ML13192A031

From kanterella
Revision as of 04:14, 14 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
R.E. Ginna, Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations
ML13192A031
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/05/2013
From: Alexandra Smith
Constellation Energy Group, EDF Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2013-06
Download: ML13192A031 (2)


See also: RIS 2013-06

Text

Adriene Smith Manager, Nuclear Training Department

CENGOM a joint venture of 0 Constellation

" Energy, eDF R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364

585.771.5214

Adriene.Smith@cengllc.com

July 5, 2013 U.S. Nuclear Regulatory

Commission

Washington, DC 20555-0001

ATTENTION:

SUBJECT: Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2013-06, Preparation

and Scheduling

of Operator Licensing

Examinations

Attached you will find NRC Form 536 providing

R.E. Ginna Nuclear Power Plant's expected license examination

schedule information.

Should you have any questions, please contact Mr. Kyle Garnish, General Supervisor, Operations

Training at 585-771-5321.

SiAncerely, Adriene Smith KC Enclosure:

Operator Licensing

Examination

Data, Form 536 (1 page)

NRC FORM 536 U. S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES- 09130/2014

0M.2011) Eslimated

burden per response to cornpy wi th s voluntary

inom,.atbon

collecton

request I hour. This intormation

cotlection

is used to plan budgets aid resourmes

for operator examsnations.

Send comments regarding

burden estimate to the Infomation

Services Branch OPERATOR LICENSING

(7-5 F53). U.S. Nuclear Regulatory

Coissio, Washington, DC 2055,50001, or by intemet e-EXAMINATION

DATA "m to rnfocol9tMResource@=.gov, and to the Desk Officer, Oden of lnrmao ad Regulatory

Affairs, NEOB-10202, (3150-0131), Office of Management

and Budget, Washington, DC 20503. It a nmeans used to Ipose an nformation

cotlection

does not display a curretly vaftd OMB contol nurber, the NRC may not conduct or sponsor. and a person Is not required to respond to, ihe information

collection.

FACILITY NRC REGION R.E. Ginna Region I A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED

NUMBER OF LICENSEE-PREPARED

0 1 0 1 EXAMINATIONS

ESTIMATED

NUMBER OF NRC-PREPARED

0 0 0 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY 2015 CY.20.16 CY*2017 CY 2018 NUMBER OF REACTOR 0 10 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 7 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 10/10/2016

10/08/2018

ALTERNATE

DATE 10/03/2016

10/01/2018

C. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE NRC FORM 536 (09-2011)