MONTHYEARML24318C3272024-10-24024 October 2024 Email Regarding Clarification Question on NRCs Review of the FCS DQAP Revision ML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review 2024-10-09
[Table view] |
Text
r. Rill From Sent: To: SubjE Schwarz, Jon Don.schwarz@nebraska.gov]
Wednesday, June 22, 2011 1:58 PM Ryan Laurel ; Maier, Bill FW: Daily Event Status at Fort Calhoun ct: From: Schwarz, Jon Sent: Wednesday, June 22, 2011 1:56 PM To: Berndt, Al; Imler Earl; Newsham, Cindy; Fawl, Jodie; Jansky Doris ; Jensen Danielle ; Loos Jerry ; Moon Guy; Willson Ginger Cc: Cook Bryan
Subject:
FW: Daily Event Status at Fort Calhoun FYI... Status for Fort Calhoun: Also, if people have questions concerning the Nuclear Power Stations, they can go to OPPD.com or NPPD.com as most answers are there. For instance, the question has been asked as to why there is a "No-Fly Zone" over the nuclear power stations and the answer is because the FAA restricted the area due to the flooding.
This info is available on the OPPD and NPPD websites.From: BERCK, ALLEN [1]
Sent: Wednesday, June 22, 2011 7:40 AM To: dpott.ema@pottcounty.com';
Bill Pook; Dan; Eric Plautz; Jeff Clark; Jeff Theulen; Schwarz, Jon; 'Stodola, Kathy[HSEI ID]'; KIRKLAND, JOHN NRC; Larry Oliver; Laurel Ryan; Paul Johnson; Whitney Shipley; 'Rasmusson, Melanie'Cc: GEBERS, STEVEN W; DEANGELIS, PETER A; HANKINS, RHONDA R; MOELLER, CHRISTOPHER J; RELLER, MARK H;SILKE, DEENA L; BERCK, ALLEN
Subject:
Daily Event Status at Fort Calhoun The Corps of Engineers announced:
last night:.that they would raise,: river release. rates to 1 RO0,&O cfs minthe next 2days., Th.is was anticipated by: the station, and: no. new actions are nceeted.For rt Calhoun Flooding Status (changes from yesterday's report are in bold)21.3.1 1 4!'5.6.7.I.8.9.Reactor Status: Shutdown Reactor is covered with > 23-ft of cooling water Offsite power and Emergency Diesel Generators are available.
Both vital buses are energized at this time.Spent Fuel Pooling cooling is in service and protected.
Shutdown cooling is in service and protected Current river level is 1006' 5" -a change in 5" in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.Current Blair gauge level is 32.4 ft. A rise of 3 inches is forecasted (by the NWSlUSACE) within the next 5 days and river conditions continue to change. Heavy rains were received overnight in the watershed area. We are continuously monitoring river conditions.
The site has implemented procedures to protect power supplies and vital equipment.
Water is onsite, and flood barriers are protecting vital 0 1 1 in this record was deleted No release of radioactivity has occurred.
in accordance with thereedow of information I Act, exempt-ons_
f Of FOWA.
1 10. Fort Calhoun has declared a Notification of Unusual Event at 08:00 6/6/11.1. Backup evacuation route onsite is inundated however the primary route onsite is passable and not expected to be affected.12. Power was removed from siren 257 and 260 in Pottawattamie Co. IA, which is just on the edge of the 10-mile EPZ south east of the plant. Siren 75, 76 in Desoto National Wildlife Refuge have no power. Currently the refuge is closed due to flooding.
Siren 142 in Harrison Co. has no power which is north of Loveland IA -9.5 miles from the plant. Siren 1 east of Fort Calhoun on county road 34 between Fort Calhoun and Boyer Chute Recreational Area is without power. This area is closed due to flooding.
Power was removed to two additional sirens in Washington County -sirens 69 and 73 are removed from service due to flooding and may require route alerting for any non-evacuated residents.
These sirens are close to the river and are primarily cover areas that have been evacuated.
13.At this time no known major evacuation routes are affected without contingency actions planned. Interstate 29 in both directions:
from Exit 54A (G Avenue) to Exit 71 (1-680 exit): 1-680 road closed to traffic because of flooding -- follow the detour signs for the evacuation route to Bellevue.
Interstate 680 in both directions:
from before Exit 1 1 30th Street to Exit 62: 1-29; Old Mormon Bridge Road -- road closed because of flooding.14. On 6/14, Washington County issued evacuation to approximately 75 residents northeast of Blair east of county road 33 to the Burt County line.Req ested lnfOrnation from states and counties: Vý hen offsite evaluaftion ri:o0utes, are :affected please contact emergency planning.2. When the Blair WWater plant is affected p:lease contact emergency planning.3. Authorized:
power outages that affect or couldaffect siren-operability, please contact emergency planning.The Iriver flow rate and level have been relatively constant at Blair NE. The Corp of Engineers is releasing Gavin's Point dam at 150,400 cubic feet per second (cfs).Emergency Planning Contacts at FCS: Steve Gebers:] Pager (b)(6)" , Z§Work Phone: 402-533-7308:
j !:iCell Phone(b)(6), Allen Berck: ,. .f,' P age.r: b)(6) } ,., .: ... .Worl Phone: 402-6 836_GCell phone: (Allen D. Berck Supervisor
-Emergency Planning Fort Calhoun Station Oma ja Public Power District phonle: 402-533-6064 email: aberck oppd.com 2