IR 05000348-12-405 and 05000364-12-405, on 08/16/2012, J. M. Farley Nuclaer Plant- U.S. Nuclear Regulatory Commission Inspection Procedure 95001 Supplemental and Closed Regulatory Performance and Annual Assessment Meeting
ML12258A401
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/14/2012
From: Desai B B
NRC/RGN-II/DRS/PSB2
To: Lynch T A
Southern Nuclear Operating Co
References
IR-12-405
Download: ML12258A401 (5)


Text

Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled. September 14, 2012

Mr. T. Vice President

Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant

P.O. Drawer 470, BIN B500

Ashford, AL 36312

SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000348/2012405 AND 05000364/2012405, AND CLOSED REGULATORY PERFORMANCE AND ANNUAL ASSESSMENT MEETING

Dear Mr. Lynch:

On August 16, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed a supplemental inspection pursuant to Inspection Procedure 95001, "Inspection for One or Two Greater than Green Inputs in a Strategic Performance Area," at your Farley Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results which were discussed at the exit meeting on August 16, 2012, with Mr. and other members of your staff.

As required by the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed because a finding of Greater than Green safety significance was identified in the 4th quarter of 2011. The violation was previously documented in a Final Significance Determination for a Security-Related Greater than Green Finding and Notice of Violation; Farley Nuclear Plant, NRC Inspection Report 05000348, 364/2011202, dated April 16, 2012. The NRC staff was informed on May 21, 2012, of your staff's readiness for this inspection.

The objectives of this supplemental inspection were to provide assurance that: (1) the root and the contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes. The inspection consisted of examination of activities conducted under your license as they related to safety, compliance with the Commission's rules and regulations, and the conditions of your operating license. The inspectors determined that your staff performed a comprehensive evaluation of the Greater than Green finding.

Your staff's evaluation identified the primary root cause associated with the finding to be: (1) Licensee did not provide adequate management oversight of the target set analysis process to ensure changes in procedures/processes improved with increasing standards.

Your staff also identified two contributing causes associated with the finding as: (1) Human performance deficiency existed in the lack of use of Knowledge Worker Tools when performing target set analysis; and (2) Lack of use of Performance Improvement tools (i.e., Self-assessment, and operating experience).

The NRC determined that the root cause and correc tive actions taken to address the violation and prevent recurrence appear to be adequate. The inspection objectives of IP 95001 have been satisfied. The Greater than Green finding for the failure to maintain complete and accurate Target Sets in accordance with regulatory requirements is considered closed.

Based on the results of this inspection, no findings were identified.

Additionally, as discussed in the NRC meeting announcement dated June 11, 2012, a Regulatory Performance meeting was conducted on August 16, 2012, to discuss the results of the Annual Assessment letter issued on March 5, 2012. The NRC exit meeting and the Regulatory Performance meeting were not open to the public.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), t he NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response ASecurity-Related Information B Withhold Under 10 CFR 2.390

@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/ Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-348, 50-364 License No. NPF-2, NPF-8

Enclosure:

Inspection Report 05000348/2012405 and

05000364/2012405 w/Att.: Supp Info. (OUO) cc w/encl.: (See page 4)

ML12258A401 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 HQ: NSIR RII: DRP/BR2 SIGNATURE RA/JS RA/BB For BD RA/DJ RA/MM For FE NAME J. SHEHEE B. DESAI D. JOHNSON F. EHRHARDT DATE 09/11/2012 09/14/2012 09/11/2012 09/13/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/Encl.:

Keith Wooten

Project Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

David Burford Manager Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242 L. B. Hogg Nuclear Licensing

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway

Birmingham, AL 35242 S. P. McGavin Security Manager

Joseph M. Farley Nuclear Plant

7388 North State Highway 95 Columbia, AL 36319