ML103350355

From kanterella
Jump to navigation Jump to search
Presentation Slides from November 17, 2010, Meeting with Zionsolutions on Compliance with New 73.55
ML103350355
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/17/2010
From:
ZionSolutions
To:
Office of Nuclear Reactor Regulation
References
Download: ML103350355 (18)


Text

ZIONSOLUTIONSLC An EnergySoi*ions Company

Closing of the ZIONSOLUTIONSLW An EnergySolutlons Company Asset Sale Agreement

" ZionSolutions (ZS) and Exelon Closed on Sept. 1

" NRC transferred the 10 CFR 50 Licenses (LTA Order)

" The Trust Fund has been transferred to a new trust manager (Mellon)

  • ZS currently staffing up to perform decommissioning work
  • The Exelon site staff will remain under a lease agreement to support the plant ops/maint.

2

Asset Sale Agreement ZIONSOLUTIONSLLC An EnergySolutions Company Asset Sale Agreement with Exelon Nuclear, EnergySolutions has;

-. Acquired the assets of Zion Station

- Leased the land from Exelon

- Taken responsibility for spent nuclear fuel

- The NRC licensee for Zion Station

- Assumed all liabilities and obligations for decommissioning and -site restoration, end state is the return the site to Exelon in 10 Years 3

ZIONSOLUTIONSLLC Level One Schedule An Er*WSokftns Company Contract Milestones_____________ __________________________ ____ __ _______

  1. Co.*actbq*w.M z C~waftft C."
  1. Co.*ac RKPi 4P Sb.*Md h,
  • C-A- Roq&-- -M*wliqup Rt~.- Co4 Spent Fuel Dispoition I ISFSI_______ ______________-______ _____________

Sizzsd ConkiSYS-o

,ansfw to Cr CA ________

NRC License Termination ____________ ______ _____________ ______ ______ ______

  • Pdfl US-U rVipa4.i.s,

-ww - -. w -&V~

~fl-Rd~qsqIcooqone.

4219-No-Rde4,I ww UM2UI s5 f in5. qohI.94.Pdat Ik~

-~A U2- Mw E..* ~ Tl.M oetrpley

________________ Bulkif

&oB2 to,wtww,rLd "N-* A ZAON&2LUmse omwa

Overview of Project ZIONSOLUTIONSLLC An EnefgSMA-~n Conpe-y

  • 3 Major Phases of work

- Spent Fuel (wet to dry)

- License Termination

- Site restoration

° Critical path through the Reactor Vessels

° Highest cost scopes of work include the fuel campaign and reactor vessel segmentation

  • Total duration is estimated to be 10 years 5

Overview ZIONSOLUTIONSLLC An EegautosC-"Man I

-u

!~

6

Power Reactor Security Rule Compliance ZIONSOLUTIONSLLC An EnergySolutions Company November 17, 2010

ZIONSOLUTIONSLLC AnE Company orgySolutions Ag e n d a

  • Introductions
  • Purpose
  • Project Overview

" Response to NRC Letter

" Exemption Request

  • Security Plan Changes

" Summary November 17, 2010 2

ZIONSOLUTIONSLLC An EnergySouIons Company Attendees

" Eileen Moore - Security Manager

" Gerry van Noordennen - Licensing Consultant November 17, 2010 3

ZIONSOLUTIONSLLC An EnergySotfions Company

-Purpose of Meeting

  • Discuss draft response to August 2, 2010 NRC letter
  • Discuss draft exemption request to portions of 10 CFR 73.55 that are either not applicable to a plant undergoing decommissioning or conflict with previous exemptions November 17, 2010 4

ZIONSOLUTIONSLLC An EnergySolutions Company Response to NRC Letter

  • ZionSolutions has made a good-faith effort to interpret.and implement the new rule
  • Assume all previous security exemptions are still valid under the new 73.55
  • Created a compliance matrix that compares the new rule with the old version, discusses compliance and applicability to the Zion Nuclear Power Station
  • Determine if there are any security or health and safety gaps
  • Identify need for exemptions November 17, 2010 5

ZIONSOLUTIONSLLC An EnorgySolufions Company Exemption Request Exemption Request Grouped by Specific Topics:

- Cyber Security Program and Plan

-Design Basis Threat

- Force-on-Force

- Target Sets

- Performance Evaluation Program

- Access Authorization November 17, 2010 6

ZIONSOLUTIONSLLC A, EnergySoltons Company Exemption Request (cont.)

. Exemption Request Grouped by Specific Topics:

- Insider Mitigation Program

- Vital and Protected Areas

- Part 26 Requirements

-Training and Qualification Plan

- Safeguards Contingency Plan

-Appendix B Requirements November 17, 2010 7

ZIONSOLUTIONSLLC An EnergySolutions Company Exemption Request (cont.)

e Exemption Request Grouped by Specific Topics:

- Physical Barrier Requirements

- Isolation Zone

- Waterway Approaches

- Owner Controlled Area Searches

- Restricted and Security Area Searches

- Intrusion Detection November 17, 2010 8

ZIONSOLUTIONSLLC A, EnergySolutions Company Exemption Request (cont.)

Exemption Request Grouped by Specific Topics:

- Alarm Stations

- Illumination

- Backup Power

- Response Requirements

- Suspension of Security Measures

- Weapons Training Personnel Equipment November 17, 2010 9

ZIONSOLUTIONSLLC An EnergySoftdions Company Security Plan Changes

  • Changes to reflect ZionSolutions submitted November 1, 2010
  • Changes to reflect new exemption to be submitted 120 days after exemption is issued

ZIONSOLUTIONSLLC ..... Zion ISFS!

  • ZionSolutions will transfer the spent fuel and GTCC waste to an onsite ISFSI located next to an existing Commonwealth Edison switchyard

" A security plan revision and revised exemption request are planned in the future once detailed design is completed November 17, 2010 11

ZIONSOLUTIONSLLC A, EnorgySolutons Company Summary

  • Questions November 17, 2010 12