Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2-A, Response to Request for Additional Information
ML101100608
Person / Time
Site: Millstone, Kewaunee, Surry, North Anna  Dominion icon.png
Issue date: 04/16/2010
From: Price J A
Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-528B, FOIA/PA-2011-0115
Download: ML101100608 (12)


Text

Dominion Resources Services, Inc.,11011 I)ominion Boulevard,GlenAllen, V,\)'" ,\,*b\ddress: www.dom.corn April 16, 2010 U.S.Nuclear Regulatory Commission Attention:

DocumentControlDesk Washington,DC20555SerialNo.NL&OS/GDMDocketNos.LicenseNos.

09-528B R1 50-305 50-336/423 50-338/339 50-280/281 DPR-43 DPR-65/NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGYKEWAUNEE,INC.

DOMINION NUCLEAR CONNECTICUT, INC.VIRGINIAELECTRICANDPOWER COMPANY KEWAUNEE POWER STATION MILLSTONEPOWERSTATIONUNITS2AND3NORTHANNAPOWERSTATIONUNITS1AND2 SURRY POWERSTATIONUNITS1AND2 REMOVALOFMIXINGVANEGRIDSPACING RESTRICTION IN APPENDIXBTO FLEET REPORT DOM-NAF-2-A RESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONInan August28,2009letter(SerialNo.09-528),DominionEnergy Kewaunee, Inc., Dominion NuclearConnecticut,Inc.,andVirginiaElectricand Power Company (collectively"Dominion")requestedNRCapprovaltoremoveamixingvanegridspacingrestrictioncontainedin AppendixBofFleetReport DOM-NAF-2-A,"Qualificationofthe WestinghouseWRB-1CHFCorrelationintheDominion VIPRE-D Computer Code." Specifically, the subjectrestrictionstatesthat"VIPRE-DIWRB-1willnotbeusedforfuelwithlessthan13"mixingvanegridspacing."Dominionprovided technical justificationforremovingtherestrictionintheAugust28,2009letter.Inaddition, Dominion provided supplemental informationina subsequentletterdated November20,2009(SerialNo.

09-528A.)Inane-maildatedMarch9,2010,theNRCprovidedadraftrequestfor additional information (RAI)associated with Dominion'ssubmittals.A conferencecallwasheldon March 16,2010todiscussthe questionscontainedintheRAI,andatthe conclusion ofthecall,Dominionstatedthatitwould formallyrespondtotheRAIonthedocket.

Dominion's response isprovidedintheattachment.

SerialNo.09-5288 Docket Nos.50-305/336/423/338/339/280/281Page2of3Ifyouhaveany questionsorrequireadditionalinformation,please contactMr.GaryD.Millerat(804)273-2771.

Sincerely, r J.AInceVicPr sident-Nuclear EngineeringDoi.nEnergyKewaunee,Inc.

Dominion Nuclear Connecticut, Inc.Virginia ElectricandPower Company

Attachment:

  • ResponsetoRequestforAdditionalInformation,RemovaloftheGridSpacingRestrictionin Appendix BtoFleetReport DOM-NAF-2-ACommitmentsmadeinthisletterNonecc:U.S.Nuclear Regulatory Commission Region I 475 Allendale RoadKingofPrussia, Pennsylvania 19406-1415 U.S.Nuclear Regulatory CommissionRegionII 245 Peachtree CenterAvenue,NESuite1200 Atlanta, Georgia 30303-1257 U.S.Nuclear Regulatory CommissionRegionIII 2443 Warrenville RoadSuite210Lisle,Illinois 60532-4352 Mr.P.S.Tam NRC Senior Project Manager-KewauneePowerStationU.S.Nuclear Regulatory Commission One WhiteFlintNorth11555RockvillePikeMailStop8H4ARockville,Maryland 20852-2738 SerialNo.09-5288 Docket Nos.

