2015/12/14 NRR E-mail Capture - NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation
ML15352A006
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/14/2015
From: Schaaf R G
Plant Licensing Branch II
To: Beasley B G
Plant Licensing Branch II
References
Download: ML15352A006 (2)


Text

1NRR-PMDAPEm Resource From:Schaaf, Robert Sent:Monday, December 14, 2015 3:33 PM To:Beasley, Benjamin Cc:Waters, Michael; Darbali, Samir; Carte, Norbert

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware InstallationThis e-mail documents the NRC staff's acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staff's review of TVA's application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.

By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVA's December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.

NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.

Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o) Robert.Schaaf@nrc.gov Docket No. 50-390

Hearing Identifier: NRR_PMDA Email Number: 2567 Mail Envelope Properties (08aeeea949be4ef3822058ca57a891b9)

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date: 12/14/2015 3:33:22 PM Received Date: 12/14/2015 3:33:00 PM From: Schaaf, Robert Created By: Robert.Schaaf@nrc.gov Recipients: "Waters, Michael" <Michael.Waters@nrc.gov> Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> Tracking Status: None

Post Office: HQPWMSMRS07.nrc.gov Files Size Date & Time MESSAGE 1731 12/14/2015 3:33:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

1NRR-PMDAPEm Resource From:Schaaf, Robert Sent:Monday, December 14, 2015 3:33 PM To:Beasley, Benjamin Cc:Waters, Michael; Darbali, Samir; Carte, Norbert

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware InstallationThis e-mail documents the NRC staff's acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staff's review of TVA's application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.

By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVA's December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.

NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.

Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o) Robert.Schaaf@nrc.gov Docket No. 50-390

Hearing Identifier: NRR_PMDA Email Number: 2567 Mail Envelope Properties (08aeeea949be4ef3822058ca57a891b9)

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date: 12/14/2015 3:33:22 PM Received Date: 12/14/2015 3:33:00 PM From: Schaaf, Robert Created By: Robert.Schaaf@nrc.gov Recipients: "Waters, Michael" <Michael.Waters@nrc.gov> Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> Tracking Status: None

Post Office: HQPWMSMRS07.nrc.gov Files Size Date & Time MESSAGE 1731 12/14/2015 3:33:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: