Letter Sequence Approval | |
---|---|
TAC:ME2439, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:ME2440, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) | |
MONTHYEARML0929503402009-10-20020 October 2009
[Table View]License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 Project stage: Request ML0933800952009-12-0303 December 2009 TSTF-511 LAR Acceptance Review Project stage: Acceptance Review ML0931600842010-02-0202 February 2010 Issuance of Amendments 327 and 320, Regarding Adoption of TSTF- 511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.1 to Support Compliance with 10CFR Part 26 (Tac Nos. ME2439 and ME2440) Project stage: Approval 2009-12-03 |
ML093160084 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 02/02/2010 |
From: | Lingam S P Plant Licensing Branch II |
To: | Swafford P D Tennessee Valley Authority |
Siva Lingam 415-1564 | |
References | |
TAC ME2439, TAC ME2440 | |
Download: ML093160084 (10) | |
Similar Documents at Sequoyah | |
---|---|
Category:Letter
MONTHYEARCNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024
[Table view]Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements ML24088A0332024-03-28028 March 2024 Request for Regulatory Conference (Tennessee Valley Authority) CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report ML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation CNL-24-027, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 2024-09-08 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARML24247A1752024-08-28028 August 2024
[Table view]Enclosure 1: Description and Assessment of the Proposed Changes ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22115A0022022-05-17017 May 2022 Correction to Amendment No. 350 Regarding One-Time Change to Technical Specification3.4.12, Low Temperature Overpressure Protection System, CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-21-085, License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-02-24024 February 2022 License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01)2021-11-29029 November 2021 Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2021-08-0505 August 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-042, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05)2020-04-17017 April 2020 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05) CNL-20-010, Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-02-24024 February 2020 Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-19-066, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2020-01-14014 January 2020 Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-005, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01)2019-02-0101 February 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)2018-03-16016 March 2018 Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06) CNL-17-150, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)2018-03-0909 March 2018 Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) CNL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS)2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS) .. NL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .. CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. NL-17-008, Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) CNL-17-008, License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days2016-07-22022 July 2016 Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days CNL-16-001, Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-05-26026 May 2016 Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-018, License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-05-16016 May 2016 License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-15-178, License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482)2015-08-28028 August 2015 License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482) CNL-15-164, Second Annual Update, License Renewal Application2015-08-14014 August 2015 Second Annual Update, License Renewal Application CNL-14-075, Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82014-05-27027 May 2014 Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML13329A7172013-11-22022 November 2013 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) ML13281A8062013-08-0606 August 2013 Operating License Renewal, Site 40HA22 and Revision to Phase I Cultural Resources Survey Final Report, Hamilton County, Tn ML13199A2812013-07-0303 July 2013 Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) 2024-08-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML093160084&oldid=976911"