Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations
ML13192A031
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/05/2013
From: Alexandra Smith
Constellation Energy Group, EDF Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2013-06
Download: ML13192A031 (2)


Text

Adriene Smith Manager, Nuclear Training Department R.E. Ginna Nuclear Power Plant, LLC CENGOM a joint venture of 1503 Lake Road Ontario, New York 14519-9364 585.771.5214 Adriene.Smith@cengllc.com 0 Constellation "

Energy, eDF July 5, 2013 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations Attached you will find NRC Form 536 providing R.E. Ginna Nuclear Power Plant's expected license examination schedule information.

Should you have any questions, please contact Mr. Kyle Garnish, General Supervisor, Operations Training at 585-771-5321.

SiAncerely, Adriene Smith KC

Enclosure:

Operator Licensing Examination Data, Form 536 (1 page)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES- 09130/2014 0M.2011) Eslimated burden per response to cornpy wi ths voluntary inom,.atbon collecton request I hour. This intormation cotlection is used to plan budgets aid resourmes for operator examsnations. Send comments regarding burden estimate to the Infomation Services Branch OPERATOR LICENSING (7-5 F53). U.S. Nuclear Regulatory Coissio, Washington, DC 2055,50001, or by intemet e-EXAMINATION DATA "mto rnfocol9tMResource@=.gov, andto theDeskOfficer, Oden of lnrmao ad Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ita nmeans used to Ipose an nformation cotlection does not display acurretly vaftdOMB contol nurber, the NRC may not conduct or sponsor. and a person Is not required to respond to, iheinformation collection.

FACILITY NRC REGION R.E. Ginna Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY.20.16 CY*2017 CY 2018 NUMBER OF REACTOR 0 10 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 7 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/10/2016 10/08/2018 ALTERNATE DATE 10/03/2016 10/01/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (09-2011)