ML17205A232

From kanterella
Revision as of 18:49, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2017 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
ML17205A232
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Seymour J L
Operations Branch III
To:
Point Beach
Shared Package
ML16319A340 List:
References
Download: ML17205A232 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-l Facility: Poi,t B¿ach N^rl¿rr Pl^"1 Date or Examination:

E/g/l-St/n Developed by: Written: Facilif K NRC// Operating Facility NRC Target Date*Task Description (Reference)

Chief Examiner's lnitials-180 1. Examination administration date confirmed (C.1.a; C.2.a and b)?-1 50 2. NRC examiners and facility contact assigned (C.1.d; C.2.e)?-1 50 3. Facility contact briefed on security and other requirements (C.2.c)?-1 50 4. Corporate notification letter sent (C.2.d)9/l-1201 5. Reference material due (C.1.e; C.3.c; Attachment 3)N/n{-e0}b.lntegrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1 , ES-301 -2, ES-301 -5, ES-D-1, ES-401 -1 t2, ES-401 N-1 /2, ES-401 -3, ES-401 N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)?c85)7 Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)9,{-60}8.Proposed examinations (including written, walk{hrough JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1 , or ES-301-2 updates), and reference materials due (C.1.e, f, g and h;c.3.d)?-45 L Written exam and operating test reviews completed. (C.3.f)*-30 10. Preliminary license applications (NRC Form 398's) due (C.1.1; C.2.g; ES-202)9.-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)?-21 12. Examinations reviewed with faciliÇ licensee (e1.j;C.2.

and h; C.3.9)4.-14 13. Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i; ES-202)(-14 14.Written examinations and operating tests approved by NRC supervisor (C.2.i;c.3.h)Ø7 15.Facility licensee management queried regarding the licensee's views on the examination. (C.2 j)?7 16.Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications

/ eligibility; and examination approval and waiver letters sent (C.2.i;Attachment 5; ES-202, C.2.e; ES-204)?7 17 Proctoring/written exam administration guidelines reviewed with facility licensee (c.3.k)h-7 18.Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)h* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.[Applies only] {Does not apply} to examinations prepared by the NRC.