Page 3 of 3Ms.C.J.Sanders NRC Project Manager-Millstone Power Station Units2and 3U.S.Nuclear Regulatory Commission One WhiteFlintNorth 11555 Rockville Pike Mail Stop8B1A Rockville, Maryland 20852-2738Ms.K.R.Cotton NRC Project ManagerU.S.Nuclear Regulatory Commission One WhiteFlintNorthMailStop8 G9A 11555 Rockville PikeRockville,MD 20852-2738Dr.V.Sreenivas NRC Project ManagerU.S.Nuclear Regulatory Commission One WhiteFlintNorthMailStop8 G9A 11555 Rockville PikeRockville,MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station NRC SeniorResidentInspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SerialNo.09-5288 Docket Nos.50-305/336/423/338/339/280/281 ATTACHMENT Response to Request for Additional Informaticm Removal of the Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2-ADOMINIONENERGY KEWAUNEE, INC.DOMINION NUCLEAR CONNECTICUT, INC.VIRGINIAELECTRICANDPOWER COMPANY KEWAUNEE POWER STATION MILLSTONEPOWERSTATIONUNITS2 AND3 NORTH ANNA POWER STATIONUNITS1 AND 2SURRYPOWERSTATIONUNITS1AND2 SerialNo.09-5288DocketNos.

50-305/336/423/338/339/280/281 Attachment Response to Request for Additional InformaticmRemovaloftheGrid Spacing Restriction in AppendixBto Fleet Report DOM-NAF-2-A IntroductionByletterdated August28,2009(Reference1),Dominion EnerqyKewaunee,Inc., Dominion NuclearConnecticut,Inc.,andVirginiaElectricandPower Company (collectively"Dominion")requestedNRCapprovaltoremoveamixingvanegridspacingrestrictioncontainedin AppendixBofFleetReport DOM-NAF-2-A (Reference 2),"Qualificationofthe WestinghouseWRB-1CHFCorrelationintheDominion VIPRE-D ComputerCode."Specifically,thesubjectrestrictionstatesthat"VIPRE-DIWRB-1 willnotbeusedforfuelwithlessthan13"mixingvanegridspacing."Dominionprovided the technical justificationforremovingtherestrictioninthe subject letter (Reference 1).Dominionprovided supplementalinformationto further supporttherequestandto facilitateNRCreviewina November20,2009letter (Reference3).TheNRCacceptedtheDominionrequestforreviewviaReference4.TheNRC staff forwardedbyemailadraftRequestfor Additional Information(RAI)to completethereview oftheproposedchangethatconsistedoffive questions (Reference5).A teleconferencewasheldonMarch16,2010betweentheNRCand Dominion stafftodiscussthedraftquestions.The questionswerefinalizedandthe aforementioned email becameaformalRAI(Reference5).

Dominion's responsetothe RAI questionsisprovidedherein.

Background

AppendixBof DOM-NAF-2-A documents Dominion's qualificationoftheWRB-1correlationwiththe VIPHE-Dcode.TableB.8-1liststhe departure from nucleate boilingratio(DNBR)designlimitof1.17for VIPRE-DIWRB-1,whichis thevaluethatyieldsa 95%non-DNB probabilityata95%confidencelevel(95/95 limit).AppendixBalsoincludesarestrictionthatstates"VIPRE-DIWRB-1willnotbeusedforfuelwithlessthan13"mixingvanegridspacing."Thepurposeofthisrestrictionwasto preclude theuseofthe VIPRE-DIWHB-1 code/correlation with Westinghousefuelwith IntermediateFlowMixingVanegrids(IFM),whichhaveanominal13"grid spacing.Therestriction was originallyplacedonWRB-1intheissuanceoftheSafety EvaluationReport(SER)forthe COBRAlWRB-1topicalreport, VEP-NE-3-A (Reference6).Whenthe VIPRE-Dfleetreportwasdeveloped,therestrictionfromthe COBRASERwasincludedinthe WRB-1 qualification in AppendixBof DOM-NAF-2-A (Reference 2).Page1of8 SerialNo.09-5288 Docket Nos.50-305/336/423/338/339/280/281 Attachment In Reference7theNRCissueda license amendmentfortheIndianPoint Nuclear GeneratingUnitNo.3(IP3)to accommodate the transition from VANTAGE5fuel withoutIFMsto VANTAGE+withIFMsforCycle10.In Section2.3ofthe safety evaluation for that amendment,theNRC staff stated:"TheWestinghouserodbundlecritical heatflux(CHF)correlation,WRB-1, predicts critical heatfluxinrodbundles based on subchannellocalfluidconditions.Thiscorrelationwas initially approved for the standard 14X14,15X15andthe17X17 standardWestinghousefuel(lI\lCAP-8762).

Evolution of the standard17X17and15X15fuelhavebeen developed by Westinghouseandtheir behavior simulatedbyusingan NRC-approved scalingtechnique.Thisscalingtechniquewas validated for all four of the different17X17fueltypes,but notforthe15X15OFAand the VANTAGE+(w/IFMs)fuel.Notestingwas conductedtoverifythatthe scaling technique appliedtothe15X15 standardfuel;however, cycle 10 analyseshasshownthatthereis substantialdeparturefrom nucleete boiling ratio(DNBR)margin.Consequently,untilsuchtime asfueltestsare conductedonthe15X15VANTAGE+(w/IFMs)tovalidatethe scalingtechniqueand the applicability oftheWRB-1correlation,[it]is acceptableforthe upcoming cycle-,0only.Also,DNBanalyses must be submittedtothe staff for review and approval priortocycle 11." Westinghouse conducted confirmatoryDNBtestingonthe 15X1'5 VANTAGE+fuel designwithIFMsin December1998and January1999.The DNB test results were discussedwiththeNRCduringaMarch17,1999meeting.

documented this meetingina lettertotheNRCdatedMarch29,1999 (Reference8).The measured and predictedcriticalheatfluxfortherangeofthe experimental data wereusedto statistically determine the 95/95%DNBRlimit.Thetestdata yielded a limiting DNBRvalueof1.114,whichislessthantheWRB-1designlimitof1.17.The resultsofthis testing demonstrated thattheuseoftheWRB-1 correlationforthe 15X15 VANTAGE+fuelwithIFMswas conservative and confirmed its applicabilityforthisfueltype.

Westinghouse concludedthattheDNB tests verified the applicationoftheWRB-1 correlationwitha95/95 correlationlimitof1.17tothe 15X15 VANTAGE+fuel.Subsequently,inRefer,ence9theNRCissueda license amendment to remove a footnoteintheIP3 TSs stating"Current DNB analysis contains adequate margin forCycle10.Prior to achieving criticalityinCycle11,theDNB analysis must be reviewed and approvedbytheNRCstaff."Inthe associatedSER,theNRC staff stated:"TheNRC staff reviewedtheconditions of Amendment 175 safety evaluation and the presentation oftheDNBtestresults documented in a letterfromWestinghousedatedMarch29,1999.Therestrictioninthe footnote ofTSSection3.1 was intendedtoensurethat adequate DNBmarginwould exist on cycle-specificbasisuntilthefuel vendorPage2of8 SerialNo.09-5288 Docket Nos.50-305/3:36/423/338/339/280/281 Attachment demonstrated the applicability oftheWRB-1correlation tothe15X15VANTAGE+fueldesign.The staff reviewed the licensee's amendment requestandthe documentation oftheDNBtests pertormea by Westinghouse and determinedthat,becausethe newtestdata yielded a DNBR lowerthanthe bounding limit of 1.17,theWRB-1correlationis applicabletothe15X15VANTAGE+fuel;therefore,use oftheWRB-1 correlation is acceptablefor15X15VANTAGE+fuel beyondCycle10and removal ofthefootnoteisacceptable.TheDNBtesting obviates the needforusingthescalingtechnique;therefore,anyquestion astothe acceptability of thistechniqueisno longerrelevant."Thus,theNRCapprovedtheapplicationofthe Westinghouse WRB-1 correlation with 95/95 correlationlimitof1.17tothe15X15 VANTAGE+fuelwithIFMs.

