Letter Sequence Supplement |
---|
|
|
MONTHYEARML17061A2622017-02-27027 February 2017 Purdue University - Submittal of License Amendment Request Project stage: Request ML17061A2642017-02-28028 February 2017 Purdue University - License Amendment Request - Technical Specifications Project stage: Request ML17061A2652017-02-28028 February 2017 Purdue University - License Amendment Request - Technical Specifications Project stage: Request ML17080A4492017-03-28028 March 2017 Summary of March 16, 2017, Public Meeting with Purdue University Regarding License Amendment Application for an All-Digital Instrumentation and Control Reactor Console Project stage: Meeting ML17104A1562017-04-27027 April 2017 Purdue University - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Digital Control and Instrumentation Upgrade Project stage: Acceptance Review ML17143A4652017-06-13013 June 2017 April 24, 2017, Summary of Public Meeting with Purdue University Regarding License Amendment Application for an All-Digital Instrumentation and Control System Project stage: Meeting ML17172A6352017-06-21021 June 2017 Purdue University - Supplemental Documentation - Submission of License Amendment Request, Enclosed Documents Include Cyber Security Plan and Cyber Security Procedure Project stage: Supplement ML17142A3952017-07-26026 July 2017 Purdue University Acceptance of Requested Licensing Action Amendment Request for Digital Control and Instrumentation Upgrade Project stage: Acceptance Review 2017-04-27
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000182/20244102024-09-0606 September 2024 Purdue University - U.S. Nuclear Regulatory Commission Security Inspection Report 05000182/2024410 ML24162A2312024-06-10010 June 2024 Purdue Univ., Notification of Change in Operator Status for OP-505673 ML24162A2292024-06-10010 June 2024 Purdue Univ., Notification of Change in Operator Status for OP-505672 ML24162A2302024-06-10010 June 2024 Purdue Univ., Notification of Change in Operator Status for OP-505670 ML24089A2422024-03-29029 March 2024 Purdue Univ., Submittal of 2023 Annual Report ML24024A2472024-02-10010 February 2024 Examination Report No. 50-182/OL-24-01, Purdue University ML24024A2462024-02-10010 February 2024 Examination Results No. 50-182/OL-24-01, Purdue University ML23268A0752023-09-18018 September 2023 Purdue Univ., Submittal of Revised License Renewal Request ML23227A2462023-08-16016 August 2023 Examination Confirmation Letter No. 50-182/OL-24-01, Purdue University ML23171B0272023-06-13013 June 2023 Purdue Univ., Reply to Notice of Violation in NRC Inspection Report 05000182/2023201 IR 05000182/20232012023-05-23023 May 2023 Purdue University - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000182-2023201 and Notice of Violation ML23090A2012023-03-31031 March 2023 Purdue Univ., Submittal of 2022 Annual Report ML22238A2492022-09-0808 September 2022 Examination Confirmation Letter No. 50-182/OL-23-01, Purdue University IR 05000182/20212042021-12-0202 December 2021 Purdue University U.S. Nuclear Regulatory Commission Follow-Up Safety Inspection Report 05000182/2021204 ML21306A1602021-11-11011 November 2021 Examination Confirmation Letter No. 50-182/OL-22-02, Purdue University ML21267A4272021-09-21021 September 2021 Purdue Univ., Reply to Notice of Violation in NRC Special Inspection Report No. 05000182/2021202 ML21267A4052021-09-14014 September 2021 Purdue Univ., Reply to Notice of Violation in NRC Special Inspection Report No. 05000182/2021203 IR 05000182/20212032021-07-29029 July 2021 Purdue Safety HP - Safety Inspection Report No. 05000182/2021203 and Notice of Violation IR 05000182/20212022021-07-28028 July 2021 Purdue University Nuclear Regulatory Commission Security Inspection Report No. 05000182/2021202 (Cover Letter) ML21173A3102021-06-25025 June 2021 Purdue University Additional Training Preformed in Lieu of Annual Operating Test ML21153A4272021-06-24024 June 2021 Examination Confirmation Letter No. 50-182/OL-21-01, Purdue University ML21172A1562021-06-0303 June 2021 Request to Compensate for a Missed Annual Operating Test by Utilizing 10 CFR 55.59(b) for SOP-70830 at Purdue Univ ML21148A1132021-05-0707 May 2021 Update to Facility Personnel at Purdue University Reactor, PUR-1, Docket 50-182 ML21139A1242021-05-0707 May 2021 Update to Facility Personnel at Purdue University Reactor, PUR-1, Docket 50-182 IR 05000182/20212012021-05-0606 May 2021 Purdue University, Routine Safety Inspection 050182/2021201 ML21118A0232021-03-31031 March 2021 Purdue University - Report on Reactor Operations for