North Anna Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440533
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
Download: ML092440533 (2)


Text

Inspection / Activity PlanPage 1 of 209/01/200907:52:15Report 2209/01/2009

-12/31/2010UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteNorth AnnaISFSI-ISFSI OPERATIONAL INSPECTION 21, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/200910/15/2009TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 71, 2 IPFire Protection [Triennial]7111105T09/14/200909/18/20091, 2 IPFire Protection [Triennial]7111105T09/28/200910/02/2009EB1-CDBI-COMPONENT DESIGN BASIS INSPECTION 61, 2 IPComponent Design Bases Inspection711112110/19/200910/23/20091, 2 IPComponent Design Bases Inspection711112111/02/200911/06/20091, 2 IPComponent Design Bases Inspection711112111/16/200911/20/20091, 2 IPComponent Design Bases Inspection711112112/07/200912/11/2009OL RQ-REQUAL INSPECTION 31, 2 IPLicensed Operator Requalification Program7111111B01/11/201001/15/2010EB3ISI-UNIT 1 ISI 11 IPInservice Inspection Activities - PWR7111108P03/22/201003/26/2010EB3TI172-EB3 RCS DM BUTT WELDS 11, 2 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17203/22/201003/26/2010OL EXAM-INITIAL EXAM PREP 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333305/17/201005/21/2010OL EXAM-INITIAL EXAM - WEEK 1 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333306/07/201006/11/2010OL EXAM-INITIAL EXAM - WEEK 2 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333306/21/201006/25/2010PSB1EP-EMERGENCY PREPARENESS EXERCISE 31, 2 IPExercise Evaluation711140107/19/201007/23/20101, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140507/19/201007/23/20101, 2 IPPerformance Indicator Verification7115107/19/201007/23/2010PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 21, 2 IPAccess Control to Radiologically Significant Areas711210109/13/201009/17/20101, 2 IPALARA - Required7112102-7112102R09/13/201009/17/20101, 2 IPRadioactive Material Processing and Transportation711220209/13/201009/17/20101, 2 IPPerformance Indicator Verification7115109/13/201009/17/2010EB3ISI-UNIT 2 INSERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P09/20/201009/24/2010EB3TI172-EB3 RX COOLANT SYS DM BUTT WELDS 12 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17209/20/201009/24/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Inspection / Activity PlanPage 2 of 209/01/200907:52:15Report 2209/01/2009

-12/31/2010UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteNorth AnnaPSB1-RP-RP OCCUPATIONAL BASELINE WEEK2 21, 2 IPAccess Control to Radiologically Significant Areas711210109/27/201010/01/20101, 2 IPALARA - Required7112102-7112102R09/27/201010/01/20101 IPRadioactive Material Processing and Transportation711220209/27/201010/01/20101, 2 IPOccupational Exposure Control Effectiveness71151-OR0109/27/201010/01/20101, 2 IPRETS/ODCM Radiological Effluent71151-PR0109/27/201010/01/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.