Presentation Slides from 1/19/05 Meeting with Pacific Gas and Electric on Humboldt Bay Power Plant Special Nuclear Material Control and Accountability Project
ML050210264
Person / Time
Site: Humboldt Bay
Issue date: 01/19/2005
From:
- No Known Affiliation
To:
NRC/FSME
References
Download: ML050210264 (15)


Text

I ..

NRC/PG&E MEETING Humboldt Bay Power Plant Special Nuclear Materia I Control & Accountability Project January 19, 2005 1

AGENDAlo d Scope of Special Nuclear Material (SNM) Project

  • Status of SNM Project d Completion of A-49 objective d SNM Project final report d Future communications 2

SCOPE OF SNM PROJECT

  • Obtain full accountability and control of all SNM at HBPP 0 Accurate 742 inventory report, including fuel fragments I Procedures and controls to ensure inventory accuracy and positive control maintained in the future

- Address unaccounted for A-49 fuel segments U Locate A-49 segments or identify, analyze, and assess likelihood of possible locations of A-49 segments (scenarios) o Public and worker health and safety significance evaluated for possible scenarios o History of processes and controls over SNM at HBPP - cause analysis of SNM accountability issues and A-49 discrepancy 3

STATUS OF SNM PROJECT

  • Completed work:
  • Procedures revised/developed for handling and accounting of fuel fragments
  • Technical Specifications amended to incorporate fuel fragments in licensing basis 0 Tabulated and characterized all found fuel fragments for SNM accounting o 742 Report expanded to include fuel fragments o Stored all found fuel fragments for positive SNM control o Updated spent fuel pool (SFP) map to identify physical locations of all found SNM 4

STATUS OF SNM PROJECT (cont.)

  • Work to be completed in January 2005 o SFP search for fuel fragments and A-49 segments o Onsite non-SFP search for A-49 segments o Tabulation of fuel fragments for SNM accounting
  • Storage of fuel fragments for SNM control
  • SNM Project interim reports by February 18, 2005 o Results of SFP and non-SFP searches

> Analysis of possibility that A-49 segments have been found o Current SNM control and accountability finalized o Theft or diversion of A-49 rod segments evaluated

  • Completion of SNM full accountability & control objective o Update of SFP map to identify SNM physical locations o Perform physical inventory o Issue 742 Report including fuel fragment accounting information 5

COMPLETION OF A-49 OBJECTIVE mJanuary through April activities o Complete documentation search o Complete interviews o Development and resolution -of scenarios

  • SNM Project final report by May 15

. LER revision by June 15 o Includes final SNM Project report information 6

SNM PROJECT FINAL REPORT m Scenarios/possible locations for the three A-49 rod segments m Level of detail for scenarios

  • Discrepancies, inconsistencies and missing information in the historical control and accountability of SNM 7

Scenarios/Possible Locations for the Three A-49 Rod Segments o In the SFP o Onsite storage outside SFP o Licensed Low Level Radioactive Waste storage facilities

  • Hanford
  • Barnwell
  • Beatty o Other direct shipments
  • Nuclear Fuel Services
  • GE Vallecitos
  • Battelle Laboratories o Theft or Diversion 8

Level of Detail for Scenarios

  • Screens o Plausible/Not Plausible Determination

> Low Level Radioactive Waste shipments from outside SFP

> Low Level Radioactive Waste shipments from SFP

  • Time frame
  • Physical size
  • Properties
  • Plausible scenario probabilities o Highly improbable
  • Possible but unlikely o Reasonably possible
  • Public and worker health and safety significance evaluated for possible but unlikely and reasonably possible scenarios 9

Discrepancies, Inconsistencies and Missing Information in the Historical Control and Accountability of SNM

  • Comprehensive records review and interviews
  • Additional record discrepancies, if any, identified and resolved o Additional information on SNM accountability identified
  • Discussion of history of control and accountability of SNM at HBPP o Review of processes, procedures and controls employed at HBPP o Discrepancies discovered o Missing information identified o Cause analysis for A-49 rod segments o Corrective actions 10

I.

FUTURE COMMUNICATIONS

  • Meet with Community Advisory Board to provide project updates and future actions U Status updates to and discussions with stakeholders
  • Issue press release associated with completion of SFP search
  • Continue bi-weekly conference calls until SNM Project final report issued m Continue weekly status reports until SNM Project final report issued m Meet with NRC as necessary m Public meeting(s) in Eureka as NRC desires 11

4r C f(- ;

cede IL :0o

/00

-.Ma f- r Off!