ZIONSOLUTIONSLC An EnergySoi*ions Company
Closing of the ZIONSOLUTIONSLW An EnergySolutlons Company Asset Sale Agreement
" ZionSolutions (ZS) and Exelon Closed on Sept. 1
" NRC transferred the 10 CFR 50 Licenses (LTA Order)
" The Trust Fund has been transferred to a new trust manager (Mellon)
- ZS currently staffing up to perform decommissioning work
- The Exelon site staff will remain under a lease agreement to support the plant ops/maint.
2
Asset Sale Agreement ZIONSOLUTIONSLLC An EnergySolutions Company Asset Sale Agreement with Exelon Nuclear, EnergySolutions has;
-. Acquired the assets of Zion Station
- Leased the land from Exelon
- Taken responsibility for spent nuclear fuel
- The NRC licensee for Zion Station
- Assumed all liabilities and obligations for decommissioning and -site restoration, end state is the return the site to Exelon in 10 Years 3
ZIONSOLUTIONSLLC Level One Schedule An Er*WSokftns Company Contract Milestones_____________ __________________________ ____ __ _______
- Co.*actbq*w.M z C~waftft C."
- Co.*ac RKPi 4P Sb.*Md h,
- C-A- Roq&-- -M*wliqup Rt~.- Co4 Spent Fuel Dispoition I ISFSI_______ ______________-______ _____________
Sizzsd ConkiSYS-o
,ansfw to Cr CA ________
NRC License Termination ____________ ______ _____________ ______ ______ ______
- Pdfl US-U rVipa4.i.s,
-ww - -. w -&V~
~fl-Rd~qsqIcooqone.
4219-No-Rde4,I ww UM2UI s5 f in5. qohI.94.Pdat Ik~
-~A U2- Mw E..* ~ Tl.M oetrpley
________________ Bulkif
&oB2 to,wtww,rLd "N-* A ZAON&2LUmse omwa
Overview of Project ZIONSOLUTIONSLLC An EnefgSMA-~n Conpe-y
- 3 Major Phases of work
- Spent Fuel (wet to dry)
- License Termination
- Site restoration
° Critical path through the Reactor Vessels
° Highest cost scopes of work include the fuel campaign and reactor vessel segmentation
- Total duration is estimated to be 10 years 5
Overview ZIONSOLUTIONSLLC An EegautosC-"Man I
-u
!~
6
Power Reactor Security Rule Compliance ZIONSOLUTIONSLLC An EnergySolutions Company November 17, 2010
ZIONSOLUTIONSLLC AnE Company orgySolutions Ag e n d a
- Introductions
- Purpose
- Project Overview
" Response to NRC Letter
- Security Plan Changes
- Future Zion ISFSI
" Summary November 17, 2010 2
ZIONSOLUTIONSLLC An EnergySouIons Company Attendees
" Eileen Moore - Security Manager
" Gerry van Noordennen - Licensing Consultant November 17, 2010 3
ZIONSOLUTIONSLLC An EnergySotfions Company
-Purpose of Meeting
- Discuss draft response to August 2, 2010 NRC letter
- Discuss draft exemption request to portions of 10 CFR 73.55 that are either not applicable to a plant undergoing decommissioning or conflict with previous exemptions November 17, 2010 4
ZIONSOLUTIONSLLC An EnergySolutions Company Response to NRC Letter
- ZionSolutions has made a good-faith effort to interpret.and implement the new rule
- Assume all previous security exemptions are still valid under the new 73.55
- Created a compliance matrix that compares the new rule with the old version, discusses compliance and applicability to the Zion Nuclear Power Station
- Determine if there are any security or health and safety gaps
- Identify need for exemptions November 17, 2010 5
ZIONSOLUTIONSLLC An EnorgySolufions Company Exemption Request Exemption Request Grouped by Specific Topics:
- Cyber Security Program and Plan
-Design Basis Threat
- Force-on-Force
- Target Sets
- Performance Evaluation Program
- Access Authorization November 17, 2010 6
ZIONSOLUTIONSLLC A, EnergySoltons Company Exemption Request (cont.)
. Exemption Request Grouped by Specific Topics:
- Insider Mitigation Program
- Vital and Protected Areas
- Part 26 Requirements
-Training and Qualification Plan
-Appendix B Requirements November 17, 2010 7
ZIONSOLUTIONSLLC An EnergySolutions Company Exemption Request (cont.)
e Exemption Request Grouped by Specific Topics:
- Physical Barrier Requirements
- Isolation Zone
- Waterway Approaches
- Owner Controlled Area Searches
- Restricted and Security Area Searches
- Intrusion Detection November 17, 2010 8
ZIONSOLUTIONSLLC A, EnergySolutions Company Exemption Request (cont.)
Exemption Request Grouped by Specific Topics:
- Alarm Stations
- Illumination
- Backup Power
- Response Requirements
- Suspension of Security Measures
- Weapons Training Personnel Equipment November 17, 2010 9
ZIONSOLUTIONSLLC An EnergySoftdions Company Security Plan Changes
- Changes to reflect ZionSolutions submitted November 1, 2010
- Changes to reflect new exemption to be submitted 120 days after exemption is issued
- Assume Enforcement Discretion to continue until new exemption is implemented November 17, 2010 10
ZIONSOLUTIONSLLC ..... Zion ISFS!
- ZionSolutions will transfer the spent fuel and GTCC waste to an onsite ISFSI located next to an existing Commonwealth Edison switchyard
" A security plan revision and revised exemption request are planned in the future once detailed design is completed November 17, 2010 11
ZIONSOLUTIONSLLC A, EnorgySolutons Company Summary
- Questions November 17, 2010 12