Westinghouse submittedReference10totheNRC,which described evaluationsperformedforthe15x15Upgradefueldesign.Thissubmittalservedas Westinghouse notificationtotheNRC,asrequiredbytheSERon WestinghouseFuelCriteria EvaluationProcess(FCEP),thatthe NRC-approvedprocessin WCAP-12488-A (Reference11)wasusedforthevalidationoftheWRB-1DNBcorrellation applicability tothe15X15 Upgradefue!design.The Westinghouse FCEP specifies the guidelinesrelevantto determine correlation applicabilitytoanewgriddesign.In Reference 10, Westinghousepresentedtheresultsofthe evaluationprocessand concludedthattheWRB-1DNBcorrelationwith95/95correlationlimitof1.17andthe associated correlationrangesare acceptableforapplicationtothe15X15Upqradefuel assembly design.Dominion employed a two-stepprocesstoconfirmtwo necessary methodology elementsforanalysisofthe15x15Upgradedesign.First,itwas necessarytoconfirm the applicabilityofthe qualificationoftheVIPRE-DIWRB-1 qualification as documented in AppendixBof DOM-f\IAF-2-Atothe Westinghouse 15X15 Upgradefuelproduct.The second elementwasto supportremovalofthe13"gridspacingrestriction.Asafirststep,Dominionreplicatedthe Westinghouse evaluationofthe confirmatoryCHFtestdataandprovidedtheresultsofthisevaluationtotheNRCin References1and3.Reference 1 summarizedtheDominionresultsinnarrativeterms.

Reference3providedthedetailed numerical and technical descriptionofthe Westinghouse proprietary dataanddataanalysis.No significant differenceswerefoundbetweenthe Westinghouse and VIPRE-Dresults.Theapplicationof VIPRE-DIWRB-1 with H5/95DNBRlimitof1.17was demonstratedtobe conservativeforgrid spacingsof13"for15X15fuel(i.e.,15X15fuelwithIFMs).Thesecondstepoftheprocessappliesthe conclusionsofthe Westinghouse FCEP evaluationforthe15X15Upgradein Reference 10.Therefore,Dominionhasconcludedthatthe VIPRE-DIWRB-1designlimitof1.17and associated statisticscanbe conservativelyappliedtothesafetyanalysisofthe Westinghouse 15X15 Upgrade fuel productwithIFMs.Page3of8 SerialNo.09-5288 Docket Nos.50-305/336/423/338/339/280/281 AttachmentItiswith respecttothe'first step describedintheabove paragraphthattheNRC staff providedanRAIto completethereviewofthe proposed change in References1and3.Dominion's responsetotheRAI questionsisprovidedbelow.NRCQuestion1 11120109 supplement, page 4 of 8, Equation 2, reference is madetothe T-statistic test.It appears that this shouldbethe F-Statistictest.The same appliesinthe sentence above the equation,"comparing T statistic" should be"comparing F-statistic.

"DominionResponse Dominion understands thattheNRC staff requires clarificationofthe terminology used in Equation2and associated paragraphsonpage4of8of 3.Dominionutilizedthe F-Test to determine whether the variancesforthe WRB**1 databaseandthetestdataare equal as discussedonpage4of8ofthe supplemental material dated November20,2009.However, in Equation2,andinthe preceding and following sentences, referenceismadetothe"Tstatistic".The

'T"usedhere identifies the specific calculationofthe test statisticforuseinthe F-Testanddidnot refertotheuseofthe T-Testasis discussedonpage 5ofthe supplement.Ineach instanceonpage 4 where"T" or"T statistic"isused, substitute"F"or"Fstatistic",asshownbelow."The hypothesis is tested by comparingtheF statistic..."(2nd paragraph) 52"F=2 WRBI" (Equation 2)5test data"...since the F statisticislessthan..." (3fd paragraph)NRCQuestion2 11120109 supplement, Page 4 of 8, Table 1, row 5.(a)Is sigma cetcuteteo using nor N=n-1inthe denominator?(b)Whatisthe standard deviation corrected for?(c)The correction factor (n-1)IN are identically 1(one).What is accomplished by taking the square root of 1?DominionResponse The calculationoftheDNBRlimitas described in Table1of Reference3for Test 100 was arrangedinaformtobe consistentwiththe previously reviewed calculationofthe DNBR designlimitfor VIPRE-DIWRB-1 code/correlation as described in TableB.6-2in AppendixBofDOM-NAIF-2-A (Reference 2).Page4of8 SerialNo.09-5288 Docket Nos.

Attachment The qualificationofthe VIPRE-DIWRB-1 code/correlation in AppendixBof2-Autilized945datapointsfrom19test series(n).Normally,the number of degrees of freedom(N)wouldbethetotal numberofdataminusone(n-1).

However, because Westinghouse used these experimentaldatato correlatethe12 constants that appearintheWRB-1 correlation,thetotal number of degrees of freedom was corrected to account forthis.Thus, the standard deviationofthe database in Appendix B (aM/p)was corrected accordingly to accountforthisreduced number of degrees of freedom.EquationB.6.2of Reference2N=n-1-12 O"N=O"M/P'[(n-1)/N]%The DNBR designlimitforthetestdatafrom Test100with VIPRE-DIWRB-1 code/correlation is calculated as describedinTable1of Reference3.The calculations in Table1are identical to those described in TableB.6-2in AppendixBofA.In Table1,theStanclardDeviation(sigma)ofthetestdatais calculatedusingn-1.The number of degrees of freedomisthetotal numberofdataminusone.No additional correctiontothe degrees of freedom is necessary to accountforthe correlationofthe 12 constants.

Hence, the correctionfactor,(n-1)/N,is identically1(one).The specific responsestothe questionsarethen:(a)The standard deviationofthe sample population, sigma or aM/p, is determinedusingn-1inthe denominator.(b)The standard deviationofthe databasemaybe corrected to accountfora reduced number of degrees of freedom.The number of degrees of freedomisthetotal numberofdataminusone.No additional correction to the degrees of freedom is necessary to accountforthe correlationofthe 12 constants.Thus,for Test100,the number of degrees of freedom,N,is equalton-1.(c)The Corrected Standard Deviation, ON, is determined by multiplying the Standard Deviationofthesample, aM/p,bythe correction factor, which istheratioof(n-1)IN.Thevalueofthis correction factor is identically one.Thus,the Corrected StandardDeviationisequaltothe Standard Deviationofthe sample.The purpose of presenting the calculationofthe DNBR designlimitfor Test100as described in Table1of Reference3isto provide a calculation comparableinallwaystothe established method of TableB.6-2in AppendixBof DOM-NAF-2-A.Page5of8 SerialNo.09-5288DocketNos.

50-305/336/423/338/339/280/281 Attachment NRC Question 311/20/09supplement, Page 6 of 8, Figure 2.Thereis onlyonedata point for low quality<<-0.1)and only one pointforhigh quality (>0.2).Dominion Response The qualificationoftheVIPRE-DIWRB-1 code/correlation in AppendixBof2-Autilized945datapointsfrom19testseries.

Westinghouse conducted confirmatoryDNBtestingonthe15)(15fueldesign(withIntermediateFlowMixers)in December1998and January1999.Onlyonetestserieswasrun(Test100).ItistobeexpectedthattherangeforthelocalconditionsforTest100wouldbe smalleranda subset ofthoseinthe19testseries.

