MONTHYEARML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0472021-12-23023 December 2021 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21200A1582021-07-16016 July 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ML21168A0042021-06-17017 June 2021 Notification of Inspection and Request for Information ML21137A1622021-04-26026 April 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060) ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20294A0642020-10-20020 October 2020 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML21033A8562020-08-0505 August 2020 NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091 ML20121A1262020-04-29029 April 2020 Radiation Safety Baseline Inspection Information Request ML20111A1212020-04-20020 April 2020 NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048 ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19252A4572019-09-0808 September 2019 (FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results ML19252A4092019-09-0606 September 2019 (E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2 ML19219A2132019-08-0707 August 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19162A3902019-06-11011 June 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12 ML19162A3912019-06-11011 June 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19092A1152019-04-0101 April 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirements for Safety Relief Valves (L-2019-LLA-0043) ML19092A1142019-04-0101 April 2019 NRR E-mail Capture - Brunswick Plant, Unit 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify TS 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (L-2019-LLA-0031) ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 2023-09-05
[Table view] |
Text
Gepford, Heather From: Sent: To: Attachments:
Grzeck, Lee [Lee.Grzeck@pgnmail.com]
Thursday, February 21, 2008 8:17 AM Heather Gepford Sampling Locations data updated 2-19-08.pdf; Updated 02-19-08 Well pictures with data and graphs.pdf Lee Grzeck Licensing and Regulatory Programs Brunswick Nuclear Plant Progress Energy Carolinas 910-457-2487 Work 910-412-0052 Pager 5/1 Marsh and River Tri'tium Sampling-Locations Updated 2/19/08 SProgress Energy
........I: JD ,I L 44]I Progress Energy Progress Energy
-3, 29'Progress Energy
" Progress Energy Progress Energy
--I Progress Energy Shallow Wells 17C, 20C, 24C, and 31C Near Pond 25,000 -20,0001-15,000 -..0.10,000 j 5,000 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08---cESS-17C -u-ESS-20C a, ESS-24C -e-ESS-31C Progress Energy
.Shallow Wells 18C, 19C, and 22C Near Pond 800,000 700,000 600,000 500,000-.400,000 .. .. ...0.300,000:7
, 200,000 ,..100,000 .* I Approx+,imateLowr Lmtof Detection25 i/0'4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08--ESS-18C -a-ESS-19C ESS-22C jProgress Energy Shallow Wells 23C, 26C, and 27C Near Pond 800,000 700,000 600,000 500,000 300,000 -200,000 100,000 .Aproximate Lower Limit of Detectio~n, 250 pCiIL 0 1 1 1 1 1 1 1 6/7/07 7/7/07 8/6/07 9/5/07 10/5/07 11/4/07 12/4/07 1/3/08 2/2/08 3/3/08--ESS-23C -a-ESS-26C sh ESS-27C SProgress Energy Shallow Wells-21C, 25C, and 28C Near Pond 4,800 4,200 3,600 3,000 2,400 g-0.1,800 1,200 600 0 5/8/07 6/7/07 7/7/07 8/6/07 9/5/07 10/5/07 11/4/07 12/4/07 1/3/08 2/2/08--ESS-21C -E-ESS-25C
-.-ESS-28C I --------------------------
I Note: Values less than the lowerlimit of detection are non-detectable I -eui Progress Energy Shallow Well 30C Near Pond-J 50,000 45,000 -40,000 .35,000.30,000 25,000.20,000 15,000 10,000 5,000 0 7/12/07 8/11/07 9/10/07 10/10/07 11/9/07 12/9/07 1/8/08 2/7/08-.-- ESS-30C 3/8/08 Progress Energy Latest Shallow Well Data Well: Well Depth (ft) Sample.Date SampleResultsW6 Ci/L).ESS-17C 26 2/11/08 4,766 ESS-18C 20 2/14/08 551,500 ESS-19C 20 2/11/08 508,900 ESS-20C 20.5 2/11/08 18,640 ESS-21C 20 1/15/08 546 ESS-22C 20 2/13/08 573,800 ESS-23C 23 2/14/08 234,400 ESS-24C 18 2/13/08 4,334 ESS-25C 22 1/16/08 <LLD ESS-26C 15 2/13/08 345,900 ESS-27C 15.5 2/14/08 264,300 ESS-28C 23 1/11/08 <LLD ESS-30C 15 2/13/08 2,930 ESS-31C 15 2/13/08 565 h Progress Energy Marsh Wells ij *PrgrssEnrg Progress Energy Marsh Wells at Gum Log Branch and Nancy's Creek-J U 0.500 -450 ..No 400 350 F 300 250 200 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08--ESS-GLB-1 -u-ESS-NC-1 -h-ESS-NC-2
--*-ESS-NC-3.
