MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] Category:Licensee Event Report (LER)
MONTHYEARNL-20-0230, Edwin I. Hatch Nuclear Plant, Unit 2, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2020-03-0202 March 2020 Edwin I. Hatch Nuclear Plant, Unit 2, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) 05000366/LER-2020-0012020-03-0202 March 2020 LER 2020-001-00 for Edwin I. Hatch Nuclear Plant, Unit 2, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) 05000321/LER-2017-0042017-08-24024 August 2017 Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications, LER 17-004-00 for Edwin I. Hatch Regarding Safety Relief Valves' as Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria 05000366/LER-2017-0022017-04-13013 April 2017 Emergency Diesel Generator Start Due to Inadvertent Electrical Bus De-Energization, LER 17-002-00 for Edwin I. Hatch, Unit 2, Regarding Emergency Diesel Generator Start Due to Inadvertent Electrical Bus De-Energization 05000366/LER-2017-0032017-04-13013 April 2017 LER 17-003-00 for Edwin I. Hatch, Unit 2, Regarding Primary Containment Isolation Penetration Exceeded Overall Allowable Technical Specification Leakage Limits 05000321/LER-2017-0022017-04-0707 April 2017 High Pressure Coolant Injection System Declared Inoperable Due to Degraded Inverter, LER 17-002-00 for Edwin I. Hatch, Unit 1, Regarding High Pressure Coolant Injection System Declared Inoperable Due to Degraded Inverter 05000366/LER-2016-0042017-01-0303 January 2017 Condition Prohibited by Technical Specifications Due to Inoperable PCIV, LER 16-004-00 for Edwin I. Hatch Nuclear Plant, Unit 2, Regarding Condition Prohibited by Technical Specifications Due to Inoperable PCIV 05000366/LER-2016-0022016-07-13013 July 2016 Group I Isolation Received During Turbine Testing, LER 16-002-00 for Edwin I. Hatch, Unit 2, Regarding Group 1 Isolation Received During Turbine Testing 05000366/LER-2016-0012016-06-0808 June 2016 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability, LER 16-001-00 for E.I. Hatch, Unit 2, Regarding 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability 05000321/LER-2016-0042016-05-26026 May 2016 Safety Relief Valves As Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria, LER 16-004-00 for Edwin I. Hatch Nuclear Plant Unit 1 RE: Safety Relief Valves as Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria 05000321/LER-2016-0032016-04-14014 April 2016 Reactor Coolant System Piping Has Unacceptable Weld Indication Discovered During Refueling Outage, LER 16-003-00 for E.I. Hatch, Unit 1, Regarding Reactor Coolant System Piping Has Unacceptable Weld Indication Discovered During Refueling Outage 05000321/LER-2016-0022016-04-11011 April 2016 Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment, LER 16-002-00 for E.I Hatch, Unit 1, Regarding Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment 05000321/LER-2016-0012016-04-0808 April 2016 Performance of Fuel Movement with Inoperable Rod Position Indication System in Violation of Technical Specifications, LER 16-001-00 for Edwin I. Hatch, Unit 1, Regarding Performance of Fuel Movement With Inoperable Rod Position Indication System in Violation of Technical Specifications NL-08-1906, LER 08-S01-00, for Edwin I. Hatch, Failure to Report Arrest Results in Inappropriate Access to Protected and Vital Areas2008-12-19019 December 2008 LER 08-S01-00, for Edwin I. Hatch, Failure to Report Arrest Results in Inappropriate Access to Protected and Vital Areas ML1019404552008-05-0808 May 2008 Southern Nuclear Plant E. I. Hatch - Actions for Potential Groundwater Contamination Events NL-06-2726, LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access2006-12-0505 December 2006 LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access ML17252B4401976-04-15015 April 1976 LER 76-026-00 for Hatch, Unit 1 Regarding an Occurrence of Open Links in Panel H11-P601 Defeating the Starting of All RHR Pumps After They Had Been Stopped 2020-03-02
[Table view] |
Text
Charles R. Pierce Regulatory AHairs Director April 15, 2015 Docket Nos.: 50-366 Southern Nuclear Operating
- Company, Inc. 40 Inverness Center Parkway Post OHice Box 1295 Birmingham, AL 35201 Tel 205.992.7872 Fax 205.992.7601 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Licensee Event Report 2015-002-00 SOUTHERN A COMPANY NL-15-0684 Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Ladies and Gentlemen:
In accordance with the requirements of 10 CFR 50.73(a)(2)(i)(B),
Southern Nuclear Operating Company hereby submits the enclosed Licensee Event Report. This letter contains no NRC commitments.