NRC Question 48/28/09submittal,page 2 of 6,thelastsentence ofthe4th paragraph provides the ranges of operationfortheVIPRE-Dcode.

Comparingtheserangeswiththeplots provided in attachment l'of supplemental information for DOM-NAF-2-A, one notes that discrepancy exists between the tabulated data and the plotteddataforboththeMass Flux and LocalQuality.The upperendrange oftheMassfluxisless

(-2.9),versusthe tabulated value of 3.7.Similarly,the upper end of the qualityislessthan

.2,whilethe tabulateddatais.3.Please provide a table containing the operational ranges ofthefuelinquestion.

Dominion Response AppendixBof DOM-NAF-2-A (Reference 2)documented the qualificationofthe WestinghouseWRB-1CHFCorrelationwiththe VIPRE-Dcodeandthe code/correlation departurefromnucleateboilingratio(DNBR)designlimits.

Appendix B provided therangeof applicationfortheVIPRE-DIWRB-1 code/correlation set:1440sPressures2490psia 0.9:S;MassFluxs3.7 Mlbm/hr-ff LocalQualitys0.30 LocalHeatFluxs1.0 Mbtu/hr-ft 2 The qualificationoftheVIPRE-DNVRB-1 code/correlation in AppendixButilized945datapointsfrom19testseries.

Westinghouse conducted confirmatoryDNBtestingonthe15X15fueldesign(with IntermediateFlowMixers)in December1998and January1999.Onlyonetestserieswasrun(Test100).Itistobeexpectedthattherangeforthe local conditionsforTest100wouldbesmallerandasubsetofthoseforthe19testseries.TheF-Testwasusedto demonstratethatthe variancesfortheWRB-1 databaseandtheTest100datawereequal.Thus,thetestdatacanbe conservatively consideredPage6of8 SerialNo.09-5288 Docket Nos.50-305/336/423/338/339/280/281 AttachmentaspartoftheWRB-1database,whichisalsothesame conclusion Westinghousereportedin Reference 8 fromperformingtheF-Test.

Therefore,therangeof applicability for VIPRE-DIWRB-1 will continuetobethatprovidedin DOM-NAF-2-A, Appendix B (Reference2),aslistedabove.NRCQuestion511/20/09supplement,Tebte 2onpage 7 of 8 of attachment 1,showsthe DNBRlimitforVIPRE-Dtobe 1.112whilethatfor VIPRE-Wis1.108.TheVIPRE-Dvalueismoreconservative.ButtneVIPRE-DIWRB-1has a DNBR of 1.17,whichismore conservative than 1.112.WhichDNBRvaluedoesDominion intendtouseinthe reload analysis?DominionResponse The F-Testwasutilizedto determine whether the variancesfortheWRB-1 databaseandthetestdataareequal.Itwas determinedthatthe variancesarethesame(i.e.,boththeWRB-1 databaseandtheadditionaltestdatahavethesame variability).

Thus,itis concludedthatthetestdatacanbe conservatively consideredaspartoftheWRB-1 database.Thisconclusionwasreachedby Westinghouse in Reference 8.The T-Testwasutilizedtocomparethemeansofthetwo populationswithequalvariance.The T-Testforthetestdatafailed,butwasfoundtobe conservativesincethemeanofthetestdatawas greaterthanthemeanofthe VIPRE-DIWRB-1 code/correlation of D0Iv1-NAF-2-A, AppendixB.The Westinghouse evaluation alsoinvolvedafailed T-Testforequalmeansin Reference8,butfoundit conservative withrespecttotheWRB-1database.Thus,DominionhasconcludedthattheDNBRdesignlimitof1.17forthe VIPRE-DIWRB-1 code/correlation as established in DOM-NAF-2-A, Appendix B (Reference2)is conservativewithrespecttoTest100.Further, Dominion concludesthataDNBRdesignlimitof1.17forthe VIPRE-DIWRB-1 code/correlationcanbeutilizedinthe applicatio-i to Westinghouse15X15Upgradefueldesign containing IFMgrids.Dominionwillusethisvalueinsafetyanalysisto supportreloadswiththe Westinghouse15X15Upgradefuel.

