MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
1 NRR-PMDAPEm Resource From:Dietrich, Allison Sent: Wednesday, January 11, 2017 3:16 PM To:hlkish@aep.com Cc: Terry L Curtiss (tlcurtiss@aep.com)
Subject:
DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - ACCEPTANCE REVIEW OF LAR TO REVISE TS 3.9.3 (CAC NOS. MF8931 AND MF8932)
Attachments:
Supplemental Information Requ est D.C. Cook MF8931 MF8932.pdfBy letter dated December 14, 2016 (Agencywide Documents Access and Management System (ADAMS Accession No. ML16351A198), Indiana Michigan Power Company (I&M, the licensee), submitted a license amendment request (LAR) for the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2. The proposed amendments would revise the Limiting Condition for Operation (LCO) note in CNP Technical Specification (TS) 3.9.3, "Containment Penetrations."
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that the information delineated in the attachment to this e-mail is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment.
In order to make the application complete, the NRC staff requests that I&M supplement the application to address the information requested in the attachment. This will enable the NRC staff to complete its detailed technical review.
Please contact me to arrange a teleconference with the NRC staff within the next 5 working days to discuss the attached request for supplemental information.
Sincerely, Allison W. Dietrich, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-2846
Hearing Identifier: NRR_PMDA Email Number: 3265 Mail Envelope Properties (Allison.Dietrich@nrc.gov20170111151600)
Subject:
DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - ACCEPTANCE REVIEW OF LAR TO REVISE TS 3.9.3 (CAC NOS. MF8931 AND MF8932) Sent Date: 1/11/2017 3:16:11 PM Received Date: 1/11/2017 3:16:00 PM From: Dietrich, Allison Created By: Allison.Dietrich@nrc.gov Recipients: "Terry L Curtiss (tlcurtiss@aep.com)" <tlcurtiss@aep.com> Tracking Status: None "hlkish@aep.com" <hlkish@aep.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2408 1/11/2017 3:16:00 PM Supplemental Information Request D.C. Cook MF8931 MF8932.pdf 565641 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
DRAFTREQUEST FOR SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.9.3, CONTAINMENT PENETRATIONS INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-315 AND 50-316 CAC NOS. MF8931 AND MF8932By letter dated December 14, 2016, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML16351A198), Indiana Michigan Power Company (I&M, the licensee), submitted a license amendment request (LAR) to revise the Donald C. Cook Nuclear Plant (CNP) Unit Nos. 1 and 2, Technical Specifications (TSs). The proposed change would revise the Limiting Conditions for Operation (LCO) note in CNP TS 3.9.3, "Containment Penetrations."
CNP TS LCO 3.9.3 contains the following note:
Penetration flow path(s) providing direct access from the containment atmosphere to the outside atmosphere via the auxiliary building vent may be unisolated under administrative controls.
This note applies a restriction of allowing only those containment penetrations that flow through the auxiliary building vent to be unisolated during movement of irradiated fuel within containment. The licensee proposes to remove this restriction by deleting, "via the auxiliary building vent," from the note. This proposed change would then allow all containment penetrations to the outside atmosphere to be unisolated under administrative controls.
The LAR states:
Removal of that restriction is appropriate because the FHA [fuel handling accident] analysis contained in the license amendment request (LAR) to adopt full-scope alternative source term (AST) (Reference 4), which was recently approved by the U. S. Nuclear Regulatory Commission (NRC) (Reference 7), no longer assumes that activity released from containment goes through the auxiliary building vent. Therefore, l&M requests to remove the stipulation in the LCO Note that limits administrative controls only to those containment penetrations exiting to the outside atmosphere through the auxiliary building vent.
The NRC-approved AST for the FHA in containment does assume that the release is not filtered and is released directly to the environment over a two-hour period from a point on the external containment surface closest to the control room intakes. In addition, the NRC-approved AST analysis for the FHA in the auxiliary building assumes that the fuel handling area exhaust ventilation is in service. However, the current NRC-approved AST FHA analysis does not assume that the FHA in containment is released within a two-hour period into the auxiliary building, and it does not credit the non-safety related auxiliary building ventilation system.
DRAFTTitle 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.36 requires that the TSs be derived from the analyses and evaluation included in the safety analysis report. The two analyzed accidents of FHA in containment and FHA in the auxiliary building do not support the proposed change to CNP TSs because they do not analyze a release into the auxiliary building without the auxiliary building general ventilation system in service, due to it being a non-safety related system.
Provide an FHA analysis that meets the limits in 10 CFR 50.67, is consistent with Regulatory Guide 1.183, and assumes that the FHA in containment is released within a two hour period into the auxiliary building. Include in the analysis the amount of in-leakage into the control room from the auxiliary building that is due to operator ingress and egress.