Presentation Slides from March 7, 2011, Meeting with Humboldt Bay Power Plant Unit 3, on Decommissioning, License Termination, & Alternate Disposal Exemption Request
ML110670527
Person / Time
Site: Humboldt Bay
Issue date: 03/07/2011
From:
Pacific Gas & Electric Co
To:
NRC/FSME
References
Download: ML110670527 (23)


Text

hnirit IH Pr D

r)prn I

U

O bj ect.......v 1111

  • Initiate License Termination Plan (LTP) review process with the NRC

" Provide overview of path forward

- Schedule

- Issues/Concerns

  • Methodology of Derived Concentration Guideline Levels (DCGLs)
  • Final Status Survey (FSS) release criteria

Site Desc iptiOn

" Humboldt Bay Power Plant.(HBPP) Unit 3 a 220 MWt (65 Mwe) Boiling Water Reactor

" HBPP Unit 3 operated commercially from August 1963 until July 1976

" Unit 3 is on same site as the ISFSI, fossil Units 1 and 2 and recently completed 10 unit Humboldt Bay Generating Station (HBGS) 3

i i

.... a j.o Major Activte I'7,

  • HBGS completed construction and startup (2010)
  • Units I and 2 demolition (2010-2011)
  • Reactor vessel removal (2012)
  • Removal and demolition of Unit 3 piping, components and structures (2010-2014)
  • Site FSS (2015-2016) z-I

W tFI Li ce nse Te r m i.n.atio Apply "lessons learned" from previous LTP submittals Draw upon experience of HBPP personnel Maintain open dialogue early with the NRC and Stakeholders

§-r A strong foundation provides for defensible program a strong, 5

__00

'%6-A,-%0

.. %N I'

i~ cense Term inati ion-Historical Site Assessment (HSA) developed Performed characterizations Developed site specific DCGLs Develop and Submit LTP, License Amendment Request (LAR), HSA

>Public Meeting

>NRC Approval/License Amendment Develop FSS Program Perform FSS Submit Final Reports NRC Terminates License 6

'LT F Sc.hedu I 'EkIVIi Develop DCGLs Complete LTP Meeting with NRC March 7, 2011 Write LTP In Progress I

Submit LTP December 2011 7

3 LL&Issess M,

" Personal interviews of former HBPP personnel employed during Unit 3 operations

" Documents reviewed

- Plant operating reports and logs

- Licensee Event Reports

- Construction and as-built drawings

- Maps and photographs

- Environmental and radiological characterization reports

" Submit with LTP 8

aracterizat.ons

" Characterization performed in 1997

- MARSSIM based sampling survey

" A comprehensive characterization effort performed in 2007-2008

- Surface scans and fixed-point measurements

- Soil sampling and gamma walkovers

" Ongoing characterization of the site

- Excavation soil sampling

- Cross-Contamination Prevention & Monitoring Plan 9

Formulate an initial list of potential nuclides yes no 10

DCGLs

  • ~

ýtl Site-Specific Suite of Nuclides H-3 1-129 Pu-241 C-14 Cs-137 Am-241 Ni-59 Eu-152 Cm-243 Co-60 Eu-I 54 Cm-244 Ni-63 Np-237 Cm-245 Sr-90 Pu-238 Cm-246 Nb-94 Pu-239 Tc-99 Pu-240 11

DCGLs

" HBPP Unit 3 located on an industrial site co-located with electricity producing units (HBGS)

  • Humboldt Bay site essential to electrical needs in the area
  • No better site available in the region to locate generating stations Infrastructure in place Remote location California Coastal Commission Environmental impact

- Active Switchyard

- Transmission/Distribution

- Natural Gas 12

DCGLs

'I Scenarios 0 Building Surfaces

- Industrial Worker

- Parameters

  • Soils

- Industrial Worker

- Parameters 13

"evel op F S S Proga.m rX 11

  • Develop HBPP Site-Specific FSS Procedures
  • Develop Technical Basis Documents as necessary to support FSS effort
  • Compi Ie Survey Unit FSS Survey Packages for each Survey Area
  • Identify fin
  • Perform nE a Iclassifications for Survey Units

.cessary reviews and approvals of FSS Survey Packages 14

I I Perftorm

..... F

  • Take isolation and controls of units
  • Perform any investigations
  • Perform Data Quality Assessment (DQA) on data
  • Formulate decision based on Data Quality Objectives (DQOs)
  • Archive data 15

Submit Final eports i t-a i m

~1 e Write "Pilot Report"

  • Compile records when all Survey Units in a Survey Area complete
  • Write and submit Final Report for each Survey Area
  • Archive the report 16

u:Lture Interacti ons

!II

" Teleconference Meetings

" Correspondence

" Public Meeting(s) 17

NRC/PG&E MEETING MARCH 7,2011 HUMBOLDT BAY POWER PLANT ALTERNATE DISPOSAL EXEMPTION REQUEST Pacific Gas and Electric Company"

PURPOSE and AGENDA rDiscuss results of first exe mption request

  • 1 r;-Discuss proposed second exe mption request 2

FIRST EXEMPTION REQUEST go-

-b

  • . April 1, 2010

- PG&E Submits Request for 200,000 cu. ft.

July 16, 2010

- NRC Submits Questions rt July 29, 2010 - NRC/PG&E Public Meeting r;7 August 12, 2010-PG&E Submits Revised Request v-, November 2, 2010-r December 16, 2010 NRC Approves

- State of Idaho Concurs 3

FIRST EXEMPTION REQUEST Concentration Limits in First Exemption Request r Actual Concentration Values (to date) 4

SECOND EXEMPTION REQUEST r' Proposed for 2,000,000 cu. ft.

  • Basis for Volume
  • Similar to First Request
  • - Concentration Limits from First Request V Isotope Concentrations Based on Actual Shipments/Disposal
  • Dose Estimates for Second Request

.Submittal Expected in Mid-2011 5

CONCLUSIONS Con mments/Questions 6