ML17205A232

From kanterella
Jump to navigation Jump to search
2017 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
ML17205A232
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Jesse Seymour
Operations Branch III
To:
Point Beach
Shared Package
ML16319A340 List:
References
Download: ML17205A232 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-l Facility: Poi,t B¿ach N^rl¿rr Pl^"1 Date or Examination: E/g/l-St/n Developed by: Written: Facilif K NRC

// Operating Facility NRC Target Date*

Task Description (Reference)

Chief Examiner's lnitials

-180

1.

Examination administration date confirmed (C.1.a; C.2.a and b)

?

-1 50

2.

NRC examiners and facility contact assigned (C.1.d; C.2.e)

?

-1 50

3.

Facility contact briefed on security and other requirements (C.2.c)

?

-1 50

4.

Corporate notification letter sent (C.2.d) 9/

l-1201

5.

Reference material due (C.1.e; C.3.c; Attachment 3)

N/n

{-e0}

b.

lntegrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1,

ES-301 -2, ES-301 -5, ES-D-1, ES-401 -1 t2, ES-401 N-1 /2, ES-401 -3, ES-401 N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)

?

c85) 7 Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e) 9,

{-60}

8.

Proposed examinations (including written, walk{hrough JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; c.3.d)

?

-45 L

Written exam and operating test reviews completed. (C.3.f)

-30

10. Preliminary license applications (NRC Form 398's) due (C.1.1; C.2.g; ES-202) 9.

-21

11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)

?

-21

12. Examinations reviewed with faciliÇ licensee (e1.j;C.2. and h; C.3.9) 4.

-14

13. Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i; ES-202)

(

-14 14.

Written examinations and operating tests approved by NRC supervisor (C.2.i; c.3.h)

Ø 7

15.

Facility licensee management queried regarding the licensee's views on the examination. (C.2 j)

?

7 16.

Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; ; ES-202, C.2.e; ES-204)

?

7 17 Proctoring/written exam administration guidelines reviewed with facility licensee (c.3.k) h

-7 18.

Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) h

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.