If you have any questions, please contact Greg Johnson at (912) 537-5874.
ReC1!iJ:/'
C. R. Pierce Regulatory Affairs Director CRP/jcm
Enclosure:
LER 2015-002-00
Edwin I. Hatch Nuclear Plant Licensee Event Report 2015-002-00 Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Enclosure LER 2015-002-00 X NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0104 EXPIRES:
01/31/2017 (02-2014)
Estimated burden per response to comply with this mandatory collection request:
80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. ,,..-..., LICENSEE EVENT REPORT (LER) Reported lessons learned are incorporated into the licensing process and fed back to industry.
Send comments regarding burden estimate to the FOIA, Privacy and lnfonmation Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-000t, or by internet e*mailto lnlocollects.Resource@nrc
.gov, and to the Desk Officer, Office ollnlonmation and Regulatory
- Affairs, NEOB-10202
, (3150-0104),
Office of Management and Budget, Washington, DC 20503. II a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the inlonmation collection.
- 1. FACILITY NAME 2. DOCKET NUMBER 3. PAGE Edwin I. Hatch Nuclear Plant Unit 2 05000 366 1 OF 3 4. TITLE Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment
- 5. EVENT DATE 6. LEA NUMBER 7. REPORT DATE 8. OTHER FACILITIES INVOLVED YEAR I SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR NUMBER NO. MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 02 16 2015 2015 -002 -00 04 15 2015 9. OPERATING MODE 11. THIS REPORT IS SUBMITIED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: {Check all that apply) D 20.2201 (bl 0 20.2203(a)(3)(i) 0 50.73(a)(2)(i)(C)
D 50.73(a)(2)(vii)
D 20.2201 (dl 0 20.2203(a)(3)(ii)
D 50.73(a)(2)(ii)(A)
D 50.73(a)(2)(viii)(A) 5 0 20.2203(a)(1) 0 20.2203(a)(4) 0 50.73(a)(2)(ii)(B)
D 50.73(a)(2)(viii)(B) 0 20.2203(a)(2)(i) 0 50.36(c)(1
)(i)(A) D 50.73(a)(2)(iii)
D 50.73(a)(2)(ix)(A)
- 10. POWER LEVEL 0 20.2203(a)(2)(ii)
D 50.36(c)(1
)(ii)(A) 0 50.73(a)(2)(iv)(A)
D 50.73(a)(2)(x) 0 20.2203(a)(2)(iii)
D 50.36(c)(2)
D 50.73(a)(2)(v)(A)
D 73.71(a)(4) 0 20.2203(a)(2)(iv) 0 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(B)
D 73.71 (a)(S) 0 0 20.2203(a)(2)(v) 0 50.73(a)(2)(i)(A)
D 50.73(a)(2)(v)(C)
D OTHER 0 20.2203(a)(2)(vi)
IZI 50. 73(a)(2)(i)(B) 0 50.73(a)(2)(v)(D)
Specify In Abstract below or in NRC Form 366A 12. LICENSEE CONTACT FOR THIS LEA LICENSEE CONTACT NUMBER (Include Area Code} Edwin I. Hatch I Steven Tipps -Licensing Supervisor 912-537-5880
- 13. COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT CAUSE SYSTEM COMPONENT MANU* REPORTABLE CAUSE SYSTEM COMPONENT MANU-REPORTABLE FACTURER TO EPIX FACTURER TO EPIX 14. SUPPLEMENTAL REPORT EXPECTED 15.EXPECTED MONTH DAY YEAR 0 YES (If yes, complete
- 15. EXPECTED SUBMISSION DATE) IZI NO SUBMISSION DATE ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) On February 16, 2015, February 18 through 19, 2015, and February 23 through 24, 2015 operations with the potential to drain the reactor vessel (OPDRV) activities were performed while Unit 2 remained in Refueling Mode (Mode 5) without an operable secondary containment.
