Pre-Application Meeting: License Amendment Request to Modify Byron Station Facility Operating License in Support of the Molybdenum-99 Isotope Production Project - December 5, 2016 ML16327A3702016-11-25025 November 2016 Enclosure 3: Exelon Byron Station Design (Meeting Handout) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15342A1012015-12-0909 December 2015 TORMIS Computer Code Methodology Public Meeting Slides ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14051A0592014-02-20020 February 2014 2/06/2014, NRC Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML14051A0662014-02-20020 February 2014 2/06/2014, Exelon Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML13275A0402013-08-20020 August 2013 License Renewal Process and Environmental Scoping Meeting Slides ML13227A3922013-08-14014 August 2013 2012 Byron End-of-Cycle Public Meeting NRC Presentation ML13227A3892013-08-14014 August 2013 2012 Byron End-of-Cycle Public Meeting Licensee'S Presentation 2024-01-08
[Table view] Category:Photograph
MONTHYEARRS-11-062, Report No. 901348-04, Exelon Relief Request 13R-19, Penetration 64, Page 3 of 42011-04-0606 April 2011 Report No. 901348-04, Exelon Relief Request 13R-19, Penetration 64, Page 3 of 4 ML1110105622011-04-0606 April 2011 Report No. 901348-04, Exelon Relief Request 13R-19, Penetration 64, Page 2 of 4 ML1110105492011-04-0606 April 2011 Report No. 901348-04, Exelon Relief Request 13R-19, Penetration 64, Page 4 of 4 ML1110105422011-04-0606 April 2011 Report No. 901348-03, Exelon Relief Request 13R-19, Penetration 31, Page 3 of 3 ML1110105382011-04-0606 April 2011 Report No. 901348-03, Exelon Relief Request 13R-19, Penetration 31, Page 2 of 3 ML0826905752008-09-24024 September 2008 Meeting Summary (Attachments) for Regulatory Conference (EA-08-197) 91608 2011-04-06
[Table view] |
Text
1A SX PumpB-Train 330'346'364'383'Unit Crosstie 1SX033 1SX034 1SX005 2SX005 1SX004 U1 CC HX 1SX010 Return HeaderCV Pumps1SX011 1SX136 401'1SX013A 1SX012A 0CW100A2A SX PP1A SX PP 0SX163A 0SX163B 0SX163C 0SX158A1SX112A1SX114A 1SX027A 1SX016A 1SX143A 0SX163D 0SX163E 0SX163F 0SX163G 0SX158B1SX112B1SX114B 1SX027B 1SX016B 0SX163H 1SX 143B 0SX 157B0A FAN0B FAN0C FAN0D FAN RIVER0A SX M/U PP WW MU CW MU0E FAN0F FAN0G FAN0H FAN(DIVISION 11)(DIVISION 21)(DIVISION 12)(DIVISION 22) 0B SX M/U PP WW MU CW MU RIVER1A & 1C RCFC COILSContainment Chiller1A D/G Misc "A"Train ESF Loads1A SX Pp Cub Cooler1A SX Oil Cooler Unit 1 CC Hx 1SX004 1SX007 1SX033 131X1 1SX104B 1SX0101SX011 1SX101 0SX172 0SX174 1SX169A Fire Protection Hdr (U-2 only)
Fire Protection Hdr (U-1 only) 2B SX PP 1B SX PP Unit 2 Loads 1B & 1D RCFC COILSContainment Chiller 1B D/G Misc "B"Train Loads 1B SX Pp Cub Cooler 1B SX Oil Cooler Unit 0 CC Hx 1SX005 0SX007 1SX034 132X1 0SX147 0SX146 1SX173 1SX178 1SX105B 1SX169B 2SX005 S1A AF Pp OIL CoolerTO 2A Rtrn From 2B From 2A L From U-2A Train ReturnA Train SupplyTrain CrosstiesB Train ReturnB Train Supply Unit 2 LoadsTOWER 0ATOWER 0B1B AF PpComponents L L L IAPt. APt. A AFW Recirc A 100 90 80 70 60 50 40 30 20 10 0%A 100 90 80 70 60 50 40 30 20 10 0%0-37-A8 HA: 100%
LA: 80%0WW019B 0CW100B 0WW019A SX System Piping 0SX157A 64%FC FC FC FC 1SX136 1SX001A 2SX001A 1SX001B 2SX001B 0-37-A8 HA: 100%
LA: 80%1SX046B 1SX013B 1SX012B 1SX012A 1SX052A 1SX2103A 1SX046A 1SX052B 1SX013A