ML13353A591

From kanterella
Revision as of 10:37, 3 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Presentation Slides from Nrc/Pg&E December 5, 2013, Public Meeting on Humboldt Bay Power Plant Emergency Plan
ML13353A591
Person / Time
Site: Humboldt Bay, Zion
Issue date: 12/05/2013
From:
PG&E Corp
To:
NRC/FSME
References
Download: ML13353A591 (1)


Text

I ýr&l 4 2-Significant source term reduction

-Analysis shows no longer reach Alert or NUE forradiological events -would like to eliminate

-Elimination of EAL requires prior approval-Would still have security and tsunami events and allISFSI emergencies

-Reduction in Emergency Advisor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> response tothe site-Would still maintain Part 50 reporting requirements (i.e., transport of a radioactively contaminated person to an offsite medical facility)

-Submittal planned for late 2nd quarter 2014