These activities are prohibited by Technical Specifications (TS) 3.6.4.1.
- However, recent NRC guidance provided in Enforcement Guidance Memorandum (EGM) 11-003, Revision 2 and in Regulatory Issue Summary (RIS) 2012-11 allowed the implementation of interim actions as an alternative to full compliance
. These actions are compiled in the operating procedure for the OPDRV activities performed during the 2015 Hatch Unit 2 Refueling Outage in February.
!he performance of OPDRV activities were planned activities that were completed under the guidance of plant procedures and confirmed to have low safety significance based on interim actions taken. Since these actions were deliberate, no cause determination was necessary.
A licensee amendment request (LAR) will be submitted following NRC approval of the Technical Specification Task Force (TSTF) Traveler associated with generic resolution of this issue (TSTF-542).
NRC FORM 366 (02*2014) jNRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0104 EXPIRES:
01131/2017 02*2014) Estimated burden per response to comply with this mandatory collection request:
80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> . .,..... ....... ,, Reported lessons teamed are incorporated into the process and led back to industry. LICENSEE EVENT REPORT {LER) Send comments regarding burden estimate to the FOIA, rivacy and Information Collections Branch (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC 20555*0001
, or by internet e-mail to lnfocollects.Resource@nrc
.gov, and to the Desk Officer, Office ollnformation and Regulatgc
- Affairs, NEOB-10202, (3150-0104),
Office of Management and Budget, CONTINUATION SHEET Washington, 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME 2. DOCKET 6. LEA NUMBER 3. PAGE YEAR l SEQUENTIAL l REV NUMBER NO. Edwin I. Hatch Nuclear Plant Unit 2 05000 366 2 OF 3 2015 -002 -00 NARRATIVE PLANT AND SYSTEM IDENTIFICATION General Electric-Boiling Water Reactor (BWR) Energy Industry Identification System codes appear in the text as (EllS Code XX) DESCRIPTION OF EVENT In February 2015, with Unit 2 at 0 percent rated thermal power due to a scheduled refueling outage, operations with the potential to drain the reactor vessel (OPDRV) activities were performed while in Mode 5 (Refueling Mode) contrary to Technical Specification (TS) 3.6.4.1.
The NRC recognizes that such activities need to be performed during refueling outages.
Activities are underway to formulate acceptable generic changes to BWR Technical Specifications.
NRC Regulatory Issue Summary (RIS) 2012-11 communicated this guidance to the industry.
Enforcement Guidance Memorandum (EGM) 11-003, Revision 2 currently provides enforcement discretion for licensee noncompliance with TS containment requirements during OPDRV activities until December 31, 2015 while the NRC staff and Boiling Water Reactor Owner's Group finalize a generic solution forTS changes.
The required interim actions specified in the EGM were incorporated into plant procedure 31GO-OPS-025-0:
OPERATIONS WITH THE POTENTIAL TO DRAIN THE REACTOR VESSEL. This procedure was utilized during the following three occasions during the 2015 Unit 2 Refueling Outage: Table 1 :Hatch Unit 2 OPDRVs Performed February 2015 OPDRV Activity Start End LPRM Removal and Replacement 02/16/2015
, 0945 EST 02/16/2015, 2100 EST HCU Drive Push-Pull 02/1 8/2015, 2238 EST 02/19/2015, 2352 EST HCU High Point Vent 02/23/2015, 1635 EST 02/24/2015, 0325 EST CAUSE OF EVENT Implementation of the required EGM 11-003, Revision 2 interim actions during the 2015 Unit 2 Refueling Outage was a planned activity.