REFERENCES1.Letterfrom J.AlanPrice(Dominion)toNRC,"DominionEnergy Kewaunee, Inc., Dominion NuclearConnecticut,Inc.,VirginiaElectricAnd Power Company, Kewaunee PowerStation,MillstonePowerStationUnits2and3,NorthAnna PowerStationUnits1and 2,SurryPowerStationUnits1and2,RemovalofMixing VaneGridSpacingRestrictionin AppendixBtoFleetReport DOM-NAF-2-Evaluation of4x4DNB Testof15,,15 Vantage+withIFMsUsing VIPRE-DIWRB-1," dated August 28, 2009;Serial No.09-528.[ADAMS Accession No.ML092430338]Page7of8 SerialNo.09-5288DocketNos.

50-305/336/423/338/339/280/281 Attachment2.FleetReport,DOM-NAF-2,Rev.0.1-A,"ReactorCore Thermal-Hydraulicsusingthe VIPRE-D ComputerCode,"July2009.[ADAMSAccessionNo.

ML092190894]3.LetterfromJ.AlanPrice(Dominion)toNRC,"DominionEnergyKewaunee,Inc., Dominion NuclearConnecticut,Inc.,VirginiaElectricAndPowerCompany, KewauneePowerStation,MillstonePowerStationUnits2and3,NorthAnnaPowerStationUnits1andSurryPowerStationUnits1and2,RemovalofMixingVaneGridSpacingRestrictionin AppendixBtoFleetReport DOM-NAF-2-Supplemental Information," dated November20,2009;SerialNo.09-528A.

[Non-Proprietary ADAMS Accession No.ML093310330]

4.EmailfromPeter Tam(NRC)toGaryD.Miller

&CraigD.Sly(Dominion),"Dominion-MixingVaneGridSpacingRestriction submittals(TACME2321,2,3,4,5,6,and7),"dated December8,2009.[ADAMSAccessionNo.

ML093430415]5.EmailfromPeterTarn(NRC),"DominionFleetReport DOM-NAF-2-DraftRAI(TACME2321thruME232 7),"March9,2010.[ADAMS AccessionNo.ML 100700236]6.TopicalReport, VEP-NE-3-A,"QualificationoftheWRB-1CHF CorrelationintheVirginiaPower COBHACode,"July1990.7.LetterfromG.F.

Wunder(NRC/NRR)toJ.Knubel(NYPA),"Issuance of AmendmentforIndianPointNuclearGeneratingUnit NO.3 (TAe No.M97482),"July15,1997.

[ADAMSAccessionNo.

ML003779946]8.LetterfromH.A.Sepp (Westinghouse) to DocumentControlDesk(NRC)

NRC-99-5828),"NotificationofFCEP ApplicationforDNBTestingand RevalidationofWRB-1 Applicabilitytothe15x15 VANTAGE+FuelDesign, (Proprietary),"March29,1999.

..9.LetterfromG.F.

Wunder(NRC/NRR)toJ.Knubel(NYPA),"IndianPoint Nuclear GenerationUnitNo.3-Issuanceof AmendmentRE:Removalof Footnote from Technical Specifications(TACNO.MA5193)," September2,1999.[ADAMS Accession No.MLOO 3780850]10.Letterfrom Westinghouse(J.A.Gresham)toJ.S.

Wermiel(NRC),L TR-NRC-04-8,"FuelCriterionEva uationProcess(FCEP)Notificationofthe15x15 Upgrade Design," February6,2004.11.WCAP-12488-P-A,"'NestinghouseFuelCriteriaEvaluationProcess," October 1994.Page8of8