the Period January 1, 2020 to December 31, 2020 IR 05000182/20202012021-02-16016 February 2021 Purdue University Reactor Notice of Violation and Special Inspection Report 05000182/2020-201 ML21029A0562021-01-21021 January 2021 Purdue University Reactor, Update to Facility Personnel ML21035A0142021-01-0606 January 2021 Response to Apparent Violations in NRC Special Inspection Report 05000182/2020201 ML20336A3242020-12-11011 December 2020 Purdue University - Issuance of Amendment No. 16 to Renewed Facility Operating License No. R-87, for the Purdue University Research Reactor to Modify the Technical Specifications to Allow Startup of the Purdue University Reactor to Calibrat ML20332A0832020-12-0707 December 2020 Purdue University, Special Inspection Report 05000182/2020201 ML20330A2312020-11-27027 November 2020 Purdue University - Acceptance of the Application for a License Amendment Modification of Technical Specifications to Allow Startup of the Purdue University Reactor to Calibrate Nuclear Instrumentation (EPID A11010//L-2020-PPM-0000) ML20337A1042020-11-24024 November 2020 Purdue University Submission of License Amendment Request, PUR-1, Docket 50-182 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20311A2642020-11-0303 November 2020 Purdue Univ. School of Nuclear Engineering - Written Conveyance of 14-Day Special Report, PUR-1 ML20045E4522020-02-18018 February 2020 Purdue University - Acknowledgement of Withdrawal of the Application for a License Amendment Request for Management Chain Change ML20038A2872020-02-0606 February 2020 Purdue University - Withdrawal of License Amendment Request, PUR-1, Docket 50-182 - Management Chain ML20017A2632020-01-17017 January 2020 Purdue University, Indiana - Letter Regarding Dean Mung Chiang New Position Assignment as a Science and Technology Adviser to the Secretary of State ML19345F2712019-12-11011 December 2019 Examination Confirmation Letter No. 50-182/OL-20-01, Purdue University ML19345F3782019-12-11011 December 2019 Examination Confirmation Letter No. 50-020/OL-20-01, Massachusetts Institute of Technology IR 05000182/20192022019-10-30030 October 2019 Purdue University U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000182/2019-202 ML19274C4472019-10-0808 October 2019 Examination Report No. 50-182/OL-19-01, Purdue University ML19142A2722019-05-24024 May 2019 Purdue University - Issuance of Amendment No. 15 Regarding Implementation Date Change for Licensing Amendment No. 14 for Facility Operating License No. R-87 ML19143A3842019-05-21021 May 2019 LAR Implementation Extenstion - PUR1 - 20190521 ML18262A4342019-04-0101 April 2019 Purdue University Transmittal Letter for Issuance of Amendment No. 14 to Renewed Operating License No. R-87 for the Purdue University Research Reactor Digital Instrumentation Control Upgrade IR 05000182/20192012019-03-20020 March 2019 Purdue University - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000182/2019-201 ML18282A1912018-10-0505 October 2018 Purdue University - Interlock Language Retention in Technical Specification Submission Supporting License Amendment Request, PUR-1, Docket 50-182 IR 05000182/20184102018-09-26026 September 2018 Purdue University - Transmittal Letter Regarding U.S. Nuclear Regulatory Commission Security-Related Inspection Report No. 05000182/2018-410 ML18263A1572018-09-20020 September 2018 Purdue University - Revisions to Technical Specification Submission Supporting License Amendment Request, PUR-1, Docket 50-182 ML18134A1612018-05-14014 May 2018 Purdue University - Notification of Level 1 Personnel Change 2024-09-06
[Table view] |
Text
SCHOOL OF NUCLEAR ENGINEERING School of Nuclear Engineering Nuclear Engineering Building
-2017 (765) 494-5739
Cindy Montgomery U.S. NRC One White Flint North 11555 Rockville Pike Rockville, MD 20852
June 21, 2017
SUBJECT:
Supplemental Documentation
- Submission of License Amendment Request (ML17061A262), PUR-1, Docket 50
-182 Dear Ms. Montgomery
, This letter and attached documents are to support the License Amendment Request for the PUR-1 license , Docket 50-182. The documents enclosed are the Functional Requirements Specification, Cyber Security Plan, and Cyber Security Procedure. The Cyber Security Plan and Cyber Security Procedure primarily apply to the development, design, and testing stage of the PUR-1 I&C replacement project. Cyber needs following licensure are included in Section 7.9 of the initial amendment request submission. The team preparing the Safety Evaluation Report may find these documents useful in their review.