---ESS-NC-4 -.-ESS-NC-5 Progress Energy
-Latest Marsh Well Data Well Well Depth (ft) Sample DateT.i Sample Results pCiL)ESS-NC-1 7.5 2/12/08 294 ESS-NC-2 8 2/12/08 260 ESS-NC-3 8 2/12/08 <LLD ESS-NC-4 8 2/12/08 323 ESS-NC-5 8 2/12/08 <LLD ESS-GLB- 1 8 2/12/08 <LLD Progress Energy p I K I Progress Energy Intermediate Wells 17B, 18B, and 20B Near Pond 1,000 800 700 600 Dtcin 5 ~/o 500 400 300 200 100 0 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08--ESS-17B --u-ESS-18B -AESS-20B Note: Values less than the lower limit of detection are non-detectable Progress Energy-------- ---------------... .. ... .:: :,,
Intermediate Wells 21 B, 22B, 24B, and 25B Near Pond 1,000 900 800 700 600-L 0.500 400 300 200 100 0 f 01/18/07 04/28/07 08/06/07 11/14/07 02/22/08 06/01/08--a- ESS-21B -w- ESS-22B -*--ESS-24B
--ý ESS-25B Note: Values less than the lower limit of detection are non-detectable
Progress Energy Intermediate Well 19B Near Pond 24,000 22,000 20,000 18,000 16,000 14,000 Aproximate Lower LiiofDtcon25 i/L C) 12,000 0.10,000 8,000 6,000 4,000 2,000 0-04/28/07 08/06/07 11/14/07 02/22/08 06/01/08-4O-ESS-1 9B Progress Energy Latest Intermediate Well Sample Data Well Well Depth (ft): Sample Date Sample ReSults (pqi/L)ESS-17B 53 2/11/08 <LLD ESS-18B 63 2/14/08 <LLD ESS- 19B 42 2/11/08 17,620 ESS-20B 43 2/11/08 <LLD ESS-21B 67 2/13/08 <LLD ESS-22B 76 2/13/08 <LLD ESS-24B 53 2/13/08 <LLD ESS-25B 43 1/16/08 <LLDProgress Energy Progress Energy Deep Wells 17A, 24A, and 27A Near Pond 5 0 0 : ' ...... ;: 450 400 300-o -a. 250 200 150 100 50 Tritium is non -detectable in all deep 0 3/9/07- 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1V2 I/08 2/22/08 4/12/08-c- ESS-24A --ESS-27A 0 Progress Energy Latest Deep Well Sample Data Wel el Dpt (t)Sample Date Tritium Sample Reut pCi/L)ESS-17A 150 2/11/08 <LLD ESS-24A 140 2/13/08 <LLD ESS-27A 140 2/14/08 <LLD.Progress Energy Progress Energy Wells 3B, 3C, 13B, and 13C 1,800 1,500 1,200-.900 600 300 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 I *- ESS-1 3C -a- ESS-3C -* ESS-3B -mn ESS-1 3B Progress Energy Miscellaneous Wells-1 Well Well Depth (11) Sample Date Tritium Sample Results Ci/L)ESS-3B 52.4 1/16/08 894 ESS-3C 14.3 1/16/08 288 ESS-13B 56.5 1/16/08 <LLD ESS-13C 24.8 1/16/08 258 Progress Energy s Progress Energy Switchyard Area Wells from Historical Radwaste Line Leak, Well 2C 2,000,000 1,900,000 1,800,000 1,700,000 1,600,000 0. 1,500,000 1,400,000 1,300,000 1,200,000 1, 100,000 1,000,000 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08-4--ESS-2C SProgress Energy Switchyard Area Wells from Historical Radwaste Line Leak, Well 16 70,000 60,000 "" 50,000 0 40,000 30,000 10,000 0 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08-U-ESS-16C jProgress Energy Miscellaneous Wells-2 Well Well Depth (ft) Sample Date Tritium Sample Results (pCi/L ESS-2C 23 2/18/08 1,575,000 ESS-16 25.4 2/15/08 64,220 Progress Energy