As such, no cause determination was performed for the events. REPORT ABILITY AND SAFETY ASSESSMENT This event is reportable per 10 CFR 50.73(a)(2)(i)(B) as an operation or condition prohibited by Technical Specifications (TS) 3.6.4.1.C.3, which prohibits performing activities identified as OPDRVs in Mode 5 while secondary containment is inoperable.
The OPDRVs discussed in this report performed during the Unit 2 Refueling Outage were accomplished using interim actions provided by the NRC in EGM 11-003, Revision
- 2. Hatch adhered to the NRC plain language meaning of OPDRV activities that could potentially result in draining of siphoning the reactor pressure vessel (RPV) water level below the top of the fuel. Hatch also met the requirements which specify the minimum makeup flow rate and water inventory based on OPDRV activities with long drain down times. Furthermore, an adequate defense in depth was maintained to minimize the potential for the release of fission products with secondary containment not operable by (a) monitoring RPV level to identify the onset of a loss of inventory event, (b) maintaining the capability to isolate the potential leakage paths, (c) prohibiting Mode 4 (cold shutdown)
OPDRV activities, and (d) prohibiting movement of irradiated fuel with the spent fuel storage pool gates removed in Mode 5. All other Mode 5 Technical Specifications requirements for OPDRV activities were NRC FORM 366A (02-2014)
NRC FORM 366A (02-2014) U.S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER) CONTINUATION SHEET 1. FACILITY NAME 2. DOCKET 6. LER NUMBER 3. PAGE OF YEAR I SEQUENTIAL I REV NUMBER NO. Edwin I. Hatch Nuclear Plant Unit 2 05000 366 3 2015 -002 -00 followed.
Since these compensatory measures were properly implemented, an adequate level of safety was provided during the performance of the OPDVR activities described in this report Based on this information, the performance of these OPDRV activities were determined to have a very low safety significance.
CORRECTIVE ACTIONS 3 Consistent with the guidance given in EGM 11-003 Revision 2, Hatch will submit a licensee amendment request (LAR) following NRC approval of the Technical Specifications Task Force (TSTF) Traveler associated with generic resolution of this issue within the time restraints given in the EGM. ADDITIONAL INFORMATION Other Systems Affected:
None. Failed Components Information:
None. Commitment Information:
This report does not created any new licensing commitments.
Previous Similar Events: LER 2013-002-00 On February 19, 2013, February 20, 2013, and February 25, 2013, OPDRV activities were performed while Unit 2 was in Refueling Mode (Mode 5) without an operable secondary containment These activities are prohibited by Technical Specifications (TS) 3.6.4.1.
- However, NRC guidance provided in Regulatory Issue Summary (RIS) 2012-11 and in Enforcement Guidance Memorandum (EGM) 11-003, Revision 1 allowed the implementation of interim actions as an alternative to full compliance.
An adequate defensed in depth was maintained to minimize the potential for the release of fission products with secondary containment not operable by (a) monitoring RPV level to identify the onset of a loss of inventory event, (b) maintaining the capability to isolate the potential leakage paths, (c) prohibiting Mode 4 (cold shutdown)
OPDRV activities, and (d) prohibiting the movement of irradiated fuel with the spent fuel storage pool gates removed in Mode 5. The associated Technical Specification Task Force (TSTF) Traveler is not yet available as a Technical Specification consolidated line item improvement process (CLIIP) for use by licensees.
For that reason, the corrective actions from this event would not be expected to have prevented the condition reported in this LEA. NRC FORM 366A (02-2014)