Three attachments to this letter are being withheld from public disclosure under 10 CFR 2.390 due to security related information being shared which may compromise the PUR
-1 or the vendor who designed the system. Those documents protected under 10 CFR 2.390 have been duly redacted. The non
-redacted versions are marked on all pages. This letter itself does not contain security related sensitive information.
The following paragraphs justify the redactions with language taken from Regulatory Issue Summary 2005
-31.
In the Functional Requirements Specification, Redactions 1
-17 are withheld as the identify the exact locations of radioactive material, inventory of radionuclides, information on inventories of enriched uranium above 6% U
-235, and the form of the U
-235. Redactions 18 and 19 are withheld as they contain information on specific or predicted failures in the design of structures or equipment. Redactions 20
-23 are withheld as they contain security information which could reasonably be expected to be useful to potential adversaries as vulnerability locations.
The Cyber Security Plan and Cyber Security Procedure are withheld as they contain information which could reasonably be expected to be useful means of determining the method by which information is moved to and from the new control console (non
-secure to secure system). These movements and their procedures could be useful to potential adversaries as vulnerability locations.
School of Nuclear Engineering Nuclear Engineering Building
-20 17 (765) 494-5739
-9570
The PUR-1 Reactor Protection System is designed to initiate a scram on the indication of any value in excess of those prescribed in the Technical Specifications. The magnet power circuitry passes through relays in series which will remove a closed contact point thereby opening the circuit and causing the control rods to fall into the core under the force of gravity.
Drawing PUR1
-HDD-001-16 shows the magnet power circuitry. The current runs from the magnet power supply (an Acopian current supply) through the following units and returns to the current supply.
- 1. Magnet Power Supply
- 2. Pool top radiation area monitor
- 3. Reactor Operator Console Radiation Area Monitor
- 4. Water Make
-up Radiation Area Monitor
- 5. Continuous Air Monitor
- 6. Console Key
-switch 7. Reactor Control System PLC
- 8. Channel 1 (Start
-up Channel) Change Rate Trip
- 9. Channel 2 (Log Power Channel) Power Level Trip
- 10. Channel 2 (Log Power Channel) Change Rate Trip
- 11. Channel 2 (Log Power Channel) Loss of Detector High Voltage Loss Trip
- 12. Channel 3 (Linear Power Channel) High Power Trip
- 13. Channel 4 (Safety Channel) High Power Trip
- 14. Manual Scram (Hallway)
- 15. Manual Scram (Operator Console)
- 16. Shim Safety #1 Magnet
- 17. Shim Safety #2 Magnet
- 18. Magnet Power Return Any relay located in items 2-15 may interrupt the circuit and cause magnet power to be lost.
The Channel block diagrams are also included as supplement to this submission. For Channel 1, Drawing PJ0000396 P21 ed.2 shows the fission chamber's signal propagating through the DWK 250 and the final provided trip out of the NB28 module. Other binaries are provided (BO1.1
-BO1.5) and are all monitored by the PLC. For Channel 2, Drawing PJ0000396 P22 ed.1 shows the compensated ionization chamber signal and the trips associated. These trips again come from a NB28 module. Similar block diagrams for Channel 3 (Drawing PJ0000396 P23 ed. 1) and Channel 4 (Drawing PJ0000396 P24 ed. 1)
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge. Executed on June 21 , 2017.
School of Nuclear Engineering Nuclear Engineering Building
-20 17 (765) 494-5739
-9570
Clive Townsend
PUR-1, Reactor Supervisor School of Nuclear Engineering
Enclosure s: PUR-1 Functional Requirements Specifications
- Revision 4 (Nonpublic)
PUR-1 Functional Requirements Specifications
- Revision 4
- Redacted (Public) PUR-1 Cyber Security Plan (Nonpublic)
PUR-1 Cyber Security Procedure (Nonpublic)
Drawing PUR1
-HDD-001-16 (Nonpublic)
Drawing PJ0000396 P21 E d.2 (Public) Drawing PJ0000396 P22 Ed.1 (Public) Drawing PJ0000396 P23 Ed.1 (Public) Drawing PJ0000396 P24 Ed